40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 113 of 170  Not logged in ELOG logo
Entry  Thu Dec 16 10:52:42 2010, josephb, Update, Cameras, New PoE digital cameras basler.jpg
We have two new Basler acA640-100gm cameras.  These are power over ethernet (PoE) and very tiny.
Entry  Thu Dec 9 23:17:47 2010, kiwamu, Update, SUS, beam pointing has been done 
[Koji, Osamu and Kiwamu]
 We aligned the beam axis pointing down to both X and Y arm.
Now the beams are hitting the centers of both ETMX and ETMY.
    Reply  Fri Dec 10 09:58:57 2010, Aidan, Update, SUS, beam pointing has been done 
Good news. I feel multi-chromatic-locking success is just around the corner.
By the way, there's a new presentation on the DCC from the ANU group where they've locked a short single cavity with both colors - G1000735:
https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=14040
       Reply  Sat Dec 11 00:41:55 2010, kiwamu, Update, IOO, alignment of IP_ANG is done 
  [Jenne, Koji and Kiwamu]
 We finished a coarse alignment of IP_ANG.
 The beam for IP_ANG successfully reached to the ETMY chamber
          Reply  Tue Dec 14 01:04:23 2010, kiwamu, Update, SUS, alignment of ITMs and PRM done 
   The alignment of the ITMs and the
PRM has been done.
 As a result their reflections now come
             Reply  Tue Dec 14 15:15:19 2010, kiwamu, Update, SUS, put ETMY and aligned the beam 
  [Zach and Kiwamu]
 We installed the new ETMY tower and successfully aligned the beam
to the center of ETMY.
                Reply  Tue Dec 14 22:42:56 2010, kiwamu, Update, SUS, installed the last TT . And some more progresses 
  [Koji, Oasmu and Kiwamu]
 
We made the following progresses
                   Reply  Thu Dec 16 01:23:43 2010, kiwamu, Update, SUS, SRM OSEMs installed DSC_2757_ss.jpg
  [Zach and Kiwamu]
 We worked on some more vacuum businesses.  Today we finished
did the following works:
Entry  Wed Dec 15 23:10:40 2010, Koji, Update, IOO, SRM Oplev / Dark Steering mirrors installed 
I helped the vacuum installation work in the evening.
- Three steering mirrors after the SRM (OM1-OM3) were installed on the table. OM1 and OM2 were aligned.
  OM3 is in-place but not aligned to the OM4 (PZT).
Entry  Wed Dec 15 18:29:59 2010, Jenne, Update, PEM, Seismometer Channels Being Recorded Again 
The Seismometer channels are once more being recorded.  Alastair brought Gur1 back from the ATF the other day, and today I put it in its place below
MC2 (yeah, the numbers are backwards.  But they always have been.) 
I checked the matching between BNC inputs on the breakout box to the ADC channels as labeled in the SimuLink diagram.  To do this I had all
Entry  Wed Dec 15 17:21:20 2010, josephb, Update, CDS, ETMY controls status 
Status:
The c1iscey was converted over to be a diskless Gentoo machine like the other front ends, following the instructions
found here
Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration
so one has to pay attention that the foreline valves are open.
Reset  error message on vacuum screen and opened V4 & V5 at 3pm today.
Entry  Wed Dec 15 13:36:44 2010, josephb, Update, CDS, ETMY IO chassis update 
I gave Alex a sob story over lunch about having to go and try to resurrect dead VME crates.  He and Rolf then took
pity on me and handed me their last host interface board from their test stand, although I was warned by Rolf that this one (the latest generation board
from One Stop) seems to be flakier than previous versions, and may require reboots if it starts in a bad state.
    Reply  Wed Dec 15 14:23:32 2010, Koji, Update, CDS, ETMY IO chassis update 
Great!
 I wish this board works fine at least for several days...


    
        
            Quote:
        
        
            
Entry  Wed Dec 15 12:46:18 2010, Koji, Summary, IOO, Finishing up the vac work 
What else?
v: Edit on Dec 15 10PM
v: Edit on Dec 16 10PM 
Entry  Tue Dec 14 11:24:35 2010, josephb, Update, CDS, burt restore 
I had updated the individual start scripts, but forgotten to update the rc.local file on the front ends to handle burt
restores on reboot.
I went to the fb machine and into /diskless/root/etc/ and modified the rc.local file there.
Entry  Tue Dec 14 09:26:17 2010, Zach, Update, elog, restarted 
 Restarted the elog with the script
Entry  Mon Dec 13 21:03:30 2010, Kevin, Update, Electronics, RF Photodiode Characterizations 
[Koji, Jenne, Kevin]
Jenne worked on fixing REFL11 last week (see elog 4034) and was able to measure an electrical
transfer function. Today, I tried to measure an optical transfer function but REFL11 is still not responding to any optical input. I tried shining both
    Reply  Tue Dec 14 04:14:53 2010, rana, Update, Electronics, RF Photodiode Characterizations 
This is looking better, but the fit data for the TF should be plotted along with the data. The data should be made up of points and the fit a line.
For the fit, we should have the Q of the main resonance as well as the peak height of the main resonance and the values of the gain at the notch
frequencies.
Entry  Mon Dec 13 22:21:41 2010, kiwamu, Summary, SUS, funny output matrix of ETMX: solved ! 
I found that a few connections in the simulink model of c1scx was incorrect, so I fixed them correctly.
It had been a mystery why we had
Entry  Mon Dec 13 18:06:43 2010, Jenne, Update, SUS, ETMY resuspended, ready to install. Tip Tilt realigned, ready to install. StatusTable.png
[Koji, Jenne]
I wish I could use a bigger font for this, but, th
Entry  Mon Dec 13 17:18:47 2010, josephb, Update, CDS, Burt updates 
Problem:
Autoburt wouldn't restore settings for front ends on reboot
What was done:
First I moved the burt directory over
to the new directory structure.
Entry  Mon Dec 13 11:56:32 2010, josephb, alex, Update, CDS, Dolphin is working 
Problem:
The dolphin RFM was not sending data between c1lsc and c1sus.
Solution:
Dig into the controller.c code located in /opt/rtcds/caltech/c1/core/advLigoRTS/src/fe/. 
Find this bit of code on line 2173:
Entry  Fri Dec 10 12:55:27 2010, Jenne, Update, Computers, Backup should be running successfully now 
[Joe, Jenne]
The nightly backup of the frames and the /cvs/cds directories is back up and running.  We are free again to do crazy stuff at will, and it
will all be saved for eternity.
Entry  Fri Dec 10 11:51:20 2010, Osamu, Update, SUS, ITM seems bad 20101209_ITMX_drift.png20101209_ITMX_2stages.png

This graph shows 5 hours data in minute trend for ITMX and ETMX from 5am to 10 am today. ITM pitch drift is 3 times lager than ETM pitch if the
Entry  Fri Dec 10 11:04:03 2010, Osamu, Update, SUS, ETM oplev mufunctioning 20101208_ETMX_oplev_sum.png

 
Entry  Thu Dec 9 12:24:46 2010, kiwamu, Update, SUS, strange ETMX suspension ETMX_spectr.png
[Koji, Osamu and Kiwamu]
We found that the ETMX free swinging spectra showed a strange resonant frequencies.
We are going to inspect the suspension today.
    Reply  Thu Dec 9 22:04:40 2010, kiwamu, Update, SUS, Re:strange ETMX suspension 
[Koji, Osamu and Kiwamu]
We checked the ETMX suspension and found the UR OSEM was close to the magnet.
So we rotated the UR OSEM so that it won't touch the magnet any more.
Entry  Thu Dec 9 12:28:52 2010, josephb, alex, Update, CDS, The Dolphin is in (Reflected memory that is) 
Setting the Configurations files:
On the fb machine in /etc/dis/ there are several configurations files that need to be set for our dolphin
network.
First, we modify networkmanager.conf.
Entry  Thu Dec 9 01:14:42 2010, Osamu, Update, SUS,  20101208_ITMX_jump2.png
After Kiwamu had set the free swinging mode for ITMX and ETMX, I found a big jump of ITMX pitch and yaw. This jump is shown on oplev and OSEM plots.
    Reply  Thu Dec 9 11:13:37 2010, Osamu, Update, SUS,  jump_oplev_offset.png


    
        
            Quote:
        
        
            
            After Kiwamu had set the free swinging mode for ITMX and ETMX, I found a big jump of ITMX pitch and yaw. This jump
Entry  Thu Dec 9 01:54:15 2010, Jenne, Update, Electronics, Some Refl 11 fixes 
The Backstory:
Kevin was working on characterizing all of our RF photodiodes for the upgrade, and he discovered that REFL11 didn't work, as described in elog
3890.  Rana was working on fixing it, but then he went off to Japan.
Entry  Thu Dec 9 00:34:53 2010, Osamu, Update, SUS, ITMX oplev Pitch OLTF 2010128_01_ITMX_oplev_pit_oltf_fine.pdf2010128_01_ITMX_oplev_pit_oltf_fine.jpg
We measured Open loop TF for oplev pitch on ITMX.
Entry  Tue Dec 7 20:38:17 2010, kiwamu, Update, SUS, watchdogs off at ITMX and ETMX 
I am leaving ITMX and ETMX freely swinging, so that later I can take the spectra and diagonalize the input matrices.
Please don't restore the watchdogs until tomorrow morning.
    Reply  Wed Dec 8 12:47:18 2010, kiwamu, Update, SUS, diagonalisation of ITMX input matrix 
The input matrix of ITMX has been diagonalized.
The evaluation of this diagonalisation  will be done tonight by freely swinging ITMX again.
(Somehow I couldn't get any data for ETMX from the DAQ channels. I will try it again tonight.)
    Reply  Wed Dec 8 22:47:09 2010, kiwamu, Update, SUS, watchdogs off at ITMX and ETMX 
Tonight, swing again.
Please do not restore the watchdogs until tomorrow (Dec.9) morning.


    
        
            
Entry  Wed Dec 8 22:35:50 2010, kiwamu, Update, SUS, oplev installed on ITMX and ETMX 
The oplevs have been installed on ITMX and ETMX.
Now the oplev servos are running.
The lock of the green beam became more stable after the oplevs were
Entry  Wed Dec 8 17:05:39 2010, josephb, Update, CDS, Put in dolphin fiber between c1sus and c1lsc 
[josephb,Suresh]
We put in the fiber for use with the Dolphin reflected memory between c1sus and c1lsc (rack 1X4 to rack 1Y3).  I still need to setup the dolphin
hub in the 1X4 rack, but once that is done, we should be able to test the dolphin memory tomorrow.
Entry  Wed Dec 8 14:46:19 2010, josephb, kiwamu, Update, CDS, Why the ETMX daq channels were not recorded last night 
When adding the ETMX DAQ channels using the daqconfig gui (located in /opt/rtcds/caltech/c1/scripts/) on C1SCX.ini,
we forgot to set the acquire flag to 1 from 0.
So the frame builder was receiving the data, but not recording it.
Entry  Tue Dec 7 12:12:40 2010, kiwamu, Update, CDS, added some more DAQ channels 
[Joe and Kiwamu]
We added some more DAQ channels on c1sus.
We wanted to try diagonalizing the input matrices of the ITMX OSEMs because the motion of ITMX looked noisier than the others 
    Reply  Tue Dec 7 19:34:58 2010, kiwamu, Update, CDS, rebooted DAQ and all the front end machines 
I found that all the front end machine showed the red light indicators of DAQ on the XXX_GDS_TP.adl screens.

Also I could not get any data from both test points and DAQ channels.
Entry  Tue Dec 7 18:37:15 2010, Suresh, Update, SUS, ETMU05 ready for baking 
The ETMU05 has been removed from the suspension and put into the little foil house. 
Before removing it I checked the position and pitch of the optic with reference to the table top. 
The height:
Entry  Thu Oct 14 20:31:15 2010, yuta, Update, Computers, pyNDS installation 
EDIT by kiwamu Dec.7th ;

The Pynds package has been moved to the appropriate place:
    Reply  Tue Dec 7 17:19:33 2010, kiwamu, Update, Computers, pyNDS available 
I moved the Pynds package from
Yuta's local directory to the public place.
Entry  Tue Dec 7 16:09:53 2010, josephb, Update, CDS, c1iscex status 
I swapped out the IO chassis which could only handle 3 PCIe cards with the another chassis which has space for 17, but which previously had timing issues. 
A new cable going between the timing slave and the rear board seems to have fixed the timing issues. 
I'm hoping to get a replacement PCI extension board which can handle more than 3 cards this week from Rolf and then eventually put it in the Y-end
Entry  Mon Dec 6 23:33:15 2010, Jenne, Update, SUS, ETMU05 winched, balanced, glued!!!!!! StatusTable.png
[Suresh, Jenne]
We Finished!!!
ETMU05
(ETMY) had its wire winched to the correct height, was balanced,
Entry  Mon Dec 6 22:43:19 2010, Frank, Configuration, elog, elog restarted 
I restarted the elog because i changed the configuration for the cryo-elog.
Used the "start-elog.csh" script in /cvs/cds/caltech/elog/
Entry  Mon Dec 6 22:18:39 2010, kiwamu, Update, Green Locking, aligned the beam axis 
 [Suresh and Kiwamu]
We aligned the green beam to the X arm cavity more carefully.
Now the green beam is hitting the centers of ETMX, ITMX and BS.
Entry  Mon Dec 6 16:49:43 2010, josephb, Update, CDS, c1lsc halfway to working 
C1LSC Status:
The c1lsc computer is running Gentoo off of the fb server.
It has been connected to the DAQ network and is handling mx_streams properly (so we're not flooding the network error messages like we used to with c1iscex). 
It is using the old c1lsc ip address (192.168.113.62). It can ssh'd into.
Entry  Mon Dec 6 11:59:41 2010, josephb, Update, CDS, New c1lsc computer moved to lsc rack 
Computer moved:
The c1lsc computer has been moved over to the 1Y3
rack, just above the c1lsc IO chassis. 
 It will talking to the c1sus computer via a Dolphin PCIe reflected memory card.  The cards have been installed
Entry  Sun Dec 5 22:28:39 2010, rana, Summary, all down cond., power outage 
Looks like there was a power outage. The control room workstations were all off (except for op440m). Rosalba and the projector's
computer came back, but rossa and allegra are not lighting up their monitors.
linux1 and nodus and fb all appear to be on and answering their pings.
    Reply  Mon Dec 6 11:53:20 2010, josephb, kiwamu, Summary, all down cond., power outage 
The monitors for allegra and rossa's seemed to be in a weird state after the power outage.  I turned allegra and rossa on, but didn't see anything. 
However, I was after awhile able to ssh in.  Power cycling the monitors did apparently got them talking with the computers again and displaying.
I had to power cycle the c1sus and c1iscex machines (they probably booted faster than linux1 and the fb machines, and thus didn't see their root
    Reply  Mon Dec 6 11:57:21 2010, Koji, Summary, all down cond., power outage 
I checked the vacuum system and judged there is no apparent issue.
The chambers and annulus had been vented before the power failure.
So the matters are only on the TMPs.
Entry  Fri Dec 3 15:56:50 2010, Joonho, Jenne., Summary, Electronics, RF distribution unit plan RFsystem_plant_VISIO2.png
The last time(Moonday) Jenne and I worked on the RF distribution unit's structure.
We are making RF distribution unit for RF upgrade which is designed by Alberto.
 
Entry  Fri Dec 3 15:37:10 2010, josephb, Update, CDS, fb, front ends fixed - tested RFM between c1ioo and c1iscex 
Problem:
The front ends and fb computers were unresponsive this morning.
This was due to the fb machine having its ethernet cable plugged into the wrong input.   It should be
plugged into the port labeled 0.
Entry  Fri Dec 3 14:34:23 2010, rana, Update, CDS, fooling around in the FB rack 
This morning (~0100) I started to redo some of the wiring in the rack with the FB in it. This was in an effort to activate the new Megatron (Sun Fire
4600) which we got from Rolf.
Its sitting right above the Frame Builder (FB). The fibers in there are a rats nest. Someone needs to team up with Joe to neaten up the cabling
Entry  Fri Dec 3 05:21:11 2010, kiwamu, Update, Green Locking, locked the laser to the cavity 
I succeeded in locking the end green laser to X arm with the new ETM.
Though the lock is still not so stable compared to the previous locking with the old ETM. Also the beam centering
Entry  Wed Dec 1 02:39:00 2010, Suresh, Update, SUS, Installation of ETMU07 as ETMX 
[Kiwamu, Jenne, Koji, Suresh]
The following steps in this process were completed.
1)  Secured the current ETMX (Old ETMY) with the earth quake stops.
    Reply  Thu Dec 2 02:50:12 2010, kiwamu, Update, SUS, ETMX installed 
 [Suresh, Kiwamu]
 We finished the installation of ETMX into the chamber.
In order to clear the issue of the side OSEM, we put a spacer such that the OSEM can tilt itself and accommodate the magnet.
Entry  Thu Dec 2 00:34:32 2010, rana, HowTo, LSC, How Does Cavity Locking Work (answered by Nikon) 
https://nodus.ligo.caltech.edu:30889/gw.swf


Dr. Koji Arai and Nikon
Entry  Wed Dec 1 13:41:21 2010, josephb, alex, rolf, Update, CDS, Timing is back 
Problem:
We had timing problems across the front ends.
Solution:
Noticing that the 1PPS reference was not blinking on the Master Timing Distribution box.  It was supposed
to be getting a signal from the c0dcu1 VME crate computer, but this was not happening.
Entry  Wed Dec 1 12:02:49 2010, josephb, alex, Update, CDS, Rebuilding frame builder with latest code 
Problem:
The front ends seem to have different gps timestamps on the data than the frame builder has when receiving them.
One theory is we have fairly been doing SVN checkouts of the code for the front ends once a week or every two weeks, but the frame builder has
Entry  Tue Nov 30 19:35:09 2010, Zach, Update, elog, restarted again 
 Restarted the elog again, this time using .../elog/start-elog.csh, which Joe pointed out works just fine. I have amended the wiki
instructions to point to this script, instead.
Entry  Tue Nov 30 18:15:52 2010, Jenne, Update, SUS, ETMX ready to be installed. ETMY ready for winching StatusTable.png
[Jenne, Kiwamu]
We put ETMX back in its tower, and confirmed its balance.  It might be pointing a teensy bit upward, but it is way less than the DC pointing
offset we see when we put the OSEMs in the towers (since the PDs and LEDs have some magnetic bits to them).
Entry  Tue Nov 30 16:02:18 2010, josephb, Update, CDS, status 
Issues:
1) Turns out the /opt/rtcds/caltech/c1/target/gds/param/testpoint.par file had been emptied or deleted
at one point, and the only entry in it was c1pem.  This had been causing us a lack of test points for the last few days.  It is unclear when
or how this happened.  The file has been fixed to include all the front end models again.  
Entry  Tue Nov 30 14:21:21 2010, Zach, Update, elog, Script unnecessary 
I didn't realize that the script in .../elog was configured to start 2.8.0 already. I will revert the instructions on the wiki to point to that 
one.
Entry  Tue Nov 30 12:45:36 2010, kiwamu, Update, SUS, found a loose connection : ITMX damping 
 Last night I found that the response of ITMX against the angle offsets were strage.
Eventually I found a loose connection at the feedthrough connectors of ITMX chamber.
ELOG V3.1.3-