40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 112 of 171  Not logged in ELOG logo
Entry  Mon Aug 19 23:08:31 2013, Jenne, Update, LSC, DRMI sensing signals 11x
Entry  Tue Aug 20 00:19:23 2013, rana, Update, LSC, PRMI / DRMI investigations 6x
    Reply  Tue Aug 20 01:28:47 2013, Jenne, Update, LSC, REFL investigations 
       Reply  Tue Aug 20 11:41:30 2013, Koji, Update, LSC, REFL investigations 
          Reply  Tue Aug 20 11:52:20 2013, Jenne, Update, LSC, REFL investigations 
             Reply  Tue Aug 20 18:42:57 2013, Jenne, Update, LSC, REFL investigations 
Entry  Wed Aug 21 00:18:03 2013, Masayuki, Summary, Green Locking, X-arm PDH OLTF measurement IMG_1226.JPGIMG_1228.JPG
Entry  Tue Jul 23 21:32:43 2013, Koji, Update, IOO, Found the cause of mysterious MC motion 
    Reply  Wed Jul 24 14:26:24 2013, rana, Update, IOO, Found the cause of mysterious MC motion 
       Reply  Wed Aug 21 19:26:19 2013, rana, Update, IOO, Found the cause of mysterious MC motion 
Entry  Wed Aug 21 19:37:25 2013, Masayuki, Summary, Green Locking, X-arm PDH OLTF measurement OLTF_PDH_Glock_6_5_2.png
Entry  Thu Aug 22 20:25:28 2013, Masayuki, Summary, Green Locking, Y-arm PDH OLTF measurement OLTF_PDH_Glock_yarm_7.png
Entry  Thu Aug 22 21:16:47 2013, Manasa, Update, Green Locking, GTRY normalized 
    Reply  Thu Aug 22 22:05:36 2013, rana, Update, Green Locking, GTRY normalized 
Entry  Tue May 7 03:14:06 2013, Jenne, Update, SUS, PRM SUS_LSC violin (FM5) set to correct frequency 
    Reply  Wed Aug 21 23:50:40 2013, Koji, Update, SUS, PRM SUS_LSC violin (FM5) set to correct frequency 
       Reply  Fri Aug 23 01:52:34 2013, Jenne, Update, SUS, Violin filters moved to LSC, from SUS MICHloopNotches_23Aug2013.pdf
          Reply  Fri Aug 23 14:19:28 2013, rana, Update, SUS, Violin filters moved to LSC, from SUS 
Entry  Fri Aug 23 21:01:38 2013, Alex Cole, HowTo, Electronics, Automated Photodetector Frequency Response System 
Entry  Thu Aug 22 02:40:12 2013, Jenne, Update, LSC, DRMI Locked for 1+ minute!!!!!! DRMI_First_Lock_1plusMinute_21Aug2013.png
    Reply  Thu Aug 22 07:57:57 2013, Lisa, Update, LSC, DRMI Locked for 1+ minute!!!!!! 
       Reply  Thu Aug 22 13:03:40 2013, Jenne, Update, LSC, DRMI Locked for 1+ minute!!!!!! 
    Reply  Thu Aug 22 10:20:32 2013, kiwamu, Update, LSC, DRMI Locked for 1+ minute!!!!!! 
    Reply  Thu Aug 22 13:20:54 2013, Koji, Update, LSC, DRMI Locked for 1+ minute!!!!!! 
    Reply  Sat Aug 24 00:11:07 2013, Koji, Update, LSC, DRMI Locked with improved lock streatches Screenshot-Untitled_Window.png
       Reply  Sun Aug 25 06:07:11 2013, rana, Update, LSC, DRMI Locked with improved lock streatches 
Entry  Mon Aug 26 18:59:08 2013, Masayuki, Update, LSC, LSCoffset script updated 
    Reply  Mon Aug 26 19:13:38 2013, Koji, Update, LSC, LSCoffset script updated 
Entry  Mon Aug 26 19:31:22 2013, manasa, Update, SUS, PRM, ITMY watch dogs 
Entry  Tue Aug 27 02:18:28 2013, Jenne, Update, LSC, PRMI, DRMI sensing matrices SensMatMeas_26Aug2013_withErrorBars.pngSensMatMeas_26Aug2013_DRMI_firstEverMeasurement.png
Entry  Mon Aug 26 19:54:15 2013, manasa, Update, CDS, c1als model modified mistake-cartoon.gif
    Reply  Tue Aug 27 15:44:08 2013, manasa, Update, CDS, Issues with ALS fixed 
Entry  Wed Aug 28 03:28:00 2013, Jenne, Update, LSC, Playing with DRMI, some ASS automation prep 
Entry  Wed Aug 28 00:41:23 2013, Jenne, Update, CDS, CDS svn commits not happening 
    Reply  Wed Aug 28 05:21:58 2013, manasa, Update, CDS, CDS svn commits not happening 
Entry  Wed Aug 28 06:17:15 2013, manasa, Update, Computer Scripts / Programs, alias for MATLAB2010 
Entry  Wed Aug 28 06:26:28 2013, manasa, Update, Computer Scripts / Programs, ASS req and snap files edited 
Entry  Wed Aug 28 07:33:51 2013, manasa, Update, LSC, MICH locking MICH.pdf
Entry  Mon Aug 19 09:36:32 2013, Koji, Update, Green Locking, Xend green aligned ALS_OUTOFLOOP_130816.pdf
    Reply  Mon Aug 19 14:22:36 2013, rana, Update, Green Locking, Xend green aligned 
       Reply  Mon Aug 19 17:40:32 2013, Steve, Update, Green Locking, Xend green layout corrections beforeC.jpgnowC.jpgstillMultiple.jpg
          Reply  Mon Aug 19 19:08:35 2013, Koji, Update, Green Locking, Xend green layout corrections 
          Reply  Tue Aug 20 10:59:15 2013, Steve, Update, Green Locking, Xend green layout corrections faraway.jpgcloser.jpg
             Reply  Wed Aug 28 11:15:02 2013, Steve, Update, Green Locking, Xend green layout corrections 
    Reply  Mon Aug 19 16:18:56 2013, manasa, Update, Green Locking, Xend green aligned 
Entry  Tue Aug 27 19:34:36 2013, Jamie, Configuration, CDS, front end IPC configuration hosts.png
    Reply  Tue Aug 27 20:43:34 2013, Koji, Configuration, CDS, front end IPC configuration 
       Reply  Wed Aug 28 19:47:28 2013, jamie, Configuration, CDS, front end IPC configuration 
          Reply  Wed Aug 28 23:09:55 2013, jamie, Configuration, CDS, code to generate host IPC graph hosts.png40m-ipcs-graph.py
Entry  Thu Aug 29 17:25:50 2013, Jamie, Update, SUS, SUS medm screen upgrade 
Entry  Fri Aug 30 01:01:28 2013, rana, nic, Summary, Computer Scripts / Programs, aLIGO Noise Budget code installed and running NBplots.pngScreen_Shot_2013-08-30_at_1.00.02_AM.png
Entry  Mon Sep 2 15:22:57 2013, Jenne, Update, PSL, PMC relocked 
Entry  Fri Aug 30 14:31:57 2013, Steve, Update, General, cleaning up MC2areaCP.jpg1Y1areaCleanedUp.jpgETMY_NPROmoved.jpg
    Reply  Mon Sep 2 03:51:14 2013, rana, HowTo, General, How To Coil Cables 
       Reply  Tue Sep 3 10:54:33 2013, Steve, HowTo, General, How To Coil Cables 
Entry  Fri Aug 30 11:00:46 2013, Manasa, Update, General, Series of earthquakes Screenshot-Earthquakes_-_Mozilla_Firefox.pngSUSnSEIS.png
    Reply  Tue Sep 3 14:23:21 2013, Steve, Update, PEM, earthquakes EQm6&5.png
Entry  Wed Sep 4 17:22:09 2013, Jenne, Update, LSC, Demod phases for RFPDs 
Entry  Wed Sep 4 20:47:15 2013, manasa, Update, LSC, Calibrated in-loop MICH noise MICH_noise.pdf
Entry  Wed Apr 3 17:40:18 2013, Jamie, Configuration, Electronics, putting together a 110 MHz LSC demod board 
    Reply  Wed Apr 3 18:41:22 2013, Jamie, Configuration, Electronics, putting together a 110 MHz LSC demod board 
    Reply  Wed Apr 3 22:26:51 2013, rana, Configuration, Electronics, putting together a 110 MHz LSC demod board 
       Reply  Thu Apr 4 14:37:15 2013, Jamie, Configuration, Electronics, putting together a 110 MHz LSC demod board 
          Reply  Mon Aug 26 18:55:18 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS AS110_demod_board_modifications.pdf
             Reply  Mon Aug 26 20:13:17 2013, rana, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS 
                Reply  Tue Aug 27 15:31:48 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS 
                   Reply  Tue Sep 3 21:10:36 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS 
             Reply  Tue Aug 27 17:32:52 2013, Jenne, Configuration, Electronics, putting together a 110 MHz LSC demod board for AS 
                Reply  Tue Aug 27 18:21:35 2013, Jenne, Configuration, Electronics, 110 MHz LO options 
                   Reply  Tue Aug 27 18:58:52 2013, Koji, Configuration, Electronics, 110 MHz LO options 
                   Reply  Mon Sep 2 16:46:32 2013, Jenne, Update, Electronics, RF distribution box is on the bench 
                      Reply  Mon Sep 2 18:06:21 2013, Jenne, Update, Electronics, RF distribution box: 110 MHz LO options RF_distribution_box_proposed_modifications.pdf0902131751.jpg0902131751a.jpg
                         Reply  Tue Sep 3 21:08:13 2013, Jenne, Update, Electronics, RF distribution box: 110 MHz LO options 
                            Reply  Wed Sep 4 16:06:40 2013, Jenne, Update, Electronics, RF distribution box: Reinstalled 
                               Reply  Wed Sep 4 21:44:54 2013, Not Jenne, Update, Electronics, RF distribution box: Reinstalled 
Entry  Wed Sep 4 16:08:22 2013, manasa, Update, SUS, MC2 tickler turned OFF 
    Reply  Wed Sep 4 20:39:23 2013, rana, Update, SUS, MC2 tickler turned OFF 
       Reply  Wed Sep 4 22:14:35 2013, Jenne, Update, SUS, MC2 tickler turned OFF 
          Reply  Thu Sep 5 00:40:33 2013, rana, Update, SUS, MC2 tickler turned OFF 
Entry  Thu Sep 5 01:55:29 2013, Jenne, Update, LSC, LSC model upated to have AS110 channels, violin filter triggering 
Entry  Thu Sep 5 10:28:17 2013, Steve, Update, SUS, PRM side  craneguywashere.png
    Reply  Thu Sep 5 11:19:33 2013, Jenne, Update, SUS, PRM side  
Entry  Thu Sep 5 15:18:41 2013, Jenne, Update, LSC, Free swinging DRMI power buildups DRMI_free_swing_power_buildups.pdf
Entry  Thu Sep 5 21:07:09 2013, Jenne, Update, LSC, Started work on logic for triggering 
Entry  Fri Sep 6 23:01:08 2013, Koji, Update, LSC, Stable DRMI lock was recovered from the impact on the RF system modification DRMI.pngSensMat_PRMI_1000cts_580Hz_2013-08-26_235635.pngSensMat_PRMI_1000cts_580Hz_2013-09-06_201137.png
Entry  Wed Sep 11 17:35:38 2013, Jenne, Update, LSC, ALS requirement ArmLinewidthComparison.pngLinewidthComparison.png
Entry  Wed Sep 11 23:34:37 2013, Masayuki, Summary, Green Locking, ALS locking in both arms noise.pdf
    Reply  Wed Sep 11 23:43:10 2013, Koji, Summary, Green Locking, ALS locking in both arms 
       Reply  Thu Sep 12 00:07:26 2013, Masayuki, Summary, Green Locking, ALS locking in both arms 
Entry  Thu Sep 12 01:06:09 2013, Jenne, Update, ASC, SRCL ASS implemented 
Entry  Mon Sep 9 20:46:28 2013, Masayuki, Update, LSC, MICH calbration 
    Reply  Tue Sep 10 17:35:50 2013, Masayuki, Manasa, Update, LSC, MICH calbration MICH_calib_loops.pngOLTF_MICHDC.pngMICH_DC_resp.pngMICH_RF_resp.pngMICH_free_noise.png
       Reply  Thu Sep 12 23:36:25 2013, Masayuki, Update, LSC, MICH calbration BSsus.PNGITMXsus.PNGITMY.PNGfree_running.PNG
          Reply  Fri Sep 13 19:22:01 2013, Masayuki, Update, LSC, MICH calbration noise.PNG
             Reply  Mon Sep 16 14:11:47 2013, rana, Update, LSC, MICH calbration Screen_Shot_2013-09-16_at_2.10.31_PM.pngScreen_Shot_2013-09-16_at_2.18.47_PM.png
                Reply  Tue Sep 17 00:50:42 2013, Masayuki, Update, LSC, MICH calbration noise.PNG
Entry  Tue Aug 27 19:50:06 2013, Jamie, Configuration, Computer Scripts / Programs, cdsutils checked out into /opt/rtcds 
    Reply  Mon Sep 16 15:29:50 2013, Jamie, Configuration, Computer Scripts / Programs, cdsutils checked out into /opt/rtcds 
       Reply  Mon Sep 16 19:41:01 2013, rana, Configuration, Computer Scripts / Programs, cdsutils checked out into /opt/rtcds 
          Reply  Tue Sep 17 17:55:42 2013, Jamie., Configuration, Computer Scripts / Programs, pyepics configured 
Entry  Wed Sep 18 11:29:43 2013, manasa, Update, CDS, Dataviewer cannot connect to fb CDS_FE.png
    Reply  Wed Sep 18 11:52:53 2013, Jamie, Update, CDS, Dataviewer cannot connect to fb 
Entry  Thu Sep 19 10:24:58 2013, Steve, Update, PEM, PRM damping restored after earth quake eq3.8mLaVerne.png
Entry  Wed May 23 13:57:11 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items 
    Reply  Wed May 23 20:41:37 2012, Suresh, Bureaucracy, General, 40m Meeting Action Items: Tip-tilts : cabling and electronics  
    Reply  Thu May 24 01:17:13 2012, Den, Update, CDS, PMC autolocker 
       Reply  Sun Jun 24 23:42:31 2012, yuta, Update, Computer Scripts / Programs, PMC locker 
          Reply  Mon Jun 25 21:54:52 2012, Den, Update, Computer Scripts / Programs, PMC locker 
             Reply  Tue Jun 26 00:52:18 2012, yuta, Update, Computer Scripts / Programs, PMC locker 
                Reply  Thu Sep 19 18:48:24 2013, rana, Update, Computer Scripts / Programs, PMC locker pmc.png
                   Reply  Thu Sep 19 21:15:44 2013, rana, Update, Computer Scripts / Programs, PMC locker Untitled.pdf
Entry  Fri Sep 20 08:15:30 2013, Steve, Update, Computer Scripts / Programs, Ottavia, Rossa and Pianosa Ottavia.pngRossa.pngPianosa.png
Entry  Thu Sep 19 21:42:18 2013, rana, Update, SUS, Optical Lever Trend for 90 days: ETMX and PRM are the bad ones OLtrend_2013.png
    Reply  Fri Sep 20 09:49:06 2013, Steve, Update, SUS, Optical Lever Trend for 180 days: bad ETMY & PRM ETMYoplevPRM.png
Entry  Tue Aug 20 16:23:41 2013, rana, Summary, General, /home/cds nearly full 
    Reply  Wed Aug 21 17:42:03 2013, rana, Summary, General, /home/cds nearly full 
       Reply  Fri Sep 20 20:14:52 2013, rana, Summary, General, /home/cds nearly full 
Entry  Fri May 13 17:20:48 2011, Leo Singer, Configuration, SUS, Tuned bounce and roll mode of ETMY suspension 
    Reply  Sun Sep 22 21:03:15 2013, rana, Configuration, SUS, Tuned bounce and roll mode of ETMY suspension etmy-error.pngnotches.pdf
Entry  Sun Sep 22 21:28:53 2013, rana, Update, SUS, set OL T RAMP values (they are not visible on the OL screens) 
Entry  Sun Sep 22 23:04:52 2013, rana, Update, PEM, Guralp needs recentering seis.pdf
Entry  Tue Sep 24 10:55:45 2013, rana, Update, PSL, PMC re-aligned psl-trend.png
ELOG V3.1.3-