40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 116 of 344  Not logged in ELOG logo
Entry  Mon Jul 26 12:31:36 2010, kiwamu, Update, CDS, front end machine for the X end 
Entry  Mon Jul 26 14:24:46 2010, josephb, kiwamu, Update, CDS, RFM test take 1 
Entry  Mon Jul 26 20:12:18 2010, kiwamu, Update, SUS, OSEMs on PRM DSC_2279.JPG
Entry  Mon Jul 26 20:30:35 2010, Jenne, Update, SUS, 2 Tip Tilts suspended and balanced 
Entry  Tue Jul 27 11:43:24 2010, steve, Update, PEM, air quality is bad today pemtoday.jpg
Entry  Tue Jul 27 12:02:31 2010, Gopal, Update, Optic Stacks, Preliminary Transfer Function Measurements on MC1/MC3 MC1_MC3_FDA_1.pngMC1_MC3_FDA_2.pngMC1_MC3_FDA_3.pngMC1_MC3_FDA_4.pngMC1_MC3_FDA_5.png
Entry  Tue Jul 27 18:42:57 2010, Gopal, Update, Optic Stacks, Bode Magnitude Plot and Concerns Bode_Mag_MC1_MC3.png
   +  Reply  Tue Jul 27 21:38:21 2010, kiwamu, Update, SUS, installation of in-vac optics DSC_2284.JPGDSC_2291.JPG
Entry  Tue Jul 27 23:46:45 2010, Jenne, Update, SUS, Q measurements of 2 TTs 
   +  Reply  Wed Jul 28 01:05:44 2010, rana, Update, SEI, Bode Magnitude Plot and Concerns 
Entry  Wed Jul 28 12:09:06 2010, Sharmila,Katharine, Update, WIKI-40M Update, Maglev Picture_1.png
   +  Reply  Wed Jul 28 12:16:03 2010, Gopal, Update, SEI, Bode Magnitude Plot and Concerns Bode_Disp_MC1_MC3_y.png
Entry  Wed Jul 28 12:31:00 2010, Gopal, Update, WIKI-40M Update, 7.21.10-7.28.10 Weekly Update 
Entry  Wed Jul 28 12:53:32 2010, channa, Update, Computers, nds data listener 
Entry  Wed Jul 28 13:06:47 2010, Razib, Update, Phase Camera,  mean_100_snaps.pngstd_100_snaps.pngphase_cam_calc.pdf
Entry  Wed Jul 28 14:34:29 2010, channa, Update, Computers, installation on allegra 
Entry  Wed Jul 28 14:54:56 2010, steve, Update, SAFETY, evacuation drill at the 40m P1060520.JPG
   +  Reply  Wed Jul 28 16:42:21 2010, steve, Update, General, Crane gear box cheched P1060503.JPGP1060511.JPGP1060515.JPGP1060517.JPG
   +  Reply  Wed Jul 28 17:32:37 2010, kiwamu, Update, SUS, installation of in-vac optics 
Entry  Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned 
   +  Reply  Thu Jul 29 10:39:43 2010, kiwamu, Update, SUS, Re: installation of in-vac optics 
Entry  Thu Jul 29 11:33:38 2010, kiwamu, Update, CDS, PCI5565 driver for RFM 
Entry  Thu Jul 29 12:31:24 2010, josephb, Update, CDS, Working DAC, working IOP - next up SUS Simple_Green_Control.png
Entry  Thu Jul 29 15:35:21 2010, josephb, kiwamu, Update, CDS, Working out ADC/DAC/BO wiring 
Entry  Thu Jul 29 17:11:16 2010, Gopal, Update, COMSOL Tips, Including Gravity in COMSOL 
   +  Reply  Thu Jul 29 17:12:48 2010, josephb, kiwamu, Update, CDS, Re:Working out ADC/DAC/BO wiring DSC_2302.png
   +  Reply  Thu Jul 29 21:13:39 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
Entry  Thu Jul 29 22:08:32 2010, Alberto, Update, SUS, More optics installed on the BS table 
   +  Reply  Thu Jul 29 22:58:25 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
   +  Reply  Fri Jul 30 00:02:15 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
   +  Reply  Fri Jul 30 02:54:04 2010, Koji, Update, 40m Upgrading, More optics installed on the BS table 
   +  Reply  Fri Jul 30 09:51:58 2010, kiwamu, Update, Green Locking, Re: waist positon of Gaussian beam in PPKTP crystals efficiency_waist_edit.pngPPKTPmode.pngPSL_doubling.pngmode_in_PPKTP.png
   +  Reply  Fri Jul 30 14:53:09 2010, steve, Update, General, PSL table leg upgrade psllegs.PDF
Entry  Fri Jul 30 17:24:22 2010, Jenne, Update, PEM, Guralps back in the 40m 
   +  Reply  Sat Jul 31 10:12:05 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
   +  Reply  Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
Entry  Sat Jul 31 17:37:36 2010, josephb, Update, CDS, Cables needed for CDS test 
Entry  Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr 
   +  Reply  Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr 
Entry  Mon Aug 2 17:12:28 2010, Koji, Update, General, Lab schedule for the week of Aug. 2 PSL_work_schedule.pdf
Entry  Mon Aug 2 18:02:46 2010, Jenne, Update, PEM, Seismometer Update: Still not good, but perhpas getting better 
Entry  Mon Aug 2 21:52:57 2010, Koji, Update, IOO, MC is running at the full power 
   +  Reply  Tue Aug 3 01:51:01 2010, Jenne, Update, PEM, Seismometer Update: Still not good, but perhaps getting better 
Entry  Tue Aug 3 03:15:06 2010, nancy, Update, IOO, MC back to locked mode 
   +  Reply  Tue Aug 3 11:17:10 2010, kiwamu, Update, CDS, Diagrams for Cables needed for CDS test sus_wiring.pngsus_new_wiring.pngsus_missing_stuff.png
Entry  Tue Aug 3 11:50:16 2010, Jenne, Update, PEM, Seismometer Problem Tracked down 
   +  Reply  Wed Aug 4 03:01:56 2010, Jenne, Update, PEM, Catastrophic Cable Failures 
Entry  Wed Aug 4 11:10:28 2010, nancy, Update, IOO, Mode Cleaner WFS 
   +  Reply  Wed Aug 4 12:49:42 2010, nancy, Update, IOO, Mode Cleaner WFS 6x
Entry  Wed Aug 4 16:52:59 2010, Razib, Aidan, Update, Phase Camera, Sideband power measurement (updated) Setup_08_04_2010.jpgpower_40MHz.pngpower_25MHz.png
ELOG V3.1.3-