40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 115 of 170  Not logged in ELOG logo
Entry  Tue Nov 16 10:47:45 2010, Aidan, Update, Green Locking, Rebooted c1psl - added new GRNBEAT_FREQ channel 
Entry  Tue Nov 16 09:02:54 2010, Aidan, Update, Green Locking, PID loop - calibration of SR620 output 
Entry  Tue Nov 16 03:33:22 2010, yuta, Update, IOO, aligned Faraday, beam reached SM just before PRM MCalignNov16.png
Entry  Mon Nov 15 22:24:28 2010, Suresh, Update, SUS, Selection of Magnets 
Entry  Mon Nov 15 11:52:22 2010, kiwamu, Update, Green Locking, PLL with real green signal PLL_with_green.png
    Reply  Mon Nov 15 17:10:59 2010, kiwamu, Update, Green Locking, PLL with real green signal FCnoise.png
Entry  Mon Nov 15 16:26:46 2010, josephb, Update, CDS, c1iscex is now running and the network hasn't died 
Entry  Mon Nov 15 16:09:44 2010, Jenne, Update, VAC, ETMX, ETMY, ITMY chambers opened 
Entry  Mon Nov 15 15:02:00 2010, Koji, Summary, PSL, power measurements around the PMC 
Entry  Wed Nov 10 22:29:42 2010, kiwamu, Update, IOO, misaligned the wideband EOM 
    Reply  Mon Nov 15 15:01:51 2010, kiwamu, Update, IOO, realigned the wideband EOM 
Entry  Mon Nov 15 14:36:37 2010, Koji, Update, PSL, C1PSL rebooted?  
    Reply  Mon Nov 15 14:42:01 2010, Aidan, Update, PSL, C1PSL rebooted?  
Entry  Mon Nov 15 11:13:12 2010, josephb, Update, CDS, Modified rc.local to not start mx_streams automatically 
Entry  Sun Nov 14 16:26:31 2010, jenne, valera, Update, Electronics, SRM side OSEM noise with no magnet SRM-SD-Current-NoMagnet.pdf
    Reply  Mon Nov 15 04:57:10 2010, rana, Update, Electronics, SRM side OSEM noise with no magnet 
Entry  Sun Nov 14 16:40:46 2010, Jenne, Update, Treasure, Activities related to OSEM measurement 
Entry  Fri Nov 12 10:49:34 2010, josephb, valera, Update, CDS, Test of ADC noise ADC_noise.pdf
    Reply  Fri Nov 12 19:24:56 2010, Koji, Update, CDS, Test of ADC noise 
    Reply  Sun Nov 14 11:56:59 2010, valera, Update, CDS, Test of ADC noise 
Entry  Sun Nov 14 02:59:31 2010, rana, Configuration, General, MEDM snapshots web page 
Entry  Sat Nov 13 16:57:21 2010, valera, Configuration, Electronics, PRM Side OSEM transimpedance change PRM-SD-ADC.pdfPRM-SD-Current.pdf
Entry  Fri Nov 12 20:40:51 2010, josephb, yuta, valera, Configuration, Electronics, AA voltage range 
Entry  Fri Nov 12 13:12:55 2010, kiwamu, Update, PSL, increased NPRO power 
Entry  Fri Nov 12 12:06:11 2010, Aidan, Configuration, Green Locking, PID script working - now it needs to be tuned Screen_shot_2010-11-12_at_12.05.01_PM.png
Entry  Fri Nov 12 11:36:06 2010, Aidan, Configuration, Computers, Fixed the PERL PATH errors from the scripts directory change 
Entry  Fri Nov 12 00:42:11 2010, rana, koji, Update, IOO, MC alignment 
    Reply  Fri Nov 12 06:10:24 2010, yuta, Update, IOO, MC aligned (without coil balancing) MCalignCALIB.png
Entry  Fri Nov 12 02:51:20 2010, Kevin, Update, Electronics, Photodiode Testing 
Entry  Fri Nov 12 00:13:34 2010, Suresh, Update, SUS, ETM assembly started 
Entry  Thu Nov 11 04:32:53 2010, yuta, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong 
    Reply  Thu Nov 11 11:51:30 2010, Koji, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong 
       Reply  Thu Nov 11 23:35:23 2010, Koji, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong IMG_3698.jpgbad-boys.pngIMG_3705.jpgIMG_3706.jpg
Entry  Thu Nov 11 21:07:49 2010, josephb, Update, CDS, Plugged c1iscex into DAQ network - still causes network slowdown 
Entry  Thu Nov 11 18:05:55 2010, valera, Update, PSL, PMC mode matching at full laser power scan.pdfpmc2-abcd.png
Entry  Thu Oct 28 03:07:53 2010, kiwamu, Update, Green Locking, 80MHz VCO for green PLL : a health check VCO_LPF_fit.png
    Reply  Fri Oct 29 06:20:20 2010, kiwamu, Update, Green Locking, 80MHz VCO for green PLL : VCO calibration calibration.png
       Reply  Fri Oct 29 14:06:12 2010, kiwamu, Update, Green Locking, Re: 80MHz VCO for green PLL : VCO calibration 
       Reply  Mon Nov 8 10:48:58 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good vco_pll.pngVCO_PLL.png
          Reply  Mon Nov 8 16:03:46 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good 
          Reply  Thu Nov 11 13:54:05 2010, kiwamu, Update, Green Locking, 80MHz VCO : about PLL hold-in range range_green.pngPLL.png
             Reply  Thu Nov 11 17:47:36 2010, kiwamu, Update, Green Locking, 80MHz VCO : improve PLL hold-in range and put a boost vco_pll.pngVCO_lfb.png
Entry  Thu Nov 11 15:27:43 2010, valera, steve, Configuration, , ISS AOM installed 
Entry  Thu Nov 11 11:08:26 2010, steve, Bureaucracy, PEM, AP table found open 
Entry  Thu Nov 11 02:17:27 2010, Kevin, Update, Electronics, REFL11 Photodiode Not Working 
    Reply  Thu Nov 11 07:26:03 2010, Alberto, Update, Electronics, REFL11 Photodiode Not Working 
Entry  Thu Nov 11 05:56:04 2010, yuta, Summary, IOO, setting up temporary oplev for coil balancing of MCs MC2coils.png
Entry  Thu Nov 11 01:34:27 2010, Jenne, Update, SUS, New-Old ETM towers assembled 
Entry  Sat Nov 6 07:26:54 2010, yuta, Summary, IOO, reduced common mode displacement of the beam through MC1 to MC3 A2LMCalign.png
    Reply  Tue Nov 9 05:40:12 2010, yuta, Summary, IOO, MC aligning going on MCalignNov9.png
       Reply  Wed Nov 10 02:51:35 2010, yuta, Summary, IOO, limitation of current MC aligning MCalignNov9.png
          Reply  Wed Nov 10 11:46:19 2010, Koji, Summary, IOO, limitation of current MC aligning 
             Reply  Wed Nov 10 12:21:18 2010, yuta, Summary, IOO, limitation of current MC aligning 
                Reply  Wed Nov 10 14:28:33 2010, Koji, Summary, IOO, limitation of current MC aligning 
Entry  Mon Nov 8 18:30:33 2010, Suresh, Update, IOO, MC Trans Mon QPD gain increased by 50x 
Entry  Mon Nov 8 14:30:15 2010, josephb, yuta, Update, CDS, Added LIGONDSIP setting to cshrc.40m 
Entry  Mon Nov 8 10:37:14 2010, Koji, Update, IOO, The 10% pick-off for MCREFL was replaced to a HR mirror 
Entry  Fri Nov 5 15:20:18 2010, josephb, alex, Summary, CDS, 40m computer slow down solved 
    Reply  Fri Nov 5 21:49:12 2010, rana, Summary, CDS, 40m computer slow down solved 
       Reply  Sat Nov 6 16:13:14 2010, rana, Summary, CDS, 40m computer slow down solved 
Entry  Sat Nov 6 01:54:15 2010, Frank, Summary, Computers, virus definition file update on laptop for dinocam 
Entry  Sat Nov 6 00:49:04 2010, Koji, Update, IOO, IMC table work 
Entry  Fri Nov 5 23:05:43 2010, rana, Configuration, IOO, ioo.db file changed in c1iool0 to get back MC TRANS 
Entry  Fri Nov 5 19:33:18 2010, Jenne, Update, Electronics, The beginnings of the new phase of the RF work 
Entry  Fri Nov 5 16:40:22 2010, josephb, alex, Update, CDS, c1ioo now has working awgtpman 
Entry  Thu Nov 4 17:53:29 2010, yuta, Update, CDS, primitive python script for A2L measurement a2ltest.png
    Reply  Fri Nov 5 14:06:19 2010, yuta, Update, IOO, tried to align MC by A2L measurement A2LmeasurementFigures.png
Entry  Fri Nov 5 09:08:14 2010, steve, Update, SUS, epoxy 11081001.PDF
Entry  Thu Nov 4 19:26:51 2010, Suresh, Update, Locking, Changes to the Video MUX reversed 
Entry  Thu Nov 4 19:00:57 2010, Suresh, Update, Locking, Fibre coupling 1064nm light at the south-end table 
Entry  Thu Nov 4 17:57:27 2010, steve, Update, General, BeamScanner is working again P1070024.JPG
Entry  Thu Nov 4 17:24:49 2010, steve, Update, General, conflat flanges for MIT P1070020.JPG
Entry  Thu Nov 4 15:27:33 2010, josephb, yuta, Update, CDS, c1ioo test points not working 
Entry  Thu Nov 4 15:15:43 2010, josephb, Update, CDS, Modified feCodeGen.pl, fmseq.pl, and suspension screens 
ELOG V3.1.3-