40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 116 of 355  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  7390   Fri Sep 14 18:18:33 2012 JenneUpdateGeneralIn Vac Pictures

    

       
            
 mmt2.jpg 
  7391   Fri Sep 14 18:28:25 2012 JenneUpdateGeneralIn Vac PicturesAll the photos so far:
PZT1:
 pzt1_light.jpgmmt1.jpgmmt2.jpgpzt2.jpgippo.jpg 
  14614   Thu May 16 22:58:25 2019 gautamUpdateASSIn air ASS test with green?We were wondering yesterday if we can somehow
test the ASS system in air. Though the arm
cavity can be locked with the low power IMC
  
  12353   Fri Jul 29 03:59:55 2016 ericqUpdateSUSIn air OSEM diagonalization checkThe question arose whether we can get good
enough data to diagonize our OSEM sensing
matrices in air. 
 BS_OSEM_diag.pdf 
  460   Tue Apr 29 21:30:49 2008 AndreyUpdatePEMIn the process of renaming channels for Weather Station
I startted renaming channels for the weather
station, and I will continue this tomorrow,
  
  7314   Thu Aug 30 00:08:34 2012 jamieUpdateGeneralIn vac plans for tomorrow, 8/30

    

       
            
  
  7315   Thu Aug 30 08:12:39 2012 SteveUpdateGeneralIn vac plans for tomorrow, 8/30 
 1,PRM spot can be viewed directly
from the window south-east of ITMX chamber. 
  
  14069   Fri Jul 13 20:36:33 2018 KojiSummaryGeneralIn vac/In air heater wiring I went to the Y-end and took more photos
of the cable stand. These revealed that in-vac
pin #13 is connected to the shield of the
 heater_wiring.pdf 
  846   Mon Aug 18 11:50:29 2008 YoichiUpdateSUSIn vacuum free swinging resultsThe first attachment is the results of the
free swinging spectra measurement performed
in vacuum this morning.
 2008-8-18.pdfspike.pdf 
  9608   Thu Feb 6 16:41:31 2014 ericqUpdateGeneralIn-Vac Alignment[Manasa, ericq]
Both arms
  
  9609   Fri Feb 7 12:43:12 2014 ericqUpdateGeneralIn-Vac Alignment[ericq]
  
  9610   Fri Feb 7 13:00:52 2014 JenneUpdateGeneralIn-Vac Alignment

    

       
            
  
  9611   Fri Feb 7 13:30:22 2014 GabrieleUpdateGeneralIn-Vac Alignment

    

       
            
  
  9612   Fri Feb 7 13:30:25 2014 ericqUpdateGeneralIn-Vac Alignment

    

       
            
  
  15464   Thu Jul 9 17:12:52 2020 gautamUpdateBHDIn-air BHDSummary:

We can probably learn something
about the interferometer / top level BHD
 OMCchamber.pdfAP_Table_20180328.pdf 
  15493   Sun Jul 19 15:40:15 2020 gautamUpdateBHDIn-air BHD - CDS and wiring summaryAttachment
#1 shows the proposed
 wiringDiagram.pdf 
  15505   Wed Jul 29 11:57:59 2020 ranaUpdateBHDIn-air BHD - CDS and wiring summary3. I agree - this whitening will be handy
to have for diagnostics.

4. I think in principle, we can
  
  15479   Tue Jul 14 15:29:25 2020 gautamUpdateBHDIn-air BHD - DCPD amplifier noiseFor the first pass, it's probably easiest
to use the existing DCPD
amplifier. Looking at the gain and noise
 DCPDamp.pdf 
  15497   Tue Jul 21 00:30:24 2020 gautamUpdateBHDIn-air BHD - LO RINAttachment
#1 shows the RIN of
 LO_RIN.pdf 
  15483   Wed Jul 15 19:11:40 2020 gautamUpdateBHDIn-air BHD - alignment into OMCI forgot about the pointing - probably
we will need another actuator to control
the pointing of the AS beam onto the DCPDs.
  
  Draft   Wed Jul 15 19:17:09 2020 gautamUpdateBHDIn-air BHD - alignment into OMCYou can activate all 3axis

 
  
  15489   Thu Jul 16 01:12:22 2020 gautamUpdateBHDIn-air BHD - preparing the LO pathAttachment
#1 - The 80mW pickoff
 IMG_8626.JPGIMG_8627.JPGIMG_8628.JPGIMG_8629.JPG 
  15495   Mon Jul 20 17:55:15 2020 gautamUpdateBHDIn-air BHD - preparing the LO pathThe LO pickoff has been coupled into a
fiber with ~90% MM (8 mW / 9 mW input). While
I wait for the DCPD electronics to be found
  
  16530   Tue Dec 21 16:52:39 2021 AnchalSummaryElectronicsIn-air Sat Amp to Vacuum Flange cables laid for 7 new SOS[Anchal, Yehonathan, Chub]

We today laid down 14 70 ft long
DB25 cables from 1Y1 (6), 1Y0 (8) to ITMY
  
  7877   Mon Jan 7 00:08:16 2013 JenneHowToAlignmentIn-vac planList of things to do, in order:
* Remove BS heavy door. 
Steve,
  
  16891   Mon Jun 6 09:37:16 2022 JCUpdateSUSInMatCalc[Paco, JC]

Paco and I attempted to calculate
the input matrices from May 24, 2022, but
  
  5924   Thu Nov 17 11:51:14 2011 JenneUpdateEnvironmentIncandescent vs. fluorescent lights?I'm just on an elog roll this morning...
Again while poking around inside
the IFO room, I noticed that they have replaced
  
  5695   Wed Oct 19 12:06:26 2011 MirkoUpdateCDSIncluded the MC servo channel in CDS[Jamie, Mirko]
Included the 'Servo' output from
the D040180 in c1ioo, which I hoped would
 MC_F_versus_MC_SERVO.pngCoh_MC_F_MC_SERVO.png 
  3322   Thu Jul 29 17:11:16 2010 GopalUpdateCOMSOL TipsIncluding Gravity in COMSOL[Gopal, Jan]
  
  10634   Thu Oct 23 02:08:40 2014 JenneUpdateLSCIncreased DARM gainI changed the carm_cm_up.sh script so
that it requires fewer human interventions. 
Rather than stopping and asking for things
 6x 
  10637   Fri Oct 24 02:14:05 2014 JenneUpdateLSCIncreased DARM gain even more[Jenne, Diego]
We spent the afternoon working on
the new scan for IR resonance script. 
 DARM_23Oct2014.pdf 
  2000   Thu Sep 24 21:04:15 2009 JenneUpdateMOPAIncreasing the power from the MOPA[Jenne, Rana, Koji]
Since
  
  2007   Sun Sep 27 12:52:56 2009 ranaUpdateMOPAIncreasing the power from the MOPAThis is a trend of the last 20 days. After
our work with the NPRO, we have recovered
only 5% in PMC trans power, although there's
 Picture_3.png 
  14463   Sun Feb 17 17:35:04 2019 gautamSummaryLoss MeasurementInferred X arm loss Summary:

To complete the story before moving
on to ALS, I decided to measure the X arm
 DQcheck_XARM.pdfconsolidated.pdfposterior_modelParams_XARM.pdfposterior_Loss_XARM.pdf 
  14454   Thu Feb 14 21:29:24 2019 gautamSummaryLoss MeasurementInferred Y arm loss Summary:

From the measurements I have, the
Y arm loss is estimated to be 58
 modelPerturb.pdfposterior_modelParams.pdfposterior_Loss.pdf 
  15163   Tue Jan 28 14:33:24 2020 gautamUpdatePSLInferred free-running frequency noiseTo conclude my PMC noise investigations:
Attachment
 inLoopNoise_IMClocked.pdffreqNoiseComparison.pdf 
  16323   Mon Sep 13 17:05:04 2021 TegaSummaryPEMInfrasensing temperature sensor modbus configurationAnchal mentioned it would be good to put
more details about how I arrived at the values
needed to configure the modbus drive for
  
  16761   Thu Apr 7 11:47:22 2022 YehonathanUpdateBHDInitial BHD modeling: AS - LO mode matching

I begin modeling the initial BHD
  
  16766   Thu Apr 7 21:15:04 2022 YehonathanUpdateBHDInitial BHD modeling: AS - LO mode matchingOk, it turns out these optics were purchased
on purpose, as this elog
shows. Jon considered building a mode-matching
  
  16858   Mon May 16 16:13:01 2022 YehonathanUpdateBHDInitial BHD modeling: Damped suspension modelI was finally able to set up a stable suspension
model with the help of Yuta and I'm now
ready to start doing some MICH noise
 Damped_SUS.pngETMY_SUSPOS_GOL.pdfSUS_Response.png 
  3284   Sat Jul 24 13:13:41 2010 rana, steve, albertoUpdateGeneralInitial Crane Inspection reveals flaws: wiring and oilThe guy from KroneCrane (sp?) came today
and started the crane inspection on the X
End Crane. There were issues with our crane
  
  3290   Mon Jul 26 10:04:24 2010 steveUpdateGeneralInitial Crane Inspection reveals flaws: wiring, oil and imbalance


   
        
            
 2500.JPGsedrum.JPG 
  360   Wed Mar 5 12:51:48 2008 JohnSummaryLSCInitial Ligo Arm finesse versus lambdaI've taken the coating recipes for the initial
ligo arm cavity from Rana's web page (ligo.caltech/edu/~rana/mat/)
and plotted the finesse as a function of
 FofLambdaLIGOI.jpg 
  7599   Tue Oct 23 17:30:33 2012 jamie, nic, jenne, raji, manasaUpdateAlignmentInitial attempts to fix IFO alignmentWe went into the vertex today to see about
fixing the alignment.  The in-air access
connector is in place, and we took heavy
  
  12080   Fri Apr 15 23:11:49 2016 gautamUpdateGeneralInnolight 1W moved to SP tableI
have moved the 1W Innolight + controller
from the PSL table to the SP table for beam
  
  2810   Mon Apr 19 16:31:42 2010 KevinUpdatePSLInnolight 2W LaserKoji and Kevin 
We unpacked the Innolight 2W laser,
took an inventory, and scanned the operations
  
  2822   Tue Apr 20 20:15:37 2010 KevinUpdatePSLInnolight 2W Output Power vs Injection CurrentKoji and Kevin measured the output power
vs injection current for the Innolight 2W
laser.
 PvsI_2W.jpg 
  2828   Wed Apr 21 21:56:27 2010 KevinUpdatePSLInnolight 2W Vertical Beam ProfileKoji and Kevin measured the vertical beam
profile of the Innolight 2W laser at one
point.
 bp2.jpgbp2.dat 
  2829   Wed Apr 21 22:11:48 2010 ranaUpdatePSLInnolight 2W Vertical Beam ProfileBack in Gainesville in 1997, I learned
how to do this using the chopper wheel.
  
  2830   Wed Apr 21 23:35:37 2010 KojiUpdatePSLInnolight 2W Vertical Beam ProfileGood fit. I assumed sqrt(x) is a typo of
sqrt(2).

  
ELOG V3.1.3-