Fri Nov 19 03:43:33 2010, Kevin, Update, Electronics, REFL55 Characterizations
|
Fri Nov 19 15:51:50 2010, Koji, Update, Electronics, REFL55 Characterizations
|
Fri Nov 19 12:53:50 2010, josephb, Update, CDS, Testpoints on c1iscex now working
|
Fri Nov 19 04:23:12 2010, Suresh, Update, SUS, Cleaned and stuck magnets to dumbbells 7x
|
Thu Nov 18 23:45:18 2010, rana, Configuration, PSL, PMC Refl Cam
|
Thu Nov 18 17:42:20 2010, Joonho Lee, Summary, Electronics, CCD cables.
|
Thu Nov 18 16:42:29 2010, Joonho Lee, Configuration, Electronics, Quad Video for PMCT, RCT, RCR fixed.
|
Thu Nov 18 16:32:21 2010, yuta, Summary, CDS, current damping status for all optics c1sus handles
|
Thu Nov 18 14:19:01 2010, josephb, Update, CDS, Swapped c1auxex and c1auxey codes
|
Thu Nov 18 14:05:06 2010, josephb, yuta, Update, CDS, c1sus is alive!
|
Thu Nov 18 11:06:20 2010, josephb, Update, CDS, c1sus and ADCs
|
Thu Nov 18 01:52:58 2010, Kevin, Update, Electronics, REFL55 Transfer Functions
|
Thu Nov 18 00:40:31 2010, yuta, Update, IOO, PRM reflected beam reached AP table
|
Wed Nov 17 23:45:20 2010, Jenne, Update, SUS, A bad day for suspensions
|
Wed Nov 17 20:44:59 2010, yuta, Summary, CDS, no QPD channels on c1sus machine today
|
Wed Nov 17 16:02:30 2010, josephb, Update, CDS, Modified feCodeGen.pl to fix filtMuxMatrix name generation
|
Wed Nov 17 15:49:53 2010, rana, Update, DAQ, Ole Channel Names
|
Tue Nov 16 21:42:31 2010, rana, Update, CDS, Screen Time Fix
|
Wed Nov 17 10:39:20 2010, josephb, Update, CDS, Screen Time Fix
|
Wed Nov 17 02:53:41 2010, yuta, Update, IOO, placed new PRM to BS table
|
Tue Nov 16 23:36:29 2010, Suresh, Jenne, Update, SUS, Assembly of ETMs
|
Tue Nov 16 12:47:30 2010, Aidan, Update, Green Locking, PID loop but no green
|
Tue Nov 16 16:00:26 2010, Aidan, Update, Green Locking, PID loop but no green
|
Tue Nov 16 15:32:18 2010, valera, Update, Electronics, OSEM noise at the output of the satellite box
|
Tue Nov 16 10:47:45 2010, Aidan, Update, Green Locking, Rebooted c1psl - added new GRNBEAT_FREQ channel
|
Tue Nov 16 09:02:54 2010, Aidan, Update, Green Locking, PID loop - calibration of SR620 output
|
Tue Nov 16 03:33:22 2010, yuta, Update, IOO, aligned Faraday, beam reached SM just before PRM
|
Mon Nov 15 22:24:28 2010, Suresh, Update, SUS, Selection of Magnets
|
Mon Nov 15 11:52:22 2010, kiwamu, Update, Green Locking, PLL with real green signal
|
Mon Nov 15 17:10:59 2010, kiwamu, Update, Green Locking, PLL with real green signal
|
Mon Nov 15 16:26:46 2010, josephb, Update, CDS, c1iscex is now running and the network hasn't died
|
Mon Nov 15 16:09:44 2010, Jenne, Update, VAC, ETMX, ETMY, ITMY chambers opened
|
Mon Nov 15 15:02:00 2010, Koji, Summary, PSL, power measurements around the PMC
|
Wed Nov 10 22:29:42 2010, kiwamu, Update, IOO, misaligned the wideband EOM
|
Mon Nov 15 15:01:51 2010, kiwamu, Update, IOO, realigned the wideband EOM
|
Mon Nov 15 14:36:37 2010, Koji, Update, PSL, C1PSL rebooted?
|
Mon Nov 15 14:42:01 2010, Aidan, Update, PSL, C1PSL rebooted?
|
Mon Nov 15 11:13:12 2010, josephb, Update, CDS, Modified rc.local to not start mx_streams automatically
|
Sun Nov 14 16:26:31 2010, jenne, valera, Update, Electronics, SRM side OSEM noise with no magnet
|
Mon Nov 15 04:57:10 2010, rana, Update, Electronics, SRM side OSEM noise with no magnet
|
Sun Nov 14 16:40:46 2010, Jenne, Update, Treasure, Activities related to OSEM measurement
|
Fri Nov 12 10:49:34 2010, josephb, valera, Update, CDS, Test of ADC noise
|
Fri Nov 12 19:24:56 2010, Koji, Update, CDS, Test of ADC noise
|
Sun Nov 14 11:56:59 2010, valera, Update, CDS, Test of ADC noise
|
Sun Nov 14 02:59:31 2010, rana, Configuration, General, MEDM snapshots web page
|
Sat Nov 13 16:57:21 2010, valera, Configuration, Electronics, PRM Side OSEM transimpedance change 
|
Fri Nov 12 20:40:51 2010, josephb, yuta, valera, Configuration, Electronics, AA voltage range
|
Fri Nov 12 13:12:55 2010, kiwamu, Update, PSL, increased NPRO power
|
Fri Nov 12 12:06:11 2010, Aidan, Configuration, Green Locking, PID script working - now it needs to be tuned
|
Fri Nov 12 11:36:06 2010, Aidan, Configuration, Computers, Fixed the PERL PATH errors from the scripts directory change
|
Fri Nov 12 00:42:11 2010, rana, koji, Update, IOO, MC alignment
|
Fri Nov 12 06:10:24 2010, yuta, Update, IOO, MC aligned (without coil balancing)
|
Fri Nov 12 02:51:20 2010, Kevin, Update, Electronics, Photodiode Testing
|
Fri Nov 12 00:13:34 2010, Suresh, Update, SUS, ETM assembly started
|
Thu Nov 11 04:32:53 2010, yuta, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong
|
Thu Nov 11 11:51:30 2010, Koji, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong
|
Thu Nov 11 23:35:23 2010, Koji, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong   
|
Thu Nov 11 21:07:49 2010, josephb, Update, CDS, Plugged c1iscex into DAQ network - still causes network slowdown
|
Thu Nov 11 18:05:55 2010, valera, Update, PSL, PMC mode matching at full laser power 
|
Thu Oct 28 03:07:53 2010, kiwamu, Update, Green Locking, 80MHz VCO for green PLL : a health check
|
Fri Oct 29 06:20:20 2010, kiwamu, Update, Green Locking, 80MHz VCO for green PLL : VCO calibration
|
Fri Oct 29 14:06:12 2010, kiwamu, Update, Green Locking, Re: 80MHz VCO for green PLL : VCO calibration
|
Mon Nov 8 10:48:58 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good 
|
Mon Nov 8 16:03:46 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good
|
Thu Nov 11 13:54:05 2010, kiwamu, Update, Green Locking, 80MHz VCO : about PLL hold-in range 
|
Thu Nov 11 17:47:36 2010, kiwamu, Update, Green Locking, 80MHz VCO : improve PLL hold-in range and put a boost 
|
Thu Nov 11 15:27:43 2010, valera, steve, Configuration, , ISS AOM installed
|
Thu Nov 11 11:08:26 2010, steve, Bureaucracy, PEM, AP table found open
|
|