Entry  Tue Jan 11 21:08:19 2011, Joonho, Summary, Cameras, CCD cables upgrade plan. CCD_Cable_Upgrade_Plan_Jan11_2011.pdf
Today I have made the CCD Cable Upgrade Plan for improvement of sysmtem.
I have ~60 VIDEO cables to be worked for upgrades so I would like to
ask all of your favor in helping me of replacing cables.
Entry  Tue Jan 11 17:08:43 2011, Suresh, Configuration, PSL, replaced the pzt-steering mirror on PSL 
[Rana, Jenne, Suresh]
Yesterday, We replaced the existing beam steering mirror and the PZT it was mounted on with a Gooch and Housego
mirror (20ppm transmission at < 30deg incidence @1064nm) and a Polaris-K
Entry  Tue Jan 11 16:04:17 2011, josephb, Update, CDS, Script to update web views of models for all installed front ends 
I wrote a new script that is in /opt/rtcds/caltech/c1/scripts/AutoUpdate/ called  webview_simlink_update.m. 
This m-file when run in matlab will go to the /opt/rtcds/caltech/c1/target directory and for each c1 front end,
generate the corresponding webview files for that system and place them in the AutoUpdate directory.  
Entry  Tue Jan 11 14:05:11 2011, josephb, Update, Computers, Martian host table updated daily 
I created two simple cron jobs, one running on linux1 and one running on nodus, to produce an updated copy of the martian host table linkable from the
wiki every day.
The scripts live in /opt/rtcds/caltech/c1/scripts/AutoUpdate/.  One is called  updateHostTable.cron and run on linux1 everyday at 4 am,
Entry  Tue Jan 11 11:39:45 2011, steve, Update, VAC, RGA is turned on pd70d22.jpg
Joe updated the rga procedure in the wiki and we turned on the filament. It will take a few days to reach thermal equilibrium.
TP2 dry fore pump was replaced at 910mTorr
Entry  Tue Jan 11 11:19:13 2011, josephb, Summary, CDS, Storing FE harddrives down Y arm 
Lacking a better place, I've chosen the cabinet down the Y arm which had ethernet cables and various VME cards as a
location to store some spare CDS computer equipment, such as harddrives.  I've added (or will add in 5 minutes) a label "FE COMPUTER HARD DRIVES"
to this cabinet.
Entry  Mon Jan 10 16:47:08 2011, josephb, alex, rolf, Update, CDS, Fixed c1lsc dolphin reflected memory 
While Alex and Rolf were visiting, I pointed out that the Dolphin card was not sending any data, not even a time stamp, from the c1lsc machine.
After some poking around, we realized the IOP (input/output processor) was coming up before the Dolphin driver had even finished loading. 
We uncommented the line
Entry  Mon Jan 10 16:39:36 2011, josephb, alex, rolf, Update, CDS, New Time server for frame builder and 1PPS 
Alex and Rolf came over today with a Tempus LX  GPS network timing server.  This has an IRIG-B output and a 1PPS output.  It can also
be setup to act as an NTP server (although we did not set that up).
This was placed at waist height in the 1X7 rack.  We took the cable running to the presumably roof mounted antenna from the VME timing board
Entry  Sun Jan 9 15:50:55 2011, rana, HowTo, PSL, Setting the PMC gain Untitled.png

I ramped the PMC gain slider to find where it oscillates. It starts going bad at ~13 dB, so the new default
Entry  Sat Jan 8 23:18:03 2011, rana, Update, Computers, network table 
There's, as usual, a disconnect between the real martian host table and the one displayed on the
Wiki. Basically, the point is: DO NOT TRUST THE WIKI, because people who update the actual host table only randomly update the wiki table.
The only thing worth trusting is the file
Entry  Wed Dec 8 12:26:56 2010, josephb, Update, CDS, megatron set up - as a test front end 
[josephb, Osamu]
Megatron Setup:
To show Osamu how to setup a a front end as
well as provide a test computer for Osamu's use, we used the new megatron (sunfire x4600 with 16 cores and 8 gigabytes of memory) as a front end without
    Reply  Sat Jan 8 21:12:12 2011, rana, Update, CDS, Megatron is back megatron.jpgsysinfo.text
 I started reverting Megatron into a standard Ubuntu workstation after Joe/Osamu's attempt to steal it for their real time mumbo jumbo.
First, I installed a hard drive that was sitting around on top of it. That whole area is still a mess; I'm not surprised that we have so many CDS
problems in such a chaotic state. There's another drive sitting around there called 'RT Linux' which I didn't use yet.
Entry  Fri Jan 7 15:17:37 2011, steve, Update, Cameras, ITMX video monitor has tower wide view 
The Watec 902, 1/2" CCD camera got new Tamron lens: 1/2" 10-40mm F/1.4  manual iris. IR corrective lens. It is designed to have the same
focal point in the IR as
in the visible light range. However, as the depth of field in the IR range is very narrow, focus adjustment should be done carefully in the IR.
Entry  Fri Jan 7 12:01:39 2011, Osamu, Update, Computers, c1lsc running 
I got a new adapter board for expansion chassis from CDS and exchanged the existing adapter board which was laid on the floor around ETMX to new one.
Then I connected the chassis to c1lcs,  c1lsc seems to be running now. I will return the old board to CDS since Rolf says he wants to return
it to manufacture.
Entry  Fri Jan 7 00:49:16 2011, Jenne, Update, Green Locking, Recovered Xarm Green Lock, Preparation for Beat Note Measurement 
[Kiwamu, Jenne]
We went this evening in search of a beat note signal between the Xarm transmitted green light and the PSL doubled green light. 
First, we removed our new ETMX camera (we left the mount so it should be easy to put back) from the other day.   We left the test masses
Entry  Fri Jan 7 00:14:36 2011, kiwamu, Update, IOO, EOM triple resonant box is working 
 I checked the triple resonant box for the broadband EOM this afternoon,
and found it was healthy.
So I installed it again together with a power combiner and succeeded in
Entry  Sat Dec 18 06:24:49 2010, rana, Update, elog, restarted 
The process was taking up 100% of the CPU and not responding via web. The .log file showed the last action was somebody reading/editing one of Jenne's
entries from August regarding TT ECD. The restart script didn't work, so I had to do a 'kill -9' to get it to die.
    Reply  Sat Dec 18 23:33:06 2010, Koji, Update, elog, restarted 
Did the same.


    
        
            Quote:
        
        
            
       Reply  Sun Dec 19 11:19:42 2010, Koji, Update, elog, restarted 
Did it again. It seemed that Google bot came to the elog and tried to obtain  "http://nodus.ligo.caltech.edu:8080/robots.txt". That was the
last of the log.
Bot came from the AJW's homepage. Also Google FeedFecther came to the elog.
          Reply  Sun Dec 19 22:45:28 2010, rana, Update, elog, restarted 
I deleted the yellow box which showed up by default when making an elog entry. Would be nice if we could make it so that you have to click a button to
'opt-in' for the yellow box rather than get it by default.
I added a 'robots.txt' file to the /users/public_html/ area using Google's
          Reply  Wed Jan 5 10:45:51 2011, Koji, Update, elog, restarted 
Google bot  crashed the elog again. Then, I found that Google bot (and I) can crash elogd by trying to show the threaded view.
There looks similar issue reported to the elog forum, the author did not think this is a true bag.
Note: This happens only for the 40m elog. The other elogs (ATF/PSL/TCS/SUS/Cryo) are OK for the threaded view.
             Reply  Thu Jan 6 10:47:11 2011, Koji, Update, elog, ELOG fixed (re: restarted) 
Fixed the 40m elog crashing with the threaded display.
This morning I found that Google
bot crashed the elog again. I started the investigation and found the threaded mode is fine if we use the recent 10 entries.
I gradually copied the old entries to a temporary elog and found that a deleted elog entry on August 6 had a corrupted remnant in the elog file.
Entry  Wed Jan 5 23:22:00 2011, Jenne, Update, Cameras, Aligned the Xarm, no big deal DSC_2822.JPGKiwamuJenne_5Jan2011_Xarm_Aligned.png
[Kiwamu, Jenne]
We successfully aligned the X arm.  No big deal.  Nothing to write in giant 
    Reply  Wed Jan 5 23:37:12 2011, rana, Update, Cameras, Aligned the Xarm, no big deal 
Pretty fancy work actually...I wouldn't have guessed that you need to look at the back of the ETM. Does this mean that we can't see the flashes
from inside the arm cavity? If so, its a pretty remarkeable statement about the wide angle scatter of the new mirrors. Do we really have 1W going into
the MC?
       Reply  Wed Jan 5 23:45:33 2011, Jenne, Update, Cameras, Aligned the Xarm, no big deal 
Correct.  We can see the flashes clearly on our new ETM camera, but we see absolutely nothing on the ITM.
Unfortunately, the camera is in the path of the green beam, so we'll have to figure out a more permanent plan.  Right now the laser at the
end is shuttered.
          Reply  Thu Jan 6 00:03:05 2011, Koji, Update, Cameras, Aligned the Xarm, no big deal 
Nice, nice! 
The power budget for the FPMI is here. The expected Intracavity
power and the transmission are at  most ~8W and 100uW, respectively.
          Reply  Thu Jan 6 00:06:01 2011, Jenne, Update, IOO, Magical absorbing PZT mirror 
[Kiwamu, Jenne]
We have a measely 465mW going into the MC.  We lose a
boatload of power on the PZT mirror that is part of the last zigzag for steering into the MC.  Just before this mirror, we measure 1.21W . 
Entry  Wed Jan 5 00:23:30 2011, rana, Summary, DAQ, FrameBuilder fails in a new way 
Since Leo was trying to demo his LIGO Data Listener code, he noticed that there was and NDS2 issue. The NDS2 guy (JZ) noticed that the FrameBuilder had
an issue.
We investigated. At 4PM on Dec 31, the GPS timestamp of the frame file names started to be recorded wrong.
    Reply  Wed Jan 5 16:00:11 2011, rana, alex, Summary, DAQ, FrameBuilder fails in a new way 
Email from Alex:
Turned out to be the lack of current year information in the IRIG-B
signal
       Reply  Wed Jan 5 22:14:41 2011, rana, Summary, DAQ, FrameBuilder fails in a new way Screen_shot_2011-01-05_at_10.13.21_PM.png
Just a proof that the DAQ is working - ran DTT on nodus from 3 hours ago.
Entry  Wed Jan 5 21:19:29 2011, Zach, Update, elog, restarted 
 Restarted the elog with the script
Entry  Tue Jan 4 21:21:57 2011, kiwamu, Update, IOO, PZTs are connected to c1iscaux Screenshot20110104.png
I connected PZT1 and PZT2 to a slow front end machine c1iscaux. 
Now we are able to align these PZTs from the control room via epics.
    Reply  Wed Jan 5 16:11:17 2011, kiwamu, Summary, IOO, temporary PZT connection PZTconnection.png

This is a connection diagram for the input PZTs (i.e. PZT1 and PZT2).
Entry  Tue Jan 4 02:58:53 2011, Jenne, Update, IOO, Power into Mode Cleaner increased 
What was the point:
I twiddled with several different things this evening to increase the power
into the Mode Cleaner.  The goal was to have enough power to be able to see the arm cavity flashes
    Reply  Tue Jan 4 11:06:32 2011, Koji, Update, IOO, Power into Mode Cleaner increased 
- Previously MC TRANS was 9000~10000 when the alignment was good. This means that the MC TRANS PD is saturated if the full power is given. 
==> Transimpedance must be changed again.
- Y1-45S has 4% of transmission. Definitively we like to use Y1-0 or anything else. There must be the replaced mirror. 
       Reply  Tue Jan 4 13:57:48 2011, kiwamu, Update, IOO, incident mirror changed from 45deg to 0 deg 
I replaced the final steering mirror (Y1-1037-45-S) in the zig-zag path on the PSL table by a 0 deg mirror Y1-1037-0.
With a sensor card I confirmed the transmission reduced a lot after the replacement.
          Reply  Wed Jan 5 03:06:02 2011, kiwamu, Update, IOO, beam spots on MC mirrors 
I checked the spot positions on MC1 and MC3 by running Yuta's A2L script.
The amounts of the off-centering were good except for YAW of MC1.
 So we have to adjust the YAW alignment of the beam
       Reply  Tue Jan 4 18:37:18 2011, Jenne, Update, IOO, MCWFS aligned 
I undid Yuta's temporary setup, and put beam back on both
WFS.   Since Koji had just aligned the Mode Cleaner, I centered the beam on the  WFS using the WFS QPD screen, while watching the WFS Head
screen, to  make sure that the beam was actually hitting the QPD, and not off in  lala land.  
Entry  Tue Jan 4 15:12:33 2011, Suresh, Update, IOO, MC Trans Mon QPD gain decreased by 10 
 Decreased the gain of MC-Trans-Mon QPD ckt
The resistors R1, R2, R3, R4 are now 49.9 kOhm. The previous elog on this
subject 3882 has the ckt details.  
Entry  Wed Dec 29 18:53:11 2010, rana, Summary, elog, found hung - restarted 
This was the error today:
GET /40m/ HTTP/1.1
Host: nodus.ligo.caltech.edu:8080
    Reply  Mon Jan 3 10:32:27 2011, kiwamu, Summary, elog, found hung - restarted 
Found exactly the same error messages at the end of the log file.


    
        
            Quote: #4098
        
        
            
Entry  Wed Dec 8 14:51:09 2010, josephb, Update, CDS, c1pem now recording data 
Problem:
c1pem model was reporting all zeros for all the PEM channels.
Solution:
Two fold.  On the software end, I added ADCs
0, 1, and 2 to the model.  ADC 3 was already present and is the actual ADC taking in PEM information.
    Reply  Sat Jan 1 19:13:40 2011, rana, Update, CDS, c1pem now recording data Untitled.png
 I found that there was no PEM data nor any other data (no SUS or otherwise. No testpoints, no DAQ).
I went through the procedure that Jenne has detailed in
the Wiki but it didn't work.
Entry  Sat Jan 1 16:36:16 2011, rana, Configuration, SUS, rampdown.pl was not running 
The crontab for op340m which runs various IFO maintenance activities has been set to the wrong path for the watchdog
rampdown script since the CDS changeover.
This is a dangerous situation. With the watchdog thresholds
Entry  Thu Dec 23 22:13:50 2010, Koji, Update, General, PZT HV turned on 
The four IOO PZTs have been turned on in order to confirm the alignment of the IFO.
Once they are turned on, the spots (ITMX/ITMY/PRM/SRM) on the REFL CCD have been easily found.
When the X-arm was aligned to the green beam, it is easily locked to TEM00. Also some LG modes were visible. 
    Reply  Fri Dec 31 12:41:02 2010, rana, Update, General, IR flashes Untitled.png
I came in today to check up on the StripTool and burn the Ubuntu LTS (new CDS OS) DVD. I was pretty excited to see the PRM flashes on Mon1.
I waggled the PRM/BS alignments and got a good contrast MICH and then bright flashes in the PRM that totally overload Mon1's CCD.
Now I can see flashes of some IR
Entry  Fri Dec 24 09:01:33 2010, josephb, Update, CDS, Borrowed ADC 
Osamu has borrowed an ADC card from the LSC IO chassis (which currently has a flaky generation 2 Host interface board).  He has used it to get his
temporary Dell test stand running daqd successfully as of yesterday.
This is mostly a note to myself so I remember this in the new year, assuming Osamu hasn't replaced the evidence by January 7th.
Entry  Thu Dec 23 12:19:43 2010, kiwamu, Update, Green Locking, installed doubling oven base at PSL table DSC_2820_ss.jpgDSC_2814_ss.jpgDSC_2815_ss.jpg
I gave a christmas present to a doubling oven who has been sitting on the PSL table.
The below is a picture of the present I gave. It's a base plate for the doubling oven, made from a block of aluminum, and black-anodized.
The size and the shape are nicely tailored for the combination of the Newfocus kinematic mount and the Covesion oven.
    Reply  Thu Dec 23 18:51:37 2010, rana, Update, Green Locking, installed doubling oven base at PSL table 
This is not such a bad base design, but remember that we have to get a couple of parts with the purple anodize
to see if there is a difference between black and purple in terms of the 532 nm reflectivity.
Entry  Wed Dec 22 17:24:50 2010, steve, Configuration, VAC, slow pumpdown at 12 hours slowpd12h.jpg
We have reached 200 Torr at 12 hours of slow pumping speed. Kiwamu stopped the pumping for 11 hrs last night .and I restarted it this morning.
Now RV1 is fully open with butterfly valve in place  and the second roughing  pump RP3 was just turned on.
 
    Reply  Wed Dec 22 21:38:47 2010, kiwamu, Configuration, VAC, Re:slow pumpdown at 12 hours 
I stopped the pumping at 9:30 pm. Now we are at 29 torr.


    
        
            Quote: from  #4089
        
        
            
    Reply  Thu Dec 23 13:30:09 2010, steve, Configuration, VAC, slow pumpdown complete slow2dpd.jpg
The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr
The Maglev monitoring MEDM screen "Rotating" indicator is not
working. It is on all times. Please look at Maglev controller monitor for real information.
Entry  Thu Dec 23 08:54:32 2010, Suresh, Update, elog, the delhi univ syndrome 
Sorry folks!  I couldnt get to the elog and didnt know that the elog was crashing every time I tried to access it. 
But have found other means to access it and the elog is safe for now!
Entry  Tue Dec 21 08:26:08 2010, rana, Update, elog, elogd is getting killed by Suresh 
Suresh killed the elogd again from India. This was the log file:
Accept-Charset: ISO-8859-1,utf-8;q=0.7,*;q=0.7
Keep-Alive: 115
    Reply  Wed Dec 22 06:50:19 2010, rana, Update, elog, elogd is getting killed by Suresh 
After another elog crash, I've blacklisted the domain that Suresh is using by editing the apache httpd.conf. Let's see what happens now.
       Reply  Thu Dec 23 03:15:11 2010, Koji, Update, elog, elogd is getting killed by Suresh 
ELOG has crashed and I restarted it.
Actually the filtering is not effective so far as elog is not using apache but has its own web server inside.
So this just block the access to port 30889 (=SVN, Dokuwiki, etc).
Entry  Wed Dec 22 15:47:22 2010, Koji, Update, VAC, Tank closing procedure 
[Jenne Kiwamu Joe Osamu Steve Koji]
Yesterday (21st), we closed the BSC and the four testmass chambers.
We splitted the team into three.
Entry  Wed Dec 22 15:30:47 2010, Osamu, Update, ASC, ETMY oplev fixed 
According to c1scy.mdl, OL signals should be connected to adc_0_24 to adc_0_27 but they were connected to adc_0_16 to adc_0_19 which are assigned to
QPD signals.
Actually cable connections were messed up. One ribbon cable was connected from QPD driver and ADC ports assigned for OL, and another ribbon cable
Entry  Wed Dec 22 11:24:23 2010, haixing, Update, SUS, measurement of imbalance in quadrant maglev protope config_2x2.png
Yesterday, a sequence of force and gain measurement was made to determine the imbalance in the
quadrant, magnetic-levitation prototype. This was the reason why it failed to achieve a stable levitation.
The configuration is shown schematically by the figure below:
Entry  Tue Dec 21 16:34:42 2010, kiwamu, Summary, VAC, All the test masses have been wiped 
 [Jenne and Kiwamu]
 We wiped all the test masses with isopropyl alcohol.
They became apparently much cleaner.
(how to)
Entry  Tue Dec 21 16:20:09 2010, steve, Configuration, VAC, pumpdown has started 
Slow pumpdown of rebuilt IFO-mark4 started
at 3pm today.
We are at 680Torr at this minute with 1.5 Torr/min speed.
Entry  Tue Dec 21 11:52:58 2010, josephb, Update, Computers, RGA scripts fixed, c0rga fixed 
c0rga apparently had a full hard drive.  There was 1 Gig log file in /var/log directory, called Xorg.0.log.old which I deleted which freed up about
20% of the hard drive.  This let me then modify the crontab file (which previously had been complaining about no room on disk to make edits).
I updated the crontab to look at the new scripts location, updated the RGA script itself to write to the new log location, and then created a soft
Entry  Mon Dec 20 10:47:29 2010, Koji, Update, IOO, Plan for closing the vacuum chambers 
Monday

    Place the bars on the in-vac tables to mark the positions of the test mass suspensions. (ITMX/ITMY/ETMX/ETMY)
    Check the table leveling again (ITMX/ITMY/ETMX/ETMY/BSC)
    Reply  Mon Dec 20 16:57:58 2010, steve, Update, IOO, checking out & closing the vacuum chambers 

    Check EQ-stops

   clamp down counter weights

   check other components are clamped
       Reply  Mon Dec 20 23:32:58 2010, kiwamu, Update, IOO, Re:checking out & closing the vacuum chambers 
 
    Reply  Mon Dec 20 22:56:20 2010, Jenne, Update, IOO, Plan for closing the vacuum chambers 
Tuesday 

    If still everythig is fine, put the BS heavy door.

- Do the following list for all of the testmass chambers.

    Check if the OSEMs and the OPLEV are still fine. (ITMX and ITMY were not done on Monday, so need extra care.)
    Inspect
Entry  Mon Dec 20 23:10:25 2010, Jenne, Update, SUS, Pretty much ready for pump-down. A few final things.... 
[Kiwamu, Jenne, Koji, Osamu]
We have mostly prepared the IFO for pump down. 
After lunch [Steve, Bob, Koji, Kiwamu, Jenne, Joe, Joon Ho, Vladimir, Osamu] put the access connector
Entry  Thu Dec 16 15:10:18 2010, josephb, kiwamu, Update, CDS, ETMY working at the expense of ETMX 
I acquired a second full pair of Host interface board cards (one for the computer and one for the chassis) from Rolf
(again, 2nd generation - the bad kind).
However, they exhibited the same symptoms as the first one that I was given.  
    Reply  Fri Dec 17 02:22:06 2010, kiwamu, Update, CDS, ETMY damping: not good 
  I made some efforts in order to damp ETMY, however it still doesn't happily
work.
 It looks like something wrong is going on around the whitening filters and the AA filter borad.
       Reply  Mon Dec 20 10:06:36 2010, kiwamu, Update, CDS, ETMY damped 2010Dec18.png
  Last Saturday I succeeded in damping the ETMY suspension eventually. 
Entry  Fri Dec 17 00:55:30 2010, Koji, Update, IOO, The dark port beams reached the AP table 
[Koji and Kiwamu]
We obtained two dark port beams on the AP table: OMC REFL and AS
- First, IPANG and BS were aligned so as to have the beams on the center of the ETMs.
    Reply  Sat Dec 18 01:17:04 2010, kiwamu, Update, IOO, some more alignments 
 [Koji and Kiwamu]
 We did some more vacuum works today. It is getting ready to pump down.
 (what we did) 
Entry  Fri Dec 17 00:30:05 2010, Koji, Update, IOO, ITMY / SRM / BS / PRM OPLEVs aligned 
[Steve and Koji]
The invac OPLEV mirrros were aligned before we get to the PMA party.
The OPLEV mirrors were adjusted in accordance with the optical layout.
    Reply  Fri Dec 17 03:37:47 2010, rana, Update, SUS, ITMY / SRM / BS / PRM OPLEVs aligned 


    
        
            Quote:
        
        
            
            The sole thing that has been deviated from the optical layout was that the SRM returning beam had to be reroute 
Entry  Thu Dec 16 10:52:42 2010, josephb, Update, Cameras, New PoE digital cameras basler.jpg
We have two new Basler acA640-100gm cameras.  These are power over ethernet (PoE) and very tiny.
Entry  Thu Dec 9 23:17:47 2010, kiwamu, Update, SUS, beam pointing has been done 
[Koji, Osamu and Kiwamu]
 We aligned the beam axis pointing down to both X and Y arm.
Now the beams are hitting the centers of both ETMX and ETMY.
    Reply  Fri Dec 10 09:58:57 2010, Aidan, Update, SUS, beam pointing has been done 
Good news. I feel multi-chromatic-locking success is just around the corner.
By the way, there's a new presentation on the DCC from the ANU group where they've locked a short single cavity with both colors - G1000735:
https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=14040
       Reply  Sat Dec 11 00:41:55 2010, kiwamu, Update, IOO, alignment of IP_ANG is done 
  [Jenne, Koji and Kiwamu]
 We finished a coarse alignment of IP_ANG.
 The beam for IP_ANG successfully reached to the ETMY chamber
          Reply  Tue Dec 14 01:04:23 2010, kiwamu, Update, SUS, alignment of ITMs and PRM done 
   The alignment of the ITMs and the
PRM has been done.
 As a result their reflections now come
             Reply  Tue Dec 14 15:15:19 2010, kiwamu, Update, SUS, put ETMY and aligned the beam 
  [Zach and Kiwamu]
 We installed the new ETMY tower and successfully aligned the beam
to the center of ETMY.
                Reply  Tue Dec 14 22:42:56 2010, kiwamu, Update, SUS, installed the last TT . And some more progresses 
  [Koji, Oasmu and Kiwamu]
 
We made the following progresses
                   Reply  Thu Dec 16 01:23:43 2010, kiwamu, Update, SUS, SRM OSEMs installed DSC_2757_ss.jpg
  [Zach and Kiwamu]
 We worked on some more vacuum businesses.  Today we finished
did the following works:
Entry  Wed Dec 15 23:10:40 2010, Koji, Update, IOO, SRM Oplev / Dark Steering mirrors installed 
I helped the vacuum installation work in the evening.
- Three steering mirrors after the SRM (OM1-OM3) were installed on the table. OM1 and OM2 were aligned.
  OM3 is in-place but not aligned to the OM4 (PZT).
Entry  Wed Dec 15 18:29:59 2010, Jenne, Update, PEM, Seismometer Channels Being Recorded Again 
The Seismometer channels are once more being recorded.  Alastair brought Gur1 back from the ATF the other day, and today I put it in its place below
MC2 (yeah, the numbers are backwards.  But they always have been.) 
I checked the matching between BNC inputs on the breakout box to the ADC channels as labeled in the SimuLink diagram.  To do this I had all
Entry  Wed Dec 15 17:21:20 2010, josephb, Update, CDS, ETMY controls status 
Status:
The c1iscey was converted over to be a diskless Gentoo machine like the other front ends, following the instructions
found here
Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration
so one has to pay attention that the foreline valves are open.
Reset  error message on vacuum screen and opened V4 & V5 at 3pm today.
Entry  Wed Dec 15 13:36:44 2010, josephb, Update, CDS, ETMY IO chassis update 
I gave Alex a sob story over lunch about having to go and try to resurrect dead VME crates.  He and Rolf then took
pity on me and handed me their last host interface board from their test stand, although I was warned by Rolf that this one (the latest generation board
from One Stop) seems to be flakier than previous versions, and may require reboots if it starts in a bad state.
    Reply  Wed Dec 15 14:23:32 2010, Koji, Update, CDS, ETMY IO chassis update 
Great!
 I wish this board works fine at least for several days...


    
        
            Quote:
        
        
            
Entry  Wed Dec 15 12:46:18 2010, Koji, Summary, IOO, Finishing up the vac work 
What else?
v: Edit on Dec 15 10PM
v: Edit on Dec 16 10PM 