40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 118 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  1087   Fri Oct 24 18:05:01 2008 AlbertoUpdateGeneralAbs length: transverse mode spacing measured for the X armThe ETMX suffers of astigmatism. I measured
the following frequencies for the higher
order modes:
 24OCT08_TEM10-01_comparison(file12-14).png 
  1108   Mon Nov 3 19:12:27 2008 albertoUpdateGeneralTransverse mode spacing measurement for the X armI know a lot of expectations have been building
up on these days in the scientific community
at the 40m towards a conclusive elog entry
 2008-11-02_summarizingplot.png 
  1109   Mon Nov 3 19:18:47 2008 AlbertoConfigurationGeneralnew elogPhil Ehrens kindly poured our elog's content
in a CD that now is here at the 40m.
I've been trying to install the 2.7.5 version
  
  1110   Mon Nov 3 21:38:32 2008 YoichiConfigurationGeneralnew elog[quote]I tried to recompile the elog from
the source code but the way gcc is called
must be wrong because I get this error message:
  
  1133   Thu Nov 13 15:50:44 2008 AlbertoConfigurationGeneralGPS 10MHz clockThe schematic of the 1Y7 rack that Alan pointed
out (see attachment) don't represent anymore
the actual rack.
 rackstuff.pdf 
  1142   Mon Nov 17 20:47:19 2008 CarynSummaryGeneralDrove MC at 28kHz to excite drum modesRana, Alberto and I observed drum mode frequencies
at 23.221kHz(MC1), 28.039kHz(MC2), 28.222kHz(MC3)
while driving the mode cleaner. We observed
  
  1145   Tue Nov 18 19:44:53 2008 AlbertoUpdateGeneralX Arm Cavity "Negative" FSRs MeasuredPrevious measurements on the X arm cavity
revealed a shift of the frequencies of the
cavity resonances from where one would expect
 2008-11-17_Linear_Fit.pdf 
  1150   Fri Nov 21 16:03:50 2008 ranaHowToGeneralRecharging BatteriesI found some black & red "Ninja" alkaline
AA batteries in the battery charger. [COLOR=red]This
is dangerous.[/COLOR] Please
  
  1183   Sun Dec 7 16:02:46 2008 ranaUpdateGeneralMag 5.1 EQ halfway to VegasThere was a [URL=http://earthquake.usgs.gov/eqcenter/recenteqsww/Quakes/ci14408052.php#details]Mag
5.1 EQ[/URL] Friday night at 8:18 PM.
 g.pngUntitled.png 
  1185   Mon Dec 8 00:10:42 2008 carynSummaryGeneralcalibrating the jenne laserI apologize in advance for the long list of
numbers in the attachment. I can't seem to
make them hide for some reason. 
 IvsDCmax.pngdata.tar.gzjcal_dip_2_norm_log.pngjcal_flat_3_norm_log.png 
  1187   Mon Dec 8 11:54:27 2008 YoichiUpdateGeneralIFO mirrors alignedThis morning, I re-aligned the IFO mirrors
to see if they were badly moved by the earthquake.
The both arms locked just by the restoring
  
  1189   Tue Dec 9 10:48:17 2008 CarynSummaryGeneralcalibrating the jenne laser: impedance mismatch?
We sent RFout of network analyzer to a splitter,
with one side going back to the network analyzer
 reflection.png 
  1194   Fri Dec 19 11:18:52 2008 AlbertoConfigurationGeneralMode Cleaner Temperature MonitorI reduced from 10 to 5 the gain of the SR560
that Caryn has set up after the lock-in amplifier
nest to the PSL rack because the overload
  
  1198   Sat Dec 20 23:37:43 2008 robOmnistructureGeneralSaturday Night Fever after presumed power failure
Just came by to pick something up...
  
  1218   Thu Jan 8 20:26:17 2009 robOmnistructureGeneralEarthquake in San BernardinoMagnitude 4.5
Date-Time
  
  1222   Mon Jan 12 10:57:38 2009 robUpdateGeneralsome stuff
The AS beam was not hitting the AS166 diode,
so I aligned the last little steering mirror
  
  1263   Mon Feb 2 12:35:22 2009 AlbertoConfigurationGeneralNew Elog 2.7.5 in Service on NodusI moved the 40m, the Adhikari Lab and the
SUS elogs from Dziban (located in Millikan's
6th floor) to our gateway server Nodus. In
  
  1264   Mon Feb 2 17:25:44 2009 AlbertoConfigurationGeneralSome little problem with the new elogFor some reason the new elog does not look
exactly like it should. 

1) Some of the
editing features are not available.

2)
  
  1265   Mon Feb 2 18:32:54 2009 AlbertoConfigurationGeneralSome little problem with the new elog


   
        
            
  
  1266   Mon Feb 2 18:51:02 2009 AlbertoConfigurationGeneralNew Elog 2.7.5 in Service on Nodus


   
        
            
  
  1267   Mon Feb 2 19:23:53 2009 YoichiUpdateGeneralNew optical layout planThe attached is a plan of the optical layout
in the central part for the upgrade.
I included, the folded recycling cavities,
 40mUpgradeOpticalLayoutPlan01.pdf.zip 
  1269   Tue Feb 3 19:24:14 2009 YoichiUpdateGeneralNew optics layout wiki pageI uploaded a slightly updated version of the
new optics layout on the 40m wiki.
http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_08/Optical_Layout
  
  1271   Wed Feb 4 17:45:39 2009 YoichiUpdateGeneralMode matching of the upgraded IFOI did mode matching calculations for the new
optical layout.
For the input mode matching, we have to change
  
  1272   Wed Feb 4 19:22:57 2009 YoichiUpdateGeneralDo we need off-axis parabolic mirrors ?I also estimated the mode matching degradation
caused by the astigmatism.
Since the incident angles to the mode matching
  
  1274   Thu Feb 5 10:42:33 2009 YoichiUpdateGeneralDo we need off-axis parabolic mirrors ? No way !I made a mistake in estimating the astigmatism
problem.
If we use the current MMT1 as it is, this
  
  1290   Wed Feb 11 00:50:24 2009 carynUpdateGeneralants?So, near 2 of the trashcans in the control
room and underneath a desk there are hundrends
of ants. Is this normal?
  
  1293   Wed Feb 11 11:39:17 2009 steveConfigurationGeneralvac envelope groundThe vacuum envelope was grounded from
the IOO chamber to master ground north (under
electric breaker panel L)
with
  
  1297   Thu Feb 12 14:39:07 2009 ranaSummaryGeneralSilicon Beam Dump testYesterday evening, Ken Mailand and I tested
the reflectivity of a piece of polished Silicon.
Since Silicon has such a high thermalconductivity
  
  1302   Fri Feb 13 16:30:49 2009 steveConfigurationGeneralstatus quo is disturbed I have been getting ready for the annual
safety inspection in the past 2-3 days.
Meaning cleaning up and disturbing
  
  1331   Sun Feb 22 23:43:07 2009 carynSummaryGeneraltemperature sensorComparing  PSL-FSS-RMTEMP and PEM-MC1-TEMPS
So, to compare temp channels, I made
a plot of PSL-FSS_RMTEMP and PEM-MC1_TEMPS(the
 12x 
  1340   Thu Feb 26 19:20:08 2009 YoichiConfigurationGeneralETMX camera centered. POX, POY PDs centeredAlberto, Yoichi

We centered the ETMX camera.
  
  1414   Fri Mar 20 15:54:29 2009 steveOmnistructureGeneral480V crane power switch on MEZCES Mezzanine is beeing rebuilt to accommodate
our new neighbor: the 20ft high water slide...&
.jacuzzi
  
  1446   Mon Mar 30 17:02:46 2009 YoichiConfigurationGeneralAP OSA alignedI aligned the AP OSA, which had been mis-aligned
for a while.
  
  1461   Wed Apr 8 18:46:50 2009 ranaConfigurationGeneralDMF, SVN, x2mc, and matlabWhile waiting for the installation of the
32-bit Matlab 2009a to finish, I tried updating
our seisBLRMS.m code.
  
  1464   Thu Apr 9 20:56:12 2009 YoichiHowToGeneralRestore the alignment. Write elog entries.I often find that the mirrors are left mis-aligned
(like in X-arm mode) when I come in for the
locking, including tonight.
  
  1472   Fri Apr 10 19:10:53 2009 JenneUpdateGeneralXarm locked?I don't know who left the X arm locked,
but I just ran the Align Full IFO script,
so everything is good in case Yoichi/someone
  
  1504   Mon Apr 20 20:45:25 2009 ranaConfigurationGeneralSVN: project area addedI added the [B]/cvs/cds/project/[/B] directory
to the SVN. I've noticed that we've been
using target/ for code which is not
  
  1538   Fri May 1 18:24:36 2009 AlbertoSummaryGeneraljitter of REFL beam ?Some loud thinking.
 
For
the measurement of the length of the PRC,
I installed a fast photodiode in the path
  
  1687   Fri Jun 19 13:39:29 2009 AidanUpdateGeneralUpper limit measurement of the scatter from the eLIGO beam dumps. 
 D0900095_ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_3INCH_P.POL-3.PDFbeam_dump_expt.pngscatter_measurement1.pdfBRDF1.pdfIMG_0308.JPG 
  1694   Wed Jun 24 10:53:34 2009 Chris ZimmermanUpdateGeneralWeek 1/2 UpdateI've spent most of the last week doing
background reading; fourier transforms, shm,
e&m, and other physics that I didn't
  
  1695   Wed Jun 24 11:20:40 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateI have created the attached EOM circuit
with resonances at 11 MHz, 29.5 MHz, and
55 MHz (the magnitude and phase of the voltage
 EOM_CktDiagram.JPGEOM_VoltagePlot.JPG 
  1710   Wed Jul 1 10:56:42 2009 Chris ZimmermanUpdateGeneralWeek 2/3 UpdateI spent the last week working a lot with
the differences between a basic Michelson
readout and the new one as a displacement
  
  1711   Wed Jul 1 11:00:52 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateSince last week, I have come up with a
new circuit, which is shown in the attached
figure. The magnitude (solid) and phase (dashed)
 EOMCKT.pngPR1_VoltagePlot.pdf 
  1719   Wed Jul 8 10:56:04 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateThis week, I've been working on adapting
the last week's circuit to make it buildable.
Mostly this has involved picking components
 DSC_0566.JPGInitialBuiltCkt.pdfBuiltCkt_ExpectedResponse.png 
  1720   Wed Jul 8 11:05:40 2009 Chris ZimmermanUpdateGeneralWeek 3/4 UpdateThe last week I've spent mostly working
on calculating shot noise and other sensitivities
in three michelson sensor setups, the standard
 NSD_Displacement.png 
  1734   Sun Jul 12 23:14:56 2009 JenneOmnistructureGeneralWeb screenshots aren't being updatedBefore heading back to the 40m to check
on the computer situation, I thought I'd
check the web screenshots page that Kakeru
  
  1748   Wed Jul 15 12:11:17 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateThis week I've been working on testing
the first version of the prototype circuit.
Initially, I tested the circuit that I built
 MeasuredTransferFunction_R.jpgBuiltCkt_ExpectedResponse.pngMeasuredTransferFunction.jpg 
  1750   Wed Jul 15 12:44:28 2009 Chris ZimmermanUpdateGeneralWeek 4/5 UpdateI've spent most of the last week working
on finishing up the UCSD calculations, comparing
it to the EUCLID design, and thinking about
 Comparison.pdf 
  1754   Wed Jul 15 18:35:11 2009 StephanieUpdateGeneralMultiply Resonant EOM UpdateUsing FET probes, I was able to measure
a transfer function that looks a little more
like what I expected. There are only two
 BuiltCkt1_Final.pngBuiltCkt1_TransferFunctions.png 
  1762   Sun Jul 19 22:38:24 2009 robOmnistructureGeneralWeb screenshots aren't being updated


   
        
            
  
ELOG V3.1.3-