40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 113 of 170  Not logged in ELOG logo
Entry  Wed Dec 15 23:10:40 2010, Koji, Update, IOO, SRM Oplev / Dark Steering mirrors installed 
Entry  Wed Dec 15 18:29:59 2010, Jenne, Update, PEM, Seismometer Channels Being Recorded Again 
Entry  Wed Dec 15 17:21:20 2010, josephb, Update, CDS, ETMY controls status 
Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
Entry  Wed Dec 15 13:36:44 2010, josephb, Update, CDS, ETMY IO chassis update 
    Reply  Wed Dec 15 14:23:32 2010, Koji, Update, CDS, ETMY IO chassis update 
Entry  Wed Dec 15 12:46:18 2010, Koji, Summary, IOO, Finishing up the vac work 
Entry  Tue Dec 14 11:24:35 2010, josephb, Update, CDS, burt restore 
Entry  Tue Dec 14 09:26:17 2010, Zach, Update, elog, restarted 
Entry  Mon Dec 13 21:03:30 2010, Kevin, Update, Electronics, RF Photodiode Characterizations 
    Reply  Tue Dec 14 04:14:53 2010, rana, Update, Electronics, RF Photodiode Characterizations 
Entry  Mon Dec 13 22:21:41 2010, kiwamu, Summary, SUS, funny output matrix of ETMX: solved ! 
Entry  Mon Dec 13 18:06:43 2010, Jenne, Update, SUS, ETMY resuspended, ready to install. Tip Tilt realigned, ready to install. StatusTable.png
Entry  Mon Dec 13 17:18:47 2010, josephb, Update, CDS, Burt updates 
Entry  Mon Dec 13 11:56:32 2010, josephb, alex, Update, CDS, Dolphin is working 
Entry  Fri Dec 10 12:55:27 2010, Jenne, Update, Computers, Backup should be running successfully now 
Entry  Fri Dec 10 11:51:20 2010, Osamu, Update, SUS, ITM seems bad 20101209_ITMX_drift.png20101209_ITMX_2stages.png
Entry  Fri Dec 10 11:04:03 2010, Osamu, Update, SUS, ETM oplev mufunctioning 20101208_ETMX_oplev_sum.png
Entry  Thu Dec 9 12:24:46 2010, kiwamu, Update, SUS, strange ETMX suspension ETMX_spectr.png
    Reply  Thu Dec 9 22:04:40 2010, kiwamu, Update, SUS, Re:strange ETMX suspension 
Entry  Thu Dec 9 12:28:52 2010, josephb, alex, Update, CDS, The Dolphin is in (Reflected memory that is) 
Entry  Thu Dec 9 01:14:42 2010, Osamu, Update, SUS,  20101208_ITMX_jump2.png
    Reply  Thu Dec 9 11:13:37 2010, Osamu, Update, SUS,  jump_oplev_offset.png
Entry  Thu Dec 9 01:54:15 2010, Jenne, Update, Electronics, Some Refl 11 fixes 
Entry  Thu Dec 9 00:34:53 2010, Osamu, Update, SUS, ITMX oplev Pitch OLTF 2010128_01_ITMX_oplev_pit_oltf_fine.pdf2010128_01_ITMX_oplev_pit_oltf_fine.jpg
Entry  Tue Dec 7 20:38:17 2010, kiwamu, Update, SUS, watchdogs off at ITMX and ETMX 
    Reply  Wed Dec 8 12:47:18 2010, kiwamu, Update, SUS, diagonalisation of ITMX input matrix 
    Reply  Wed Dec 8 22:47:09 2010, kiwamu, Update, SUS, watchdogs off at ITMX and ETMX 
Entry  Wed Dec 8 22:35:50 2010, kiwamu, Update, SUS, oplev installed on ITMX and ETMX 
Entry  Wed Dec 8 17:05:39 2010, josephb, Update, CDS, Put in dolphin fiber between c1sus and c1lsc 
Entry  Wed Dec 8 14:46:19 2010, josephb, kiwamu, Update, CDS, Why the ETMX daq channels were not recorded last night 
Entry  Tue Dec 7 12:12:40 2010, kiwamu, Update, CDS, added some more DAQ channels 
    Reply  Tue Dec 7 19:34:58 2010, kiwamu, Update, CDS, rebooted DAQ and all the front end machines 
Entry  Tue Dec 7 18:37:15 2010, Suresh, Update, SUS, ETMU05 ready for baking 
Entry  Thu Oct 14 20:31:15 2010, yuta, Update, Computers, pyNDS installation 
    Reply  Tue Dec 7 17:19:33 2010, kiwamu, Update, Computers, pyNDS available 
Entry  Tue Dec 7 16:09:53 2010, josephb, Update, CDS, c1iscex status 
Entry  Mon Dec 6 23:33:15 2010, Jenne, Update, SUS, ETMU05 winched, balanced, glued!!!!!! StatusTable.png
Entry  Mon Dec 6 22:43:19 2010, Frank, Configuration, elog, elog restarted 
Entry  Mon Dec 6 22:18:39 2010, kiwamu, Update, Green Locking, aligned the beam axis 
Entry  Mon Dec 6 16:49:43 2010, josephb, Update, CDS, c1lsc halfway to working 
Entry  Mon Dec 6 11:59:41 2010, josephb, Update, CDS, New c1lsc computer moved to lsc rack 
Entry  Sun Dec 5 22:28:39 2010, rana, Summary, all down cond., power outage 
    Reply  Mon Dec 6 11:53:20 2010, josephb, kiwamu, Summary, all down cond., power outage 
    Reply  Mon Dec 6 11:57:21 2010, Koji, Summary, all down cond., power outage 
Entry  Fri Dec 3 15:56:50 2010, Joonho, Jenne., Summary, Electronics, RF distribution unit plan RFsystem_plant_VISIO2.png
Entry  Fri Dec 3 15:37:10 2010, josephb, Update, CDS, fb, front ends fixed - tested RFM between c1ioo and c1iscex 
Entry  Fri Dec 3 14:34:23 2010, rana, Update, CDS, fooling around in the FB rack 
Entry  Fri Dec 3 05:21:11 2010, kiwamu, Update, Green Locking, locked the laser to the cavity 
Entry  Wed Dec 1 02:39:00 2010, Suresh, Update, SUS, Installation of ETMU07 as ETMX 
    Reply  Thu Dec 2 02:50:12 2010, kiwamu, Update, SUS, ETMX installed 
Entry  Thu Dec 2 00:34:32 2010, rana, HowTo, LSC, How Does Cavity Locking Work (answered by Nikon) 
Entry  Wed Dec 1 13:41:21 2010, josephb, alex, rolf, Update, CDS, Timing is back 
Entry  Wed Dec 1 12:02:49 2010, josephb, alex, Update, CDS, Rebuilding frame builder with latest code 
Entry  Tue Nov 30 19:35:09 2010, Zach, Update, elog, restarted again 
Entry  Tue Nov 30 18:15:52 2010, Jenne, Update, SUS, ETMX ready to be installed. ETMY ready for winching StatusTable.png
Entry  Tue Nov 30 16:02:18 2010, josephb, Update, CDS, status 
Entry  Tue Nov 30 14:21:21 2010, Zach, Update, elog, Script unnecessary 
Entry  Tue Nov 30 12:45:36 2010, kiwamu, Update, SUS, found a loose connection : ITMX damping 
Entry  Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day 
    Reply  Tue Nov 23 22:01:49 2010, kiwamu, Update, IOO, immigration plan for in-vac PZT mirrors  Untitled.png
       Reply  Mon Nov 29 11:51:41 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors  
          Reply  Tue Nov 30 04:22:52 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors  
             Reply  Tue Nov 30 12:33:27 2010, kiwamu, Summary, IOO, cabling of in-vac PZT mirrors  
Entry  Tue Nov 30 12:25:08 2010, josephb, Update, CDS, LSC computer to chassis cable dead 
ELOG V3.1.3-