40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 113 of 330  Not logged in ELOG logo
Entry  Fri Oct 23 16:41:06 2020, Koji, Update, IOO, Excess laser freq noise investigation plot.pdf
Entry  Fri Oct 23 19:01:57 2020, Koji, Summary, PEM, PSL Particle Counter kit removed from the table P_20201022_173529.jpgP_20201022_173419.jpg
    Reply  Mon Oct 26 13:35:58 2020, Koji, Update, IOO, Excess laser freq noise investigation 6x
    Reply  Wed Oct 28 09:35:00 2020, Koji, Update, CDS, RFM errors Screen_Shot_2020-10-28_at_10.06.00.png
Entry  Wed Oct 28 20:42:53 2020, Koji, Update, General, Vent Prep 10x
    Reply  Mon Nov 2 17:13:19 2020, Koji, Update, General, Plan for OMC chamber 
    Reply  Sun Nov 8 23:24:29 2020, Koji, Update, General, Vent activities today 
    Reply  Tue Nov 10 11:31:13 2020, Koji, Update, General, Pumpdown Screen_Shot_2020-11-10_at_11.30.21.png
    Reply  Thu Nov 12 15:40:42 2020, Koji, Update, Electronics, More systematic noise characterization 
    Reply  Mon Nov 23 14:52:10 2020, Koji, Update, BHD, BHD MMT Optics delivered 
Entry  Mon Nov 23 23:27:43 2020, Koji, Summary, ASC, Q3000 characterization 
    Reply  Thu Dec 3 13:55:52 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
    Reply  Thu Dec 3 21:14:38 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
    Reply  Fri Dec 4 03:02:40 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
    Reply  Fri Dec 4 15:58:22 2020, Koji, Update, IOO, WFS2 broken  
Entry  Fri Dec 4 19:23:40 2020, Koji, Update, Electronics, AA/AI board testing ongoing 
    Reply  Sat Dec 19 02:42:56 2020, Koji, Update, , New SMA cables on order 
    Reply  Sun Jan 3 16:26:06 2021, Koji, Update, SUS, IMC WFS check (Yet another round of Sat. Box. switcharoo) Screen_Shot_2021-01-03_at_17.14.57.png
    Reply  Thu Jan 7 20:07:27 2021, Koji, Update, ALS, Noisy ALS 
    Reply  Thu Jan 7 23:25:19 2021, Koji, Update, ALS, Noisy ALS 
    Reply  Tue Feb 2 18:24:54 2021, Koji, Update, BHD, SOS assembly 
Entry  Tue Feb 2 23:29:35 2021, Koji, Update, CDS, CDS crash and CDS/IFO recovery 
    Reply  Wed Feb 3 18:53:31 2021, Koji, Update, CDS, CDS crash and CDS/IFO recovery 
    Reply  Wed Feb 10 17:18:03 2021, Koji, Summary, BHD, Satellite Amplifier Output Offset measurements 
    Reply  Tue Feb 16 15:29:01 2021, Koji, Update, BHD, SOS assembly 
    Reply  Wed Feb 17 13:59:43 2021, Koji, Update, SUS, CoM on 3"->2" Adapter Ring for SOS 
Entry  Thu Feb 18 03:20:09 2021, Koji, Summary, Electronics, Current Rack Map rack_plan.pdf
    Reply  Thu Feb 18 20:20:25 2021, Koji, Update, SUS, aLIGO Sat Amp characterization 
Entry  Thu Feb 18 20:24:48 2021, Koji, Summary, Electronics, A bunch of electronics received IMG_0416.jpeg
    Reply  Fri Feb 19 16:06:01 2021, Koji, Update, SUS, CoM Range on 3"->2" Adapter Ring for SOS 
    Reply  Fri Feb 19 16:55:26 2021, Koji, Update, SUS, CoM Range on 3"->2" Adapter Ring for SOS 
    Reply  Sat Feb 20 16:46:17 2021, Koji, Summary, Electronics, A bunch of electronics received 
    Reply  Tue Feb 23 20:55:19 2021, Koji, Update, SUS, OSEM testing for SOSs SOS_OSEM.pdf
Entry  Tue Feb 23 23:12:37 2021, Koji, Summary, SUS, SUS invacuum wiring SOS_OSEM_cabling.pdf
    Reply  Fri Feb 26 20:20:43 2021, Koji, Update, Electronics, Production version of the HV coil driver tested with KEPCO HV supplies 
    Reply  Thu Mar 4 15:48:26 2021, Koji, Summary, PEM, Watchdog tripped, Optics damped back 
    Reply  Thu Mar 4 23:16:08 2021, Koji, Update, LSC, REFL55 demod board rework D990511-00_REFL55.pdfP_20210304_215602.jpgP_20210304_222400.jpgP_20210304_222412.jpg20210304234400_IMG_0526.jpg
Entry  Thu Mar 4 23:57:35 2021, Koji, Summary, Electronics, Inspection of the new custom dsub cables 6x
    Reply  Fri Mar 5 00:53:09 2021, Koji, Summary, Electronics, A bunch of electronics received 
    Reply  Fri Mar 5 15:31:23 2021, Koji, Update, LSC, REFL55 demod board rework 
    Reply  Fri Mar 5 15:32:53 2021, Koji, Summary, Electronics, A bunch of electronics received 
Entry  Tue Mar 9 12:41:29 2021, Koji, Summary, Electronics, Investigation on the invacuum Dsub cables SOS_OSEM_cabling.pdf
    Reply  Tue Mar 9 15:19:03 2021, Koji, Update, SUS, OSEM testing for SOSs 
    Reply  Tue Mar 9 15:22:56 2021, Koji, Summary, SUS, PRM suspension 
Entry  Thu Mar 11 02:10:06 2021, Koji, Summary, BHD, BHD Platform vertical dimentions BHD_Platform_Vertical_Dimentions.pdf
Entry  Fri Mar 12 03:08:23 2021, Koji, Summary, SUS, Coil Rs & Ls for PRM/BS/SRM P_20210311_224651.jpgP_20210311_225359.jpg
Entry  Fri Mar 12 03:22:45 2021, Koji, Update, General, Gaussmeter in the electronics drawer P_20210311_231104.jpg
Entry  Fri Mar 12 03:23:37 2021, Koji, Update, BHD, DO card (DO-32L-PE) brought from WB P_20210311_232742.jpgP_20210311_232752.jpg
    Reply  Fri Mar 12 03:28:51 2021, Koji, Update, CDS, cds reboot 
Entry  Tue Mar 16 16:02:33 2021, Koji, Update, LSC, REFL11 demod retrofitting IMG_0545.jpegIMG_0547.jpegD040179-A.pdfIMG_0548.jpegIMG_0550.jpeg
ELOG V3.1.3-