40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 118 of 170  Not logged in ELOG logo
Entry  Thu Oct 14 10:29:33 2010, josephb, Update, Computers, Mafalda ready for NDS2, updated Rosalba, Rossa repos 
Entry  Thu Oct 14 01:09:17 2010, yuta, Update, IOO, tried to lock MC but failed 
Entry  Thu Oct 14 00:04:46 2010, yuta, Update, SUS, Q-value adjustment for MC dampings MC2ringdown.png
Entry  Wed Oct 13 21:08:40 2010, kiwamu, Update, PSL, NPRO is still alive 
Entry  Wed Oct 13 17:12:33 2010, josephb, yuta, Update, CDS, Filter name length problem found and fixed 
Entry  Wed Oct 13 17:04:34 2010, josephb, yuta, Update, CDS, burt restore now working with filter settings 
Entry  Tue Oct 12 22:06:08 2010, yuta, Update, Computers, celan-installed CentOS 5.5 on mafalda 
    Reply  Tue Oct 12 23:35:12 2010, mafalda, Update, Computers, celan-installed CentOS 5.5 on mafalda 
       Reply  Wed Oct 13 11:09:28 2010, yuta, Update, Computers, clean-installed CentOS 5.5 on mafalda 
Entry  Wed Aug 25 12:18:47 2010, josephb, Update, elog, Trying new version of elog to see if it helps stability 
    Reply  Wed Oct 13 09:35:41 2010, rana, Update, elog, start script edited 
Entry  Tue Oct 12 23:45:55 2010, rana, Configuration, DAQ, NDS2 cerberus.jpg
Entry  Tue Oct 12 17:42:57 2010, yuta, Update, SUS, very first measurement of Q-values for MC1 MC1ringdown.png
Entry  Tue Oct 12 16:35:17 2010, steve, Configuration, PSL, PSL output monitor in place 
Entry  Tue Oct 12 15:51:18 2010, yuta, Bureaucracy, SAFETY, the 40m squad received safety training from Peter 
Entry  Tue Oct 12 13:05:00 2010, josephb, alex, Update, CDS, fb still flaky, models time out fixed 
Entry  Tue Oct 12 01:54:32 2010, kiwamu, Update, Green Locking, mode matching to doubling crystal on PSL table PSL_doubling.png
Entry  Mon Oct 11 23:55:25 2010, Joonho Lee, Summary, Electronics, CCD cables for output signal 
Entry  Mon Oct 11 22:45:16 2010, kiwamu, Update, Computers, solid works 2010 installed solidworks.PNG
Entry  Mon Oct 11 22:04:28 2010, yuta, Update, CDS, damping for MCs are basically working SUS-MC1.pngSUS-MC2.pngSUS-MC3.png
Entry  Mon Oct 11 17:31:44 2010, yuta, Update, CDS, Activation of DAQ channels for 8 optics 
    Reply  Mon Oct 11 20:52:00 2010, rana, Update, CDS, Activation of DAQ channels for 8 optics 
Entry  Mon Oct 11 16:09:10 2010, yuta, Summary, SUS, current OSEM outputs 
Entry  Sun Oct 10 18:28:25 2010, kiwamu, Summary, SUS, ITMX OSEM offsets OSEM.png
    Reply  Mon Oct 11 10:51:36 2010, steve, Update, SUS, OSEMs, OSEMs, OSEMs...those lovely little OSEMs 40dll.jpg
Entry  Mon Oct 11 10:49:03 2010, josephb, Update, CDS, c1sus stability 
Entry  Sun Oct 10 18:09:02 2010, Koji, Summary, COC, Phase map interferometer calibration for the data on Oct 8th, 2010  calibration.pdf
Entry  Sun Oct 10 16:59:20 2010, Koji, Omnistructure, COC, PRM phase map measurement at Downs SB 014 IMG_3646.jpgIMG_3647.jpg
Entry  Sun Oct 10 16:44:59 2010, Koji, Omnistructure, Photos, Kepco Tube HV supply IMG_3637.jpgIMG_3640.jpg
Entry  Fri Oct 8 17:36:16 2010, steve, Frogs, Photos, visiting undergrads P1060916.JPGP1060921.JPGP1060922.JPGP1060915.JPG
Entry  Fri Oct 8 17:35:24 2010, josephb, Update, CDS, status of c1ioo, c1sus and rfm 
Entry  Fri Oct 8 15:57:32 2010, josephb, Update, CDS, c1ioo status 
Entry  Thu Oct 7 23:24:44 2010, yuta, Update, CDS, checking MC1 suspension damping 
    Reply  Fri Oct 8 12:21:11 2010, josephb, Update, CDS, checking MC1 suspension damping  
Entry  Fri Oct 8 07:41:42 2010, steve, Configuration, SAFETY, 2W laser shutter is closed 
    Reply  Fri Oct 8 10:38:03 2010, steve, Configuration, SAFETY, 2W laser shutter is closed P1060905.JPGP1060910.JPG
Entry  Thu Oct 7 17:53:07 2010, yuta, Update, Computers, Farfalla with Firefox, fixed 
Entry  Thu Oct 7 17:19:55 2010, josephb, alex, rolf, Update, CDS, c1sus status 
Entry  Thu Oct 7 16:21:02 2010, Koji, Omnistructure, CDS, Big 3 IMG_3642.jpg
Entry  Thu Oct 7 15:21:51 2010, steve, Update, PSL, RF filter for PMC 35.5MHZ.pdf
Entry  Thu Oct 7 14:57:52 2010, josephb, yuta, Update, CDS, c1sus status 
Entry  Wed Oct 6 16:16:48 2010, josephb, yuta, Update, CDS, c1sus status 
    Reply  Thu Oct 7 10:48:41 2010, josephb, yuta, Update, CDS, c1sus status 
Entry  Thu Oct 7 10:37:42 2010, josephb, Update, CDS, c1sus with flaky ssh 
Entry  Thu Oct 7 08:39:39 2010, steve, Bureaucracy, SAFETY, Joonho receives safety training 
Entry  Wed Oct 6 22:46:36 2010, kiwamu, Update, Green Locking, SHG at PSL table 
Entry  Wed Oct 6 15:56:14 2010, josephb, HowTo, CDS, How to load matrices quickly and easily 
Entry  Wed Oct 6 14:49:54 2010, rana, Summary, lore, Steve on the sea jacques.jpg
Entry  Wed Oct 6 12:00:23 2010, josephb, yuta, kiwamu, Update, CDS, Found and fixed filter sampling rate problem with suspensions 
Entry  Wed Oct 6 11:03:51 2010, josephb, yuta, HowTo, CDS, How to start diaggui for right now 
Entry  Wed Oct 6 00:32:01 2010, rana, Summary, DAQ, NDS2 
Entry  Tue Oct 5 21:22:46 2010, yuta, Update, VAC, green beam reached PSL table IMG_3627.jpg
Entry  Tue Oct 5 18:27:18 2010, Joonho Lee, Summary, Electronics, CCD cable's impedence 
Entry  Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed 
Entry  Tue Oct 5 16:58:41 2010, josephb, yuta, Update, CDS, c1sus front end status 
Entry  Tue Oct 5 16:30:00 2010, josephb, yuta, HowTo, CDS, Screen settings and medm screens for new system 
Entry  Tue Oct 5 14:11:09 2010, josephb, alex, Update, CDS, Going to from rtlinux to Gentoo requires front end code clean out 
Entry  Tue Oct 5 13:59:17 2010, Leo Singer, Configuration, Computers, Installed x264-devel on Allegra 
ELOG V3.1.3-