Entry  Fri Aug 27 22:09:37 2010, Jenne, Update, PSL, The beginnings of the new PSL phoenix.jpg
    Reply  Sat Aug 28 01:02:31 2010, rana, Update, PSL, The beginnings of the new PSL 
Entry  Fri Aug 27 13:41:02 2010, kiwamu, Update, SUS, fix watchdogs  
Entry  Fri Aug 27 11:27:33 2010, steve, Update, PEM, crane safety document 
Entry  Fri Aug 27 11:24:13 2010, Jenne, Omnistructure, Computers, op540m dead 
Entry  Fri Aug 27 07:21:13 2010, Alastair, Update, General, elog... 
Entry  Wed Aug 25 16:13:32 2010, steve, Summary, PEM, PSL optical table is back into operation at 32.75" level P1060764.JPGP1060768.JPGP1060777.JPGP1060776.JPGP1060780.JPG
Entry  Wed Aug 25 15:55:33 2010, josephb, Update, elog, Staying with 2.7.5 until passwords sorted out 
Entry  Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png
    Reply  Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png
       Reply  Wed Aug 25 15:42:01 2010, Jenne, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
Entry  Wed Aug 25 12:40:28 2010, josephb, Update, elog, Reverted back to 2.7.5 until further testing is done 
Entry  Tue Aug 24 17:57:57 2010, Zach, Update, elog, restarted 
    Reply  Tue Aug 24 22:26:16 2010, Zach, Update, elog, restarted 
Entry  Tue Aug 24 14:29:18 2010, josephb, Update, elog, Elog down for 1 minute 
Entry  Tue Aug 24 11:23:32 2010, steve, Update, PEM, tripod leg installation completed 7x
Entry  Tue Aug 24 06:34:01 2010, Alastair, Update, General, Elog... 
Entry  Mon Aug 23 21:04:14 2010, Jenne, Update, Treasure, Seriously? BadKiwamu_CDSsetup.jpg
    Reply  Mon Aug 23 22:11:52 2010, kiwamu, Update, Treasure, Re:Seriously? 
Entry  Mon Aug 23 15:24:24 2010, kiwamu, Configuration, SUS, watchdogs off 
    Reply  Mon Aug 23 18:18:22 2010, kiwamu, Configuration, SUS, Re:watchdogs off 
       Reply  Mon Aug 23 19:55:31 2010, kiwamu, Update, CDS, some progress 
Entry  Mon Aug 23 08:28:27 2010, steve, Update, SUS, ETMY sus damping restored 
Entry  Mon Aug 23 00:08:24 2010, Jenne, Update, elog, Joe, I think this's your cue... 
Entry  Sun Aug 22 16:20:24 2010, Zach, Update, elog, restarted (with my phone this time) 
Entry  Fri Aug 20 20:36:05 2010, Alastair, Update, General, Elog 
Entry  Fri Aug 20 17:46:30 2010, rana, Update, PSL, 40m PSL Upgrade Layout v0.3 
Entry  Fri Aug 20 16:41:43 2010, Alberto, Update, Electronics, Frequency Generation Box Assembly Completed 7x
Entry  Fri Aug 20 16:17:35 2010, steve, Update, PEM, PEM-count channels are not working 
Entry  Fri Aug 20 15:49:14 2010, steve, Update, PEM, grouting is done P1060699.JPGP1060700.JPGP1060704.JPG
Entry  Fri Aug 20 15:22:09 2010, Jenne, Update, SUS, TTs done!!! 
Entry  Fri Aug 20 13:09:53 2010, josephb, Update, elog, Rebooted elog 
Entry  Thu Aug 19 21:56:02 2010, Zach, Update, elog, restarted 
Entry  Thu Aug 19 16:03:59 2010, steve, Update, PEM, grouting of PSL tripod legs P1060687.JPGP1060681.JPGP1060686.JPGP1060696.JPG
Entry  Thu Aug 19 11:38:48 2010, Alastair, Update, Computers, ATF wiki 
    Reply  Thu Aug 19 12:06:07 2010, Alastair, Update, Computers, ATF wiki 
Entry  Thu Aug 19 09:52:51 2010, Alastair, Update, Computers, Elog down 
Entry  Wed Aug 18 19:14:59 2010, Jenne, Update, elog, elog dead again 
    Reply  Thu Aug 19 01:49:14 2010, Jenne, Update, elog, elog dead again 
       Reply  Thu Aug 19 09:51:43 2010, josephb, Update, elog, elog dead again 
Entry  Wed Aug 18 20:54:23 2010, rana, yoichi, Configuration, Environment, Chiller's chiller turned off 
Entry  Wed Aug 18 19:19:38 2010, Jenne, Update, SUS, Final 2 TTs suspended! 
Entry  Tue Aug 17 14:09:15 2010, steve, Update, PEM, PSL optical table schedule  
    Reply  Wed Aug 18 16:42:14 2010, steve, Update, PEM, PSL optical table legs load balanced P1060671.JPGP1060674.JPGP1060670.JPGP1060676.JPG
Entry  Wed Aug 18 12:24:58 2010, josephb,kiwamu, Update, CDS, shmem issue 
Entry  Wed Aug 18 12:02:29 2010, Alastair, Configuration, Computers, elog had crashed again... 
Entry  Wed Aug 18 11:40:59 2010, josephb,kiwamu,yoichi, Update, CDS, End station working with latest RCG code 
Entry  Tue Aug 17 23:59:46 2010, Katharine, Update, elog, Maglev update repulsiveforce.pngOSEMcalibration.pngOSEMslopes.png
Entry  Tue Aug 17 09:06:08 2010, Alberto, Update, elog, elog was down 
Entry  Thu Aug 12 11:19:04 2010, kiwamu, Update, CDS, current status 
    Reply  Thu Aug 12 14:01:53 2010, josephb, Update, CDS, current status 
       Reply  Thu Aug 12 18:30:08 2010, kiwamu, Update, CDS, Re: current status 
    Reply  Tue Aug 17 02:07:11 2010, Yoichi, Update, CDS, DACs have correct number of channels 
Entry  Mon Aug 16 19:12:18 2010, Jenne, Update, SUS, More TT characterization 
    Reply  Mon Aug 16 23:39:29 2010, Yoichi, Update, SUS, More TT characterization EQStopScrewHoles.jpg
Entry  Mon Aug 16 23:13:25 2010, Zach, Update, elog, e to the log 
Entry  Fri Aug 13 15:29:35 2010, Aidan, Frogs, Photos, Here's the 40m team 40m_team.JPG
    Reply  Mon Aug 16 13:33:06 2010, Zach, Frogs, Photos, Here's the 40m team 
Entry  Fri Aug 13 20:58:20 2010, Jenna, Summary, Electronics, Rubidium clock phase noise measurement 6x
Entry  Fri Aug 13 18:32:48 2010, steve, Update, PEM, new legs attached to optical table P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG
Entry  Thu Aug 12 23:17:54 2010, Zach, Update, elog, restarted 
    Reply  Thu Aug 12 23:41:48 2010, Jenne, Update, elog, restarted 
       Reply  Fri Aug 13 13:11:30 2010, Dmass, Update, elog, restarted 
Entry  Fri Aug 13 09:41:00 2010, nancy, Omnistructure, Computers, Charger for dell laptop 
Entry  Fri Aug 13 01:53:12 2010, Gopal, Update, Optic Stacks, Gravity Implementation Confirmed Pendulum_Length.pngPendulum_Length.pngPendulum_Length.png
Entry  Thu Aug 12 23:49:04 2010, nancy, Update, Environment, Laser chiller temp raised 
Entry  Wed Aug 4 16:52:59 2010, Razib, Aidan, Update, Phase Camera, Sideband power measurement (updated) Setup_08_04_2010.jpgpower_40MHz.pngpower_25MHz.png
    Reply  Thu Aug 12 16:52:02 2010, Razib, Update, Phase Camera, Sideband power measurement (updated) SCR.jpgDC_sig_sideband_profile.jpgsideband_profile.jpgsine_trig.jpgsine_trig.jpg
       Reply  Thu Aug 12 17:10:07 2010, Koji, Update, Phase Camera, Sideband power measurement (updated) 
          Reply  Thu Aug 12 17:28:28 2010, Razib, Update, Phase Camera, Sideband power measurement (updated) 
Entry  Thu Aug 12 10:56:31 2010, steve, Update, Environment, dusty floor work in progres 
    Reply  Thu Aug 12 16:18:46 2010, steve, Update, Environment, tiles and adhesive removed P1060604.JPGP1060606.JPGP1060603.JPGP1060610.JPGDSC_2388.JPG