  11399   Thu Jul 9 16:39:03 2015 KojiConfigurationGeneralHow to set up your own summary page environment on the LDG clusterHere is the summary of my investigation
how to set up my own "summary page"
environment on the LDG (LIGO Data Grid) cluster.
  
  11398   Thu Jul 9 13:26:47 2015 JamieSummaryCDSCDS upgrade: new mx 1.2.16 installedI rebuilt/installed mx 1.2.16 to use "ether-mode",
instead of the default MX-10G:


controls@fb
  
  11397   Wed Jul 8 21:02:02 2015 JamieSummaryCDSCDS upgrade: another step forward, so we're back to where we started (plus a bit?)Koji did a bit of googling to determine
that 'Wrong Network' status message
could be explained by the fb myrinet 
  
  11396   Wed Jul 8 20:37:02 2015 JamieSummaryCDSCDS upgrade: one step forward, two steps backAfter determining yesterday that all the
daqd issues were coming from the frame writing,
I started to dig into it more today. 
  
  11395   Wed Jul 8 17:46:20 2015 JessicaSummaryGeneralUpdated Time Delay PlotsI re-measured the transfer function for
Cable B, because the residuals in my previous
post for cable B indicated a bad fit. 
 resid_CableA.pngresid_CableB.png 
  11394   Tue Jul 7 23:26:19 2015 KojiUpdateCDSAttempt to list CDS issuesAs Jamie succeded to realize somewhat workable
condition of the 40m CDS, I tried to list
the obvious CDS issues so that we can attack
 burt.log.zip 
  11393   Tue Jul 7 18:27:54 2015 JamieSummaryCDSCDS upgrade: progress!After a couple of days of struggle, I made
some progress on the CDS upgrade today:

 2.9-RTS-OK.pngC1X04_GDS_TP.png 
  11392   Tue Jul 7 17:22:16 2015 JessicaSummary Time Delay in ALS CablesI measured the transfer functions in the
delay line cables, and then calculated the
time delay from that.
 cableA_fit.jpgcableA_resid.jpgcableB_fit.jpgcableB_resid.jpg 
  11391   Sun Jul 5 18:14:13 2015 IgnacioUpdatePEMWilcoxon Accelerometer Huddle TestUpdated: On Thursday/Friday (sorry
for late elog) I was messing with Eric's
Wilcoxon 731A accelerometer huddle test data
 8x 
  11390   Wed Jul 1 19:16:21 2015 JamieSummaryCDSCDS upgrade in progressThe CDS upgrade is now underway

Here's
what's happened so far:


Installed and linked in
  
  11389   Wed Jul 1 16:16:46 2015 IgnacioUpdateGeneralAccelerometers reinstalled for future huddle testToday, I installed the Wilcoxon accelerometers
in the table near the end of the mode cleaner.
I only set three of them up instead of all
 9x 
  11388   Wed Jul 1 11:45:48 2015 SteveUpdatePEMcleaning around ETMX chamber


  
  11387   Wed Jul 1 10:01:25 2015 SteveUpdateVACRGA scan pd78 day 275 

 
 rga275d.png 
  11386   Wed Jul 1 09:33:31 2015 KojiUpdateGeneralShutters closed, watch dogs disabled for the RCG upgradeI closed the PSL/GREEN shutters and shut
off the LSC feedback/SUS watch dogs at 9AM
PDT, to allow Jamie to start his disruptive
  
  11385   Tue Jun 30 20:26:24 2015 Eve UpdateGeneralMinor Summary Page ChangesI made several small, nit-picky changes
to the summary pages.

 
  
  11384   Tue Jun 30 11:33:00 2015 JamieSummaryCDSprepping for CDS upgradeThis is going to be a big one.  We're
at version 2.5 and we're going to go
to 2.9.3.
  
  11383   Tue Jun 30 05:47:38 2015 ranaUpdateLSCUse BALUNs


  
  11382   Mon Jun 29 17:40:56 2015 Max IsiUpdateGeneralSummary pages "Code status" page fixedIt was brought to my attention that the
"Code status" page (https://nodus.ligo.caltech.edu:30889/detcharsummary/status.html)
had been stuck showing "Unknown status"
  
  11381   Mon Jun 29 12:28:45 2015 ericqUpdateLSCALS reconstruction in progressTurns out the reason that the BEATY signal
wasn't working is that one of the two
RF amplifiers (both of which are model ZHL-32A),
  
  11380   Fri Jun 26 23:18:52 2015 Eve ChaseUpdateCDSSummary Page UpdatesMotivation:

My SURF project largely focuses
on updating and improving the 40m summary
  
  11379   Fri Jun 26 03:24:18 2015 ericqUpdateLSCALS reconstruction in progressToo sleepy to make full ELOG. Stay tuned. 

Two 25dB amplifiers (with fins!)
are living in the top shelf on the PSL table,
  
  11378   Thu Jun 25 18:20:15 2015 ericqUpdateLSCALS reconstruction in progressI've been working on getting a working
ALS up and running. Things are in a bit of
a transient state right now; I'm off
  
  11377   Thu Jun 25 15:07:50 2015 SteveUpdatesafetySurfs Safety 2015Jessica Pena, Megan Kelly, Eve Chase and
Ignacio Magana received 40m specific basic
safety traning today.
 surfs2015.jpg 
  11376   Thu Jun 25 14:18:46 2015 Max IsiUpdateGeneralSummary page statusThe pages are live again. Please allow
some time for the system to catch up and
process missed days. If there are any
  
  11375   Thu Jun 25 12:03:42 2015 Max IsiUpdateGeneralSummary page statusThe summary pages have been down due to
incompatibilities with a software update
and problems with the LDAS cluster. I'm
  
  11374   Wed Jun 24 17:30:45 2015 ericqUpdateLSCDFD Delay lengthThis afternoon, I had a fruitful conversation
with Rich Abbott about various kinds of cables.

I've sent an email to Steve
  
  11373   Wed Jun 24 08:05:43 2015 SteveUpdatePSLlaser turned onThe laser went off around 11am yesterday.
It was turned on
 laserWasOff.png 
  11372   Tue Jun 23 11:18:20 2015 SteveUpdatePEMcleaning around chambersKeven is our regular janitor is out for
a few weeks.

The sub is careful- gentel Mario.
  
  11371   Mon Jun 22 20:59:19 2015 ericqUpdateLSCDFD Delay lengthI've been thinking a bit about what
the ideal cable length / delay time for the
upgraded ALS beatbox should be. Here are
  
  11370   Mon Jun 22 14:53:37 2015 ranaSummaryLSCX/Y green beat mode overlap measurement redone
Why is there a factor of 20 power
difference? Some of it is the IR laser power
difference, but I thought that was just a
  
  11369   Mon Jun 22 14:21:42 2015 SteveMetaphysicsTreasureJenne and Den graduatedLast supper before departing at  "Grazie"
El Portal. All the best on your journey!
 ls.jpg 
  11368   Mon Jun 22 12:57:09 2015 ericqSummaryLSCX/Y green beat mode overlap measurement redoneI took measurements at the green beat setup
on the PSL table, and found that our power
/ mode overlap situation is still consistent
  
  11367   Sun Jun 21 13:21:03 2015 ranaUpdatePEMWilcoxon Accelerometer Huddle TestTo improve our sensor
noise estimate, the ACC cables should
be clamped using a rubber pad and a big dog
  
  11366   Fri Jun 19 16:54:20 2015 JenneUpdateComputer Scripts / ProgramsWiener scripts in scripts directoryI have put the Wiener filter scripts into 
/opt/rtcds/caltech/c1/scripts/Wiener/ 
  
  11365   Fri Jun 19 03:00:56 2015 ericqUpdateCDSLibrary Model Parts examinedAll simulink diagrams being used at the
40m are now under version control. I have
compiled, installed, and restarted all current
  
  11364   Fri Jun 19 01:55:35 2015 ericqUpdateGreen LockingBeatBox Assay: not looking good


  
  11363   Fri Jun 19 01:24:26 2015 rana, kojiUpdateGreen LockingBeatBox Assay: not looking goodWe had decided a few days ago, to bypass
the IF part of the BeatBox board and put
some of the Haixing Maglev generic filter
  
  11362   Wed Jun 17 15:31:50 2015 ericqUpdatePEMAccelerometers fully installedMC1 accelerometer has been plugged in.
The modecleaner locking has been intermittent
today, but I looked at a 15 minute lock in
 IMCcoherence_Jun172015.xml.zipIMCcoherence.png 
  11361   Mon Jun 15 22:36:40 2015 rana, kojiUpdateGreen LockingBeatBox Assay: not looking goodBecause the ALS beatbox schematic is out-of-date
and misleading, we pulled the box to photograph
the current implementation and figure out
  
  11360   Mon Jun 15 20:36:48 2015 ranaUpdateIOOIOO QPDs centredafter re-aligning the beam into the PMC,
I touched up the steering mirros into the
IOO QPDs so that the beams are now centered
 Untitled.png 
  11359   Mon Jun 15 16:55:39 2015 ericqUpdatePEMAccelerometers installedThe accelerometers have been installed
at MC1 and MC2. MC2 data is live, I haven't
yet run the cables from the MC1 set to the
 MC2.jpgMC1.jpgmc2accspectra.png 
  11358   Mon Jun 15 11:54:44 2015 ericqUpdateCDSParts not in SVNI ran the following command to find which
models/parts are not under version control,
or have modifications not commited:
  
  11357   Sat Jun 13 23:52:14 2015 ericqUpdateLSCBeatbox needs whitening gainNice find!

We ought to use our noise model
of the ALS signal chain to determine what
  
  11356   Sat Jun 13 18:37:46 2015 ericqUpdateLSCBeatbox needs whitening gainHere are the promised details!

I was worried about the lack of
whitening gain, as I saw that the DC phase
 ADCdiagnosis.png 
  11355   Fri Jun 12 17:09:58 2015 ericqUpdateLSCBeatbox needs whitening gainShort entry just to preview a new development;
more detail about this investigation will
soon follow. 
 beatGain.png 
  11354   Fri Jun 12 08:40:17 2015 SteveUpdateVACVacuum comp. rebootedKoji and Steve,

One computer expert and one vacuum
expert required.
 vacMonNoGauges.pngprepReboot.png 
  11353   Thu Jun 11 19:40:59 2015 KojiUpdateVACVacuum comp. rebootedThe serial connections to the vacuum gauges
were recovered by rebooting c1vac1 and c1vac2.

Steve claimed that the vacuum screen
  
  11352   Wed Jun 10 15:54:14 2015 SteveUpdateVACVacuum comp. rebootedKoji and Steve succeded rebooting C1vac1,
C1vac2 and pressure reading is working now

More tomorrow .........
 afterReb061015.png 
  11351   Wed Jun 10 03:19:58 2015 ericqUpdateLSCAUX PDH error measured in CDSLooking over the old noise budget in the
green locking paper, it seems the main technical
noise sources were the AUX PDH error and
 AUXspectra.png 
  11350   Wed Jun 10 02:50:39 2015 ericqUpdatePEMWilcoxon Accelerometer Huddle TestHere are some results for the 3-corner
hat subtraction for the six accelerometers,
from ~1 hour of data that didn't
 hats2Acc.png3hatcode.zip 