Entry  Tue Oct 5 13:59:17 2010, Leo Singer, Configuration, Computers, Installed x264-devel on Allegra 
 I installed the package x264-devel on allegra.martian.  This package provides headers and libraries for the popular h264 video codec.  I
am going to use this in the GStreamer streaming media server on Allegra.
Entry  Tue Oct 5 13:46:26 2010, josephb, alex, Update, CDS, Restarted fb trending 
Fb is now once again actually recording trends.
A section of the daqdrc file (located in /opt/rtcds/caltech/c1/target/fb/ directory) had been commented out by Alex and never uncommented. 
This section included the commands which actually make the fb record trends.
    Reply  Tue Oct 5 13:52:15 2010, rana, Update, CDS, proof of trend Untitled.png
 
Entry  Tue Oct 5 11:42:20 2010, kiwamu, Summary, Green Locking, developing green locking plant green_sm3.png
 With a help from Joe, I made a diagram of the simulated plant for green locking in order to get better understanding and consensus.
Eventually these simulated plants will help us developing (sometimes debugging) the digital control systems.
Here is the diagram which tells us how we will setup and link the control/plant models and on which machine they will be running.
Entry  Tue Oct 5 09:26:04 2010, steve, Configuration, PEM, moved accelerometers 
Accelerometers xyz were moved from IOO-south/west  corner to under PSL table. They were turned off for ~20 minutes.
Guralp was also moved eastward about 2 ft. It is not leveled.
This is part of the preparation to remove access connector.
Entry  Mon Oct 4 19:48:00 2010, yuta, Update, VAC, several mirrors installed to ITMX/BS chamber P1060901.JPGP1060904.JPG
(Koji, Kiwamu, Yuta)
Lots of progress for the optics placement in the vacuum chamber.
Entry  Mon Oct 4 15:28:10 2010, josephb, Update, CDS, Trying to get c1ioo booting as Gentoo. 
I modified the dhcpd.conf file in /etc/dhcp on the fb machine.  I added a entry for c1ioo, listing its MAC address and ip number near the bottom
of the file.  I then restarted the dhcp server using "sudo /etc/init.d/dhcpd restart" while on the fb machine.
I also modified the rtsystab, which is used to determine which front end codes start on boot up of a machine.  I added a line: c1ioo  
Entry  Mon Oct 4 13:48:41 2010, Leo Singer, Configuration, Computers, Uninstalled gstreamer-devel and gstreamer-plugins-base-devel on rosalba 
 I uninstalled gstreamer-devel and gst-plugins-base-devel on Rosalba.  Here is the command I ran:
$ sudo yum remove gstreamer-devel gstreamer-plugins-base-devel
 
Entry  Mon Oct 4 11:20:45 2010, josephb, Update, CDS, Fixed Suspension binary output list and sus model 
I've updated the CDS wiki page listing the wiring of the 40m suspensions with the correct binary output channels.  I previously had confused the
wiring of the Auxillary crate XY220 (watchdogs) with the SOS coil dewhitening bypasses.  So I had wound up with the wrong channels (the physical cables
we plugged in were correct, just what I thought was going on channel X of that cable was wrong).  This has been corrected in the plan now.  The
Entry  Mon Sep 27 00:33:50 2010, rana, Update, PSL, High Voltage Driver added to TTFSS -> NPRO 
We added the Thorlabs HV Driver in between the FSS and the NPRO today. The FSS is locking with it, but we haven't taken any loop
gain measurements.
This box takes 0-10 V and puts out 0-150 V. I set up the FSS SLOW loop so that it now servos the output of FAST ot be at +5V instead of 0V. This
    Reply  Fri Oct 1 21:34:14 2010, rana, tara, Update, PSL, High Voltage Driver added to TTFSS -> NPRO NPROTF.png2010_10_01.png


    
        
            Quote:
        
        
            
            We added the Thorlabs HV Driver in between the FSS and the NPRO today. The FSS is locking with
       Reply  Mon Oct 4 06:47:46 2010, rana, tara, Update, PSL, High Voltage Driver added to TTFSS -> NPRO 
Inside the FSS box, the FAST path has a ~10 Hz pole made up from the 15k resistor and the 1 uF cap before the output connector.
This should be moved over to the output of the driver to make the driver happy - without
yet measuring the high frequency response,
Entry  Fri Oct 1 18:53:33 2010, josephb, kiwamu, Update, CDS, Things needing to be done next week 
We realized we cannot build code with the current RCG compiler on c1ioo or c1iscex, since these are not Gentoo machines.  We need either to get
a backwards compatible code generator, or change the boot priority (removing the harddrives also probably works) for c1ioo and c1iscex so they do the diskless
Gentoo thing.  This would involve adding some MAC address to the framebuilder dhcpd.conf file in /etc/dhcp along with the computer IPs, and then modifying
Entry  Fri Oct 1 18:19:24 2010, josephb, kiwamu, Update, CDS, c1sus work 
The c1sus model was split into 2, so that c1sus controls BS, PRM, SRM, ITMX, ITMY, while c1mcs controls MC1, MC2, MC3.  The c1mcs uses shared memory
to tell c1sus what signals to the binary outputs (which control analog whitening/dewhitening filters), since two models can't control a binary output.
This split was done because the CPU time was running above 60 microseconds (the limit allowable since we're trying to run at 16kHz). Apparently
Entry  Fri Oct 1 16:46:20 2010, steve, Bureaucracy, SAFETY, Yuta received 40m-101-safety training 
Our visiting graduate student Yuta Michimura received 40m specific basic safety training today.
Entry  Fri Oct 1 16:34:06 2010, josephb, Update, CDS, c1sus not booting due to fb dhcp server not running 
For some reason, the dhcp server running on the fb machine which assigns the IP address to c1sus (since its running a diskless boot) was down. 
This was preventing c1sus from coming up properly.  The symptom was an error indicated no DHCP offers were made(when I plugged a keyboard and monitor
in).
Entry  Fri Oct 1 14:13:29 2010, josephb, alex, Update, CDS, fb work that still needs to be done 
1) Need to check 1 PPS signal alignment

2) Figure out why 1PPS and ADC/DAC testpoints went away from feCodeGen.pl?
Entry  Fri Oct 1 11:53:42 2010, josephb, Configuration, CDS, Added RCG simlink files to the 40m svn 
I've added a new directory in /opt/rtcds/caltech/c1/core called rts_simlink.  This directory is now in the 40m svn.  Unfortunately, the simlink
files used to generate the front end c codes live in a directory controlled by the CDS svn.  So I've copied the .mdl files from /opt/rtcds/caltech/c1/core/advLigoRTS/src/epics/simLink/
into this new directory and added them into the 40m svn.  When making changes to the simlink files, please copy them to this new directory and check
Entry  Fri Oct 1 11:33:15 2010, josephb, alex, Configuration, CDS, Changing gds code to the new working version 
Alex is installing the newly compiled gds code (compiled on Centos 5.5 on Rosalba) which does in fact include the ezca type tools. 
At the moment we don't have a solaris compile, although that should be done at somepoint in the future.  It means the gds tools (diaggui,
foton, etc) won't work on op440m.  On the bright side, this newer gds code has a foton that doesn't seem to crash all the time on Linux.
Entry  Fri Oct 1 10:56:30 2010, josephb,alex, Update, CDS, fb work continued 
Alex fixed the time issue with the IRIG-B signal being far off, apparently their IRIG-B signal in downs seems to be different.  He simply corrected
for the difference in the two signals in the code.
For debugging purposes we uncommented the following line in the feCodeGen.pl script (in /opt/rtcds/caltech/c1/advLigoRTS/src/epics/util/):
Entry  Thu Sep 30 17:11:01 2010, alex i, Update, CDS, DAQ system update 
The frame builder is timed from the Symmetricom GPS card now, which is getting the IRIGB timecode from the freq. distribution amplifier (from the VME
GPS receiver card).
I have adjusted the GPS seconds to match the real GPS time and the DTT seems to be happy: sweeping MC2 MCL filter module produces nice plot.
    Reply  Thu Sep 30 21:55:31 2010, rana, Update, CDS, DAQ sys update Untitled.png
Its pretty exciting to see that Joe got Alex to actually use the ELOG. Its a proof that even rare events occur if you are patient enough.
1) I fixed the MEDM links to point to the new sitemap.adl in /opt/rtcds. There is a link on the new sitemap which points to the old sitemap so
that there is nothing destroyed yet.
Entry  Thu Sep 30 18:51:50 2010, yuta, Update, Computers, setting up aldabella and mariabella 
(Kiwamu, Yuta)

Background:
Entry  Thu Sep 30 16:29:35 2010, josephb, alex, Update, CDS, fb update 
There currently seems to be a timing issue with  the frame builder.  We switched over to using a symmetricom card to get an IRIG-B signal into
the fb machine, but the gps time stamp is way off (~80 years Alex said).
If there is a frame buiilder issue, its currently often necessary to kill the associated mx_stream processes, since they don't seem to restart
Entry  Thu Sep 30 14:09:33 2010, yuta, Update, Computers, mariabella connects to the wireless network 
Background:
 We need laptops that connect to the wireless network to use them in the lab.
Entry  Thu Sep 30 13:43:29 2010, steve, Update, SAFETY, propane gas smell in control room 
The control room's north west corner smelled like propane gas  yesterday around 16:30
We all agreed that the smell was real and I called the safety office. I was told that they received 6 other calls from different parts of the campus.
The smell disappeared in about a half an hour.
Entry  Thu Sep 30 11:07:20 2010, josephb, alex, Update, CDS, test points starting to work 
The centos 5.5 compiled gds code is currently living on rosalba in the /opt/app directory (this is local to Rosalba only).  It has not been fully
compiled properly yet.  It is still missing ezcaread/write/ and so forth.  Once we have a fully working code, we'll propagate it to the correct
directories on linux1.
Entry  Tue Sep 28 14:12:14 2010, steve, Update, General, vertex crane drive is out of order 
The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.
I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked
at all.
    Reply  Wed Sep 29 15:34:46 2010, kiwamu, Update, General, fixing vertex crane  

    
        
            
        
        
       
    From 
    Reply  Thu Sep 30 09:34:58 2010, steve, Update, General, vertex crane trolly drive fixed P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG


    
        
            Quote:
        
        
            
            The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.
Entry  Wed Sep 29 18:28:32 2010, yuta, Update, Computers, aldabella connects to the wireless network 
Background:
 We need laptops that connect to the wireless network to use them in the lab.
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday, and finished on Tuesday.
Entry  Wed Sep 29 12:08:28 2010, josephb, alex, Summary, CDS, Last burt save of old controls 
This is being recorded for posterity so we know where to look for the old controls settings.
The last good burt restore that was saved before turning off scipe25 aka c1dcuepics was on September 29, 11:07.
Entry  Wed Sep 29 11:18:36 2010, josephb, Update, CDS, Apps code changes 
After asking Alex specifically what he did yesterday after I left, he indicated he copied  a bunch of stuff from Hanford, including the latest gds,
fftw, libframe, root.  We also now have the new dtt code as well.  But those apparently were for the Gentoo build   After asking Alex about
the ezca tools this morning, he discovered they weren't complied in the gds code he brought over.  We are in the process of getting the source over
Entry  Wed Sep 29 01:53:44 2010, rana, Update, PSL, paths broken and VCO turned off 
I found that several linux libraries have been moved around and disabled today. In particular, I see a bunch of new stuff in apps/linux/ and ezca tools
are not working.
Who did this and why is there no ELOG ???
 
Entry  Tue Sep 28 21:11:52 2010, koji, tara, Update, Electronics, Fixing the new TTFSS before.jpgafter.jpgbefore.jpgafter.jpg
We found a small PCB defect which is an excess copper shorting circuit on the daughter board, 
 it was removed and the signal on mixer monitor path is working properly. 
 
Entry  Mon Sep 27 17:35:13 2010, josephb, Update, CDS, Updated Suspension screens/Megatron now c1ioo/Further work on fb MC1_Example_Screen.png
The medm screens have been updated further, with the hidden matrices added in bright colors.  An example screen shot is attached.
Megatron has been renamed c1ioo and moved to martian network.  Similarly, c1sus and c1iscex are also on the martian network.  Medm screens
can be run on any of the control machines and they will work.
    Reply  Tue Sep 28 10:07:29 2010, josephb, Update, CDS, Updated Suspension screens/Megatron now c1ioo/Further work on fb 


    
        
            Quote:
        
        
            
Entry  Mon Sep 27 08:59:50 2010, steve, Configuration, VAC, slow vent has started 
Blocked PSL output beam  into IFO
Checked: HV at IOO & OMC are off, jam nuts in position,
Closed V1 and VM3, opened VV1 to N2 regulator
    Reply  Tue Sep 28 00:07:45 2010, kiwamu, Configuration, VAC, Re: slow vent has started P1_history_100927.png
(Koji, Yuta, Kiwamu)
Entry  Mon Sep 27 21:57:59 2010, Zach, Update, elog, elog restarted 
 took two runs of the script as usual
Entry  Fri Sep 24 22:58:40 2010, josephb, Update, CDS, Modified front end medm screens 
To startup medm screens for the new suspension front end, do the following:
1) From a control room machine, log into megatron
ssh -X megatron
    Reply  Sun Sep 26 18:29:23 2010, rana, John, Update, CDS, Modified front end medm screens megamind-poster3.jpg
Issues  I notice on first glance: 
Entry  Fri Sep 24 23:47:10 2010, koji, tara, Update, Electronics, testing TTFSS 
  Q3, a PZT2222A transistor, on D0901846 is replaced by a GE-82. However, the board is still not fully function.
 
Since Q3, PZT2222A, was broken, I went to Wilson house and got some SP3904's for replacement. But somehow,
    Reply  Sat Sep 25 19:01:13 2010, Koji, Update, Electronics, testing TTFSS 
How much current do you need for each voltages?
GE-82 was the only PNP transister I could find in the lab. It's too old but we just like to confirm any other components are still functioning.
Similarly, we can confirm the functionality of the other components by skipping those current boost transisters, 
Entry  Fri Sep 24 16:31:35 2010, steve, Configuration, General, open frame- rack is moved P1060881.JPG
The squeezing open frame rack was moved from the south side of the PSL enclosure to the north side of the SP table.
AC power breaker is PC-2  #1
 
Entry  Fri Sep 24 00:56:35 2010, koji, tara, Update, Electronics, testing TTFSS 
We found that a transistor was broken from yesterday spark too. We partially fixed TTFSS, and it should be enough
for  testing purpose.
 
Entry  Thu Sep 23 23:24:43 2010, rana, johnny, tara, Summary, PSL, AM modulate AOM to measure RefCav Thermo-Optic coefficient 
Big Johnny and I hacked a function generator output into the cross-connect of the 80 MHz VCO driver so that we could modulate the
amplitude of the light going into the RefCav. The goal of this is to measure the coefficient between cavity power fluctuations and the
apparent length fluctuations. This is to see if the thermo-optic noise in coatings behaves like we expect.
Entry  Thu Sep 23 12:05:20 2010, josephb, alex, Update, CDS, fb40m down, new fb in progress 
Alex came over this morning and we began work on the frame builder change over.  This required fb40m be brought down and disconnected from the RAID
array, so the frame builder is not available.
He brought a Netgear switch which we've installed at the top of the 1X7 rack.  This will eventually be connected, via Cat 6 cable, to all
    Reply  Thu Sep 23 21:01:11 2010, josephb, alex, Update, CDS, fb40m still down, new fb still in progress 
Unfortunately, copying the data to the USB/SATA drive over at downs took longer than expected for Alex.  We will be installing the new code on the new fb
machine tomorrow and running it.

We will be running off of a timer on that machine until Monday.  On Monday, a Symmetricom card will be arriving from
LLO so that we can connect an IRIG-B timing signal into the frame builder and use a proper time signal.

There is no running frame builder for tonight
Entry  Thu Sep 23 02:45:30 2010, Koji, Summary, Computers, nodus gracefully rebooted 
Zach> Nodus seemed to be working fine again, and I was browsing the elog with no 
Zach> problem. I tried making an entry, but when I started uploading a file it 
Zach> became unresponsive. Tried SSHing, but I get no prompt after the welcome 
    Reply  Thu Sep 23 10:34:20 2010, rana, Frogs, Computers, nodus gracefully rebooted 
SVN down
mafalda down 
I am guessing that the NFS file system hangup may have caused some machines to get into an awkward state. We may be best off doing a controlled
       Reply  Thu Sep 23 11:15:20 2010, Koji, Frogs, Computers, nodus gracefully rebooted 
svn is back after starting apache on nodus.
http://lhocds.ligo-wa.caltech.edu:8000/40m/ApacheOnNodus


    
        
            
       Reply  Thu Sep 23 13:16:57 2010, Koji, Frogs, Computers, nodus gracefully rebooted 
mafalda is up now.
I found that the cable for mafalda (the sole red cable) had a broken latch.
The cable was about falling off from the switch. As a first-aid, I used this
Entry  Thu Sep 23 02:23:04 2010, koji,tara, Summary, Electronics, Testing new TTFSS  
I tested the new table top frequency stabilization system(TTFSS), 
I haven’t finished it yet, and accidentally fried one amplifier in the circuit.
We received three sets of a new TTFSS system
Entry  Mon Sep 6 10:08:10 2010, Alberto, Configuration, Computers, Netgear Network Switch fan broken. 
The Netgear Network Switch in the top shelf of Nodus' rack has a broken fan. It is the one interfaced to the Martian network.
The fan must have broken and it is has now started to produce a loud noise. It's like a truck was parked in the room with the engine running.
Also the other network switch, just below the Netgear, has one of its two fans broken. It is the one interfaced with the General Computer Side.
    Reply  Wed Sep 22 22:22:12 2010, Koji, Configuration, Computers, Netgear Network Switch fan broken. 
Net switch mumbo-jumbo:
Although Rana is going to buy a replacement for the Netgear Switch for martian, I opened the lid of the Netgear as the fan already have stopped
working.
Entry  Wed Sep 22 16:35:45 2010, josephb, Update, CDS, Fibers pulled, new FB install tomorrow 
[Aidan, Tara, Joe]
We pulled out what used to be the LSC/ASC fiber from the 1Y3 arm rack, and then redirected it to the 1X1 rack.  This will be used as the c1ioo
1PPS timing signal.  So c1ioo is using the old c1iovme fiber for RFM communications back to the bypass switch, and the old LSC fiber for 1PPS.
Entry  Tue Sep 21 16:05:21 2010, josephb, Update, CDS, First pass at rack diagram 1X1_1X2_racks.png
I've made a first pass at a rack diagram for the 1X1 and 1X2 racks, attached as png.
Gray is old existing boards, power supplies etc.  Blue is new CDS computers and IO chassis, and gold is for the Alberto's new RF electronics. 
I still need to double check on whether some of these boards will be coming out (perhaps the 2U FSS ref board?).
Entry  Tue Sep 21 15:33:02 2010, steve, Metaphysics, Treasure, Wagonga alart P1060866.JPGP1060872.JPG
John Miller has arrived from Australia with 3 bags of  Wagonga Coffee. Trade bargaining has started on
250 mgs of Sumatran Mandehling, Timur and Papua New Guine.
Entry  Mon Sep 20 17:10:10 2010, steve, Configuration, PSL, enclosure beam guides to IFO are installed  
The PSL out  2" OD beam guide tube was cut  1.5" shorter to 13.5"
The 10" OD  0.25" wall Al tube was replaced by a  lighter, not anodized and thinner  wall 0.094" tube of 15.5"
lenght, that is 0.75" shorter.
Entry  Mon Sep 20 16:59:26 2010, josephb, Update, CDS, Megatron in 1X2 rack, to be come c1ioo 
[Rana, Koji, Joe]
We pulled the phase shifters in the 1X2 rack out to make room for megatron.  Megatron will be converted into c1ioo, and the 8 core, 1U computer
will be used as c1lsc.  A temporary ethernet cable was run from 1X2 to 1X3 to connect megatron to the same sub-network.
Entry  Mon Sep 20 11:39:45 2010, josephb, Update, CDS, Switch over 
I talked to with Alex this morning, discussing what he needed to do to have a frame builder running that was compatible with the new front ends.
 
1) We need a heavy duty router as a separate network dedicated to data acquisition running between the front ends and the frame builder. 
Entry  Mon Sep 20 10:33:21 2010, josephb, Bureaucracy, Computers, Larry stopped by - GC machine had conflicting IP 
Larry stopped by today and had to disconnect the m25 machine (this is the 1st GC machine on the left as you walk into the control room) because its IP
was conflicting with a machine over in Downs.  Do not use 131.215.115.125 as the IP on this machine as this is already assigned to someone else. 
They couldn't figure out the root password to change it which is why it is not currently plugged into the network, and is not to be until an appropriate
Entry  Sun Sep 19 18:52:52 2010, rana, Configuration, PSL, NPRO SLOW servo settings updated for Innolight NPRO Untitled.png
Our new 2W Mephisto has a pretty zippy "SLOW" temperature input. Tuning the perl PID servo, I found that the best response came from setting
the "P" and "D" terms to zero. This is because the internal temperature stabilization servo has a fairly high UGF. In the attached
image you can see how the open loop step response looks (loop is open then the "KI" parameter is set to zero). The internal servo