  3318   Thu Jul 29 12:31:09 2010 KojiSummaryGeneralLab ScheduleJuly 
29 Thu BS chamber work: Move cable
towers / green steering mirrors / (2 TTs
 PSL_work_schedule.pdf 
  2496   Sun Jan 10 16:05:51 2010 AlbertoOmnistructureEnvironmentLab Thermostats Temperature Lowered by 1 deg FRana noticed that recently the temperature
inside the lab has been a little bit too
high. That might be causing some 'unease'
  
  2501   Mon Jan 11 10:01:06 2010 AlbertoOmnistructureEnvironmentLab Thermostats Temperature Lowered by 1 deg F

    
        
  
  15657   Tue Nov 3 09:06:50 2020 gautamUpdateGeneralLab alarm trippedI got a call from Calum ~830am today saying
some facilities people entered the lab, opened
the south entrance door, and tripped the
  
  16240   Tue Jul 6 17:40:32 2021 KojiSummaryGeneralLab cleaningWe held the lab cleaning for the
first time since the campus reopening (Attachment
1).
 7x 
  17132   Tue Sep 6 09:57:26 2022 JCSummaryGeneralLab cleaningDB9 Cables have been assorted and placed
behind the Y-Arm. Long BNC Cables and Ethernet
Cables have been stored under the Y-Arm. 
 982146B2-02E5-4C19-B137-E7CC598C262F.jpeg0FBB61AC-E882-458D-A891-7B11F35588FF.jpeg 
  17072   Wed Aug 10 19:36:45 2022 KojiBureaucracyGeneralLab cleaning and discoveryDuring the cleaning today, we found many
legacy lab items. Here are some policies
what should be kept / what should be disposed
 steel_plate.jpglogbook1.jpglogbook2.jpgpaper_plots.jpg 
  997   Fri Sep 26 14:10:21 2008 YoichiConfigurationComputersLab laptops maintenanceThe linux laptops were unable to write to
the NFS mounted directories. 
That was because the UID of the controls
  
  16025   Wed Apr 14 12:27:10 2021 gautamUpdateGeneralLab left open againOnce again, I found
the door to the outside in the control room
  
  14027   Wed Jun 27 21:18:00 2018 gautamUpdateCDSLab maintenance scripts from NODUS---->MEGATRONI moved the N2 check script and the disk
usage checking script from the (sudo) crontab
of 
  
  3348   Mon Aug 2 17:12:28 2010 KojiUpdateGeneralLab schedule for the week of Aug. 2Aug
2 Mon - 5 Thu WFS work (Nancy)
 PSL_work_schedule.pdf 
  14545   Mon Apr 15 22:55:34 2019 gautamFrogsThermal CompensationLab thermostat adjustedIt is feeling cold in the office area.
According to the digital wall clock near
the coffee machine, it is 19C. Rana bumped
  
  15603   Tue Sep 29 17:07:25 2020 gautamUpdateGeneralLab visit for inventory locationI was in the lab from 1630-1830. I have located
and visually inspected all the parts required
for the magnet regluing / optic cleaning
  
  1231   Fri Jan 16 11:28:54 2009 YoichiUpdateComputersLab. laptop needs wireless lan driver updateOne of the lab. laptops (belladonna) cannot
connect to the network now.
I guess this was caused by someone clicked
  
  14533   Thu Apr 11 01:10:05 2019 gautamUpdateALSLarge 2kHz peak (and harmonics) in ALS XThese weren't present last week. The
peaks are present in the EX PDH error monitor
signal, and so are presumably connected with
 EX_PDH_2kNoise.pdf 
  14548   Wed Apr 17 00:50:17 2019 gautamUpdateALSLarge 2kHz peak (and harmonics) in ALS X no moreI looked into this issue today. Initially,
my thinking was that I'd somehow caused
clipping in the beampath somewhere which
 EX_PDHnoise.pdf 
  14549   Wed Apr 17 11:01:49 2019 gautamUpdateALSLarge 2kHz peak (and harmonics) in ALS X no moreEX green stayed locked to XARM length overnight
without a problem. The spectrogram doesn't
show any alarming time varying features around
 EX_PDH_specGram.pdf 
  4338   Tue Feb 22 14:37:24 2011 steveUpdateSAFETYLarisa received 40m safety trainingLarisa Thorne received 40m lab specific,
basic safety training. She will attend P.
King's  Basic Laser Safety Training Session
  
  3588   Mon Sep 20 10:33:21 2010 josephbBureaucracyComputersLarry stopped by - GC machine had conflicting IPLarry stopped by today and had to disconnect
the m25 machine (this is the 1st GC machine
on the left as you walk into the control
  
  6500   Fri Apr 6 19:40:57 2012 Mike J.SummaryGeneralLaser Emergency ShutoffI accidently shut off the laser at 19:34
with the emergency shutoff button while trying
to tap into a video line for the Sensoray
  
  6501   Fri Apr 6 20:05:12 2012 JamieSummaryGeneralLaser Emergency ShutoffWe reset the interlock and restarted the
PSL.  The end AUX lasers seem to have
come back online fine.  PMC and mode
  
  1465   Thu Apr 9 23:11:27 2009 robSummaryLockingLaser PM to PO-DC transfer functions at multiple CARM offsetsI've plotted some transfer functions showing
the response at POB DC to laser frequency
(phase) noise.  There are transfer functions
 CARMoffs1.pngCARMoffs2.pngCARMcarpet.png 
  1466   Thu Apr 9 23:20:35 2009 robSummaryLockingLaser PM to REFL-DC transfer functions at multiple CARM offsets


   
        
            
 CARMoffs1_r.pngCARMoffs2_r.pngCARMcarpet_r.png 
  1468   Fri Apr 10 03:10:08 2009 ranaSummaryLockingLaser PM to REFL-DC transfer functions at multiple CARM offsetsI hereby award the previous rainbow transfer
functions the plot innovation of the month
award for its use of optical frequency to
  
  1636   Mon Jun 1 13:56:52 2009 AlbertoUpdatePSLLaser Power after fixing the laser chillerThe laser power seems to have become more
stable after fixing the laser chiller. The
power is lower than it used to be (MOPA amplitude
 MOPAtrend.jpg 
  1639   Mon Jun 1 15:01:31 2009 ranaUpdatePSLLaser Power after fixing the laser chiller: more tracesIf you look at the correlation between RMTEMP
and HTEMP, you see what we knew: namely that
there
 Picture_7.png 
  552   Mon Jun 23 15:22:04 2008 ranaBureaucracySAFETYLaser Safety Walkthrough today   Walkthrough08.jpg 
  16024   Tue Apr 13 20:45:16 2021 YehonathanUpdatePSLLaser amplifier{Yehonathan, Rana}

We unpacked the content of the
amplifier crate in front of the water fountain
 20210413_204721.jpg20210413_203300.jpg20210413_204940.jpg20210413_205549.jpg 
  16032   Wed Apr 14 19:48:18 2021 gautamUpdatePSLLaser amplifierA couple of years ago, I got some info
about the amplifier setup at the sites from
Terra - sharing here in case there is some
  
  16034   Thu Apr 15 09:46:24 2021 YehonathanUpdatePSLLaser amplifierSome more relevant documents provided by
Matt:

Phase
  
  16044   Fri Apr 16 18:21:36 2021 YehonathanUpdatePSLLaser amplifierI surveyed a bit the 1X1/2 area to plan
for the installation of the laser amplifier.

There is a vacancy at the bottom
 20210416_143642.jpg20210416_145408.jpg20210416_145448.jpg20210416_181324.jpg 
  16046   Sun Apr 18 21:29:55 2021 ranaUpdatePSLLaser amplifier
Ideally, we put the chiller outside
of the interferometer area. The PSL chiller
used to be in the control room near the door
  
  16062   Wed Apr 21 11:09:57 2021 yehonathanUpdatePSLLaser amplifierI went to the TCS lab to take a look at
the chillers lying around. I spotted two
chillers:
 20210420_171606.jpg20210420_171621.jpg20210420_171611.jpg20210420_171629.jpg20210420_171702.jpg 
  16080   Thu Apr 22 17:28:34 2021 YehonathanUpdatePSLLaser amplifierAccording to the aLIGO
70W amplifier interlock concept the flow
rate of the chiller should be between 5 and
 20210422_124940.jpgDrillRoomSchematics.pdf20210422_125240_1.png 
  1003   Mon Sep 29 01:19:40 2008 ranaSummaryPSLLaser chiller running a little hotI looked at it some last night and my suspicion
was the ISS. Whenever the ISS switch came
on the FAST got a kick.
  
  1005   Mon Sep 29 13:23:40 2008 robSummaryPSLLaser chiller running a little hot[quote]I looked at it some last night and
my suspicion was the ISS. Whenever the ISS
switch came on the FAST got a kick.
  
  3417   Thu Aug 12 23:49:04 2010 nancyUpdateEnvironmentLaser chiller temp raisedSince the laser is off, Jenne and I rasied
the chiller-chiller (small AC in the Control
Room) set point temperature to 
  
  1568   Sat May 9 00:15:21 2009 YoichiUpdatePSLLaser head temperature oscillationAfter the laser cooling pipe was unclogged,
the laser head temperature has been oscillating
in 24h period.
 laser.png 
  1569   Sat May 9 02:20:11 2009 JenneUpdatePSLLaser head temperature oscillation[quote]After the laser cooling pipe was unclogged,
the laser head temperature has been oscillating
in 24h period.
  
  1570   Sat May 9 15:19:10 2009 ranaUpdatePSLLaser head temperature oscillationThis is 8 days of 10-minute trend.

DTEC is just the feedback control signal
 Picture_2.png 
  13414   Wed Nov 8 00:28:16 2017 gautamUpdateLSCLaser intensity coupling measurement attemptI tried measuring the coupling of PSL intensity
noise by driving some broadband noise bandpassed
between 80-300Hz using the spare DAC channel
 PSL_RIN.pdf 
  13353   Tue Oct 3 01:32:39 2017 gautamUpdateLSCLaser intensity noise coupling to MICH (simulated)GV Oct 6: This
coupling is probably not correct - Finesse
 MICH_intensityNoiseCoupling.pdfMICH_intensityNoiseASD.pdf 
  14978   Fri Oct 18 18:13:55 2019 KojiUpdatesafetyLaser interlock looks OKI've checked the state of the laser
interlock switch and everything looked normal.
  
  1256   Wed Jan 28 19:08:50 2009 YoichiUpdatePSLLaser is back (sort of)Yoichi, Peter, Jenne

Summary:
 Improving.png 
  1257   Thu Jan 29 13:52:34 2009 YoichiUpdatePSLLaser is back (sort of)Here is what I think has happened to the laser.

After the chiller line to the NPRO base clogged,
 SlowDC.pdf 
  12035   Tue Mar 15 10:31:58 2016 SteveUpdateIOOLaser is turned back onIt's may be the janitor's doing.

I noticed that the HEPA filers
were off. They are turned on at 20%
 2WlaserOff-On.png 
  12041   Tue Mar 22 14:12:18 2016 SteveUpdateIOOLaser is turned back onThe 2W Innolight was turned on.

 
 off-onAgain.png 
  9255   Mon Oct 21 09:46:12 2013 SteveUpdatePSLLaser just turned onI have just turned on the PSL Innolight
laser. The laser shut down  with unknown
reason a day ago.
 laserTurnedON.png 
  10102   Wed Jun 25 17:13:10 2014 NichinUpdateElectronicsLaser power check - PDFR system[Nichin, Manasa]
I wanted to make sure Alex's system
of Diode laser + laser controller + optical
  
  1034   Wed Oct 8 19:17:55 2008 YoichiConfigurationPSLLaser power is slowly recoveringThis afternoon we (rich, steve, yoichi) shutdown
the laser for the DC-DC converter installation.
  