  3290   Mon Jul 26 10:04:24 2010 steveUpdateGeneralInitial Crane Inspection reveals flaws: wiring, oil and imbalance


   
        
            
 2500.JPGsedrum.JPG 
  360   Wed Mar 5 12:51:48 2008 JohnSummaryLSCInitial Ligo Arm finesse versus lambdaI've taken the coating recipes for the initial
ligo arm cavity from Rana's web page (ligo.caltech/edu/~rana/mat/)
and plotted the finesse as a function of
 FofLambdaLIGOI.jpg 
  7599   Tue Oct 23 17:30:33 2012 jamie, nic, jenne, raji, manasaUpdateAlignmentInitial attempts to fix IFO alignmentWe went into the vertex today to see about
fixing the alignment.  The in-air access
connector is in place, and we took heavy
  
  12080   Fri Apr 15 23:11:49 2016 gautamUpdateGeneralInnolight 1W moved to SP tableI
have moved the 1W Innolight + controller
from the PSL table to the SP table for beam
  
  2810   Mon Apr 19 16:31:42 2010 KevinUpdatePSLInnolight 2W LaserKoji and Kevin 
We unpacked the Innolight 2W laser,
took an inventory, and scanned the operations
  
  2822   Tue Apr 20 20:15:37 2010 KevinUpdatePSLInnolight 2W Output Power vs Injection CurrentKoji and Kevin measured the output power
vs injection current for the Innolight 2W
laser.
 PvsI_2W.jpg 
  2828   Wed Apr 21 21:56:27 2010 KevinUpdatePSLInnolight 2W Vertical Beam ProfileKoji and Kevin measured the vertical beam
profile of the Innolight 2W laser at one
point.
 bp2.jpgbp2.dat 
  2829   Wed Apr 21 22:11:48 2010 ranaUpdatePSLInnolight 2W Vertical Beam ProfileBack in Gainesville in 1997, I learned
how to do this using the chopper wheel.
  
  2830   Wed Apr 21 23:35:37 2010 KojiUpdatePSLInnolight 2W Vertical Beam ProfileGood fit. I assumed sqrt(x) is a typo of
sqrt(2).

  
  2834   Thu Apr 22 21:42:24 2010 AlbertoUpdatePSLInnolight 2W Vertical Beam Profile 
 What kind of fit did you use?
How are the uncertainties in the parameters
  
  14556   Fri Apr 19 14:06:36 2019 gautamUpdatePSLInnolight NPRO shutoffWhen I got back from lunch just now, I
noticed that the PMC TRANS and REFL cameras
were showing no spots. I
 Screenshot_from_2019-04-19_14-06-11.png 
  14560   Fri Apr 19 20:21:52 2019 gautamUpdatePSLInnolight NPRO shutoffHappened again at ~730pm.

The NPRO diag channels don't
really tell me what happened in a causal
 Screenshot_from_2019-04-19_20-27-04.png 
  14566   Wed Apr 24 16:06:44 2019 gautamUpdatePSLInnolight NPRO shutoffAfter discussing with Koji, I turned the
NPRO back on again, at ~4PM local time. I
first dialled the injection current down
 PMCrefl.png 
  14577   Thu Apr 25 17:31:56 2019 gautamUpdatePSLInnolight NPRO shutoffNPRO shutoff at ~1517  local time
today afternoon. Again, not many clues from
the NPRO diagnostics channel, but to my eye,
 EdwinShutoff20190425.pngEdwinShutdown_zoomOut.png 
  12109   Thu May 5 21:28:44 2016 gautamUpdateendtable upgradeInnolight PZT capacitanceI suggested
in an earlier elog that after the repair
  
  11961   Fri Jan 29 14:43:47 2016 SteveUpdateGreen LockingInnolight laser is 10 years old


 inno1W.pdf 
  11962   Fri Jan 29 16:55:27 2016 ranaUpdateGreen LockingInnolight laser is 10 years oldI don't think there's any evidence
that the noise eater is bad. That would change
the behavior of the relaxation oscillation
  
  11963   Sat Jan 30 00:12:22 2016 gautamUpdateGreen LockingInnolight laser is 10 years old 




 RIN_comparison.pdf 
  11964   Sat Jan 30 09:56:24 2016 KojiUpdateGreen LockingInnolight laser is 10 years oldIt is strange that there is no difference
between with and without NE, isn't it?
  
  11967   Mon Feb 1 15:16:28 2016 gautamUpdateGreen LockingInnolight laser is 10 years oldThe Innolight laser control unit has a
25 pin D-sub connector on the rear which
is meant to serve as a diagnostics aid, and
  
  11968   Mon Feb 1 15:43:18 2016 KojiUpdateGreen LockingInnolight laser is 10 years oldThis is the same one as what you got from
Steve. But you can find full pages.

https://wiki-40m.ligo.caltech.edu/PSL/NPRO
  
  11987   Fri Feb 12 11:10:49 2016 SteveUpdateGreen LockingInnolight laser is 10 years oldIt shipped out for repair evaluation.

Arrived to Hayward,CA   2016Feb16

 
 inno1W.jpg 
  4705   Thu May 12 22:54:20 2011 ranaUpdateDAQInput Beam Naming change (no more IP) We decided to rename the Input Beam
channels (while keeping temporary backwards
compatible aliases) as:
  
  2584   Tue Feb 9 17:51:48 2010 JenneSummaryIOOInput Mode Matching Telescope design is completeThe upgrade's input mode matching telescope
design is complete.  A summary document
is on the MMT
  
  7012   Mon Jul 23 20:19:01 2012 LizUpdateComputer Scripts / ProgramsInput Needed (From everyone!)The summary pages
are now online
  
  11896   Tue Dec 22 16:23:33 2015 gautamUpdateIOOInput alignment to PMC tweakedWhen I came in this afternoon, I saw that
the PZT voltage to the PMC had railed. Following
the usual procedure of turning the servo
  
  7699   Tue Nov 13 00:15:08 2012 JenneUpdateIOOInput and Output PZTs turned onI turned on the power supplies for the
output PZTs and pitch and yaw for PZT2. 
This is back to the condition that we had
  
  8262   Fri Mar 8 20:51:00 2013 ManasaUpdateAlignmentInput beam drift - investigation **IMPORTANT**Checking the drift in input pointing
(TT2 is the main suspect)
  
  8267   Mon Mar 11 12:29:25 2013 ManasaUpdateAlignmentInput beam drift - weekend trendI centered ipang and ippos on the QPDs
(using only the steering mirrors) and wanted
to see the drift over the weekend.
 IPANG_drift.png 
  8252   Thu Mar 7 18:12:03 2013 yutaUpdateAlignmentInput beam drift ~ 0.1 mrad/h in pitch[Jenne, Manasa, Yuta]

We temporarily centered the beam on
 IPangulardrift.png 
  13827   Wed May 9 17:30:04 2018 gautamUpdateGeneralInput beam misalignedThere is
no beam going into the IFO at the moment.
 InputBeamGone.pngTTpointing.png 
  13828   Wed May 9 19:51:07 2018 gautamUpdateGeneralInput beam misalignedAs
suspected - the problem was with the TTs.
 DACweirdness.pngDACerror.png 
  7210   Thu Aug 16 20:18:39 2012 YaakovUpdateSTACISInput for feedforward/feedback in the STACISBelow is the bottom view of the geophone
preamplifier and controller for the STACIS.
It slides into the upper part of the STACIS,
 6x 
  5438   Fri Sep 16 17:16:15 2011 JenneUpdateSUSInput matrix diagonalization: Fail![Jenne, Anamaria]
I put the new matricies in from the
free swinging test for the: ITMX, ITMY, ETMX,
  
  4653   Fri May 6 15:42:55 2011 valeraMetaphysicsIOOInput mode cleaner length and 11 MHz modulation frequency After Kiwamu set the REFL11 phases
in the PRMI configuration (maximized PRM->REFL11I
reesponse) I tried to measure the MC length
  
  15567   Thu Sep 10 15:43:22 2020 JonUpdateBHDInput noise spectra for A+ BHD modelingAs promised some time ago, I've
obtained input noise spectra from the sites calibrated
to physical units. They are located in a
  
  15181   Fri Jan 31 16:04:30 2020 gautamUpdateIOOInput pointing driftOne factor which hampers locking efforts
is the apparent drift of the input beam into
the IFO. Over timescales of ~1 hour, I have
 IPdrift.pdfIPdrift_PRMI.pdf 
  15841   Wed Feb 24 12:29:18 2021 gautamUpdateGeneralInput pointing recoveredWhile working at the LSC rack, I lost the
input pointing into the IFO (the TT wiring
situation is apparently very fragile, and
  
  3114   Thu Jun 24 11:16:32 2010 Sharmila, Rana and KiwamuHowToVACInspection of the BS (sorry, no sounds)    
  3093   Mon Jun 21 14:21:34 2010 Jenne, KiwamuUpdatePhotosInspection of Magnets for the TTs    
  3095   Mon Jun 21 20:11:21 2010 KojiUpdatePhotosInspection of Magnets for the TTsWere these magnets chipped before the Ni
plating?
  
  15865   Thu Mar 4 23:57:35 2021 KojiSummaryElectronicsInspection of the new custom dsub cablesI made the inspection of the new custom
DSub cables (came from Texas).

The shelled version gives us some
 6x 
  14175   Wed Aug 22 00:22:05 2018 KojiSummaryElectronicsInspection of the possible dual backplane interfaces for Acromag DAQ[Johannes, Koji]

We went around the LSC, PSL, IOO,
and SUS racks to check how many dual backplane
  
  14177   Wed Aug 22 12:22:27 2018 ranaSummaryElectronicsInspection of the possible dual backplane interfaces for Acromag DAQI think we don't need to keep Crystal
Ref: we can change this into a regular Wenzel
box with no outside control or monitoring.
  
  5672   Sat Oct 15 17:06:20 2011 KojiUpdateLSCInstallation REFL165 REFL165 was installed on the AP table last
night.
Meanwhile I found the DC power level
  
  4002   Wed Dec 1 02:39:00 2010 SureshUpdateSUSInstallation of ETMU07 as ETMX[Kiwamu, Jenne, Koji, Suresh]
The following steps in this process
were completed.
  
  10261   Wed Jul 23 11:15:54 2014 AkhilUpdateElectronicsInstallation of FCs in the 40m As a part of installation of two(X-ARM
and Y-ARM) frequency counters in the 40m,
I have tested their performance when using
 Timingwith2FCs.png 
  6090   Thu Dec 8 16:54:05 2011 JenneUpdateRF SystemInstallation of new demod boxSo far:
* New demod box has been placed in
the LSC rack.
  
  15500   Fri Jul 24 15:40:59 2020 JordanUpdateVACInstallation of two new UPS unitsI installed the Tripp
Lite SMX1000RT2U and Tripp
Lite Smart1000LCD at the
 UPS.jpg 
  16826   Tue May 3 14:02:09 2022 AnchalSummaryBHDInstalled POP path in ITMX Chamber[Anchal, JC]

I installed POP_SM4 and POP_SM5
in the ITMX chamber in the nominal positions.
  