Thu Jul 25 14:45:06 2013, rana, Update, PEM, Guralp specgram with ligoDV and NDS2
|
Mon Jul 8 15:31:48 2013, Jenne, Update, ASC, POP QPD calibration prep
|
Tue Jul 9 11:41:22 2013, Jenne, Update, ASC, POP QPD calibration attempt
|
Tue Jul 9 16:08:32 2013, Jenne, Update, ASC, POP QPD calibration attempt
|
Fri Jul 12 21:23:42 2013, Jenne, Update, ASC, POP QPD calibration attempt 
|
Mon Jul 15 17:16:59 2013, Jenne, Update, ASC, POP QPD calibration attempt  
|
Tue Jul 16 01:17:21 2013, Jenne, Update, ASC, POP QPD calibration attempt
|
Tue Jul 23 01:30:27 2013, Jenne, Update, ASC, POP QPD analysis 9x
|
Fri Jul 26 13:39:30 2013, Koji, Update, ASC, POP QPD analysis
|
Fri Jul 26 14:39:08 2013, Charles, Update, ISS, Power Regulation for ISS Board
|
Thu Jul 18 21:45:36 2013, Charles, Update, ISS, ISS - Full Schematic
|
Wed Jul 24 22:58:03 2013, Charles, Update, ISS, ISS - Full Schematic - Updated
|
Fri Jul 26 22:19:24 2013, Charles, Update, ISS, ISS - Full Schematic - Updated
|
Sun Jul 28 19:39:04 2013, Annalisa, Update, endtable upgrade, Picture
|
Sun Jul 28 20:13:41 2013, Annalisa, Update, Green Locking, Y Phase tracker calibration
|
Fri Jul 26 22:45:14 2013, manasa, Update, General, Vent progress
|
Tue Jul 30 00:21:15 2013, Koji, Update, General, Vent progress
|
Tue Jul 30 11:30:55 2013, manasa, Update, General, ITMX oplev
|
Tue Jul 30 13:41:35 2013, Koji, Update, General, ITMX oplev
|
Tue Jul 30 15:38:24 2013, manasa, Update, General, ITMX oplev
|
Tue Jul 30 16:21:46 2013, Alex Cole, Update, Electronics, Photodetector Input Modulation
|
Tue Jul 30 18:56:31 2013, manasa, Update, General, ITMX chamber vented/Closing plan
|
Wed Jul 31 00:59:58 2013, manasa, Update, General, ITMX chamber vented/Closing plan
|
Wed Jul 31 09:51:43 2013, Steve, Update, safety, Sujan receives safety training
|
Wed Jul 31 10:27:00 2013, Steve, Update, VAC, instrument grade air is discontinoued
|
Thu Aug 1 16:33:39 2013, Sujan, Update, PEM, Guralp2 seismometer installed at North side of POX table
|
Wed Jul 31 17:02:17 2013, Alex Cole, Update, Electronics, Preliminary Photodetector Frequency Reponse Measurements   
|
Thu Aug 1 18:55:20 2013, Alex Cole, Update, Electronics, Preliminary Photodetector Frequency Reponse Measurements 
|
Thu Aug 1 21:28:09 2013, gautam, Update, CDS, Slow channels set-up in ALS
|
Fri Aug 2 21:59:36 2013, Charles, Update, ISS, Finalized ISS Schematic (hopefully) 
|
Thu Aug 1 22:58:45 2013, Charles, Update, ISS, CTN Servo - Explicit Requirement and Proposed Servo 
|
Mon Aug 5 11:53:45 2013, Evan, Update, ISS, CTN Servo - Explicit Requirement and Proposed Servo
|
Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation
|
Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
|
Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification
|
Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board
|
Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made 
|
Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum    
|
Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum
|
Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units  
|
Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units
|
Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth
|
Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches
|
Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration  
|
Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts
|
Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount
|
Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT   
|
Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors    
|
Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable   
|
Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted
|
Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted
|
Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified
|
Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes 
|
Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9
|
Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested
|
Wed Jul 31 21:12:05 2013, manasa, Update, General, Pump down called off
|
Thu Aug 1 16:03:52 2013, Steve, Update, General, reopen BS & IOO
|
Thu Aug 1 22:49:31 2013, manasa, Update, General, Green status after PR3 flipping investigated
|
Fri Aug 2 17:50:10 2013, Jenne, Update, General, PR3 wedge angle adjusted
|
Fri Aug 2 22:51:10 2013, Jenne, Update, General, All vent tasks complete, just need oplev check
|
Mon Aug 5 18:02:34 2013, manasa, Update, General, Close up list checked
|
Tue Aug 6 07:52:58 2013, manasa, Update, General, Ready to pump down   
|
Tue Aug 6 12:43:23 2013, Alex Cole, Configuration, Electronics, AS Table and Rack 1Y1 Additions 
|
Wed Aug 7 15:51:53 2013, Alex Cole, Configuration, Electronics, RF Switch Change
|
Wed Aug 7 15:32:37 2013, Koji, Update, ASC, ASS setting up accelerated (slightly)
|
Wed Aug 7 19:16:20 2013, Jenne, Update, ASC, ASS setting up accelerated more
|
Wed Aug 7 22:18:43 2013, Koji, Update, ASC, ASS update
|
Thu Aug 8 11:18:46 2013, manasa, Update, Computer Scripts / Programs, Unused scripts in ASS moved
|
Thu Aug 8 18:43:12 2013, Sujan, Summary, PEM, Optimally subtracting signals from two seismometers.
|
Thu Aug 8 18:47:41 2013, Sujan, Summary, PEM, Using weiner filters for subtracting signals MC_L and GUR2_X
|
Thu Aug 8 21:25:36 2013, Koji, Update, General, Post-vent alignment cont'd
|
Fri Aug 9 16:49:35 2013, Jenne, manasa, Update, Electronics, Post-vent alignment cont'd - RFPDs
|
Tue Aug 6 19:53:15 2013, Jenne, Update, LSC, Arms locked in IR, aligned. IFO at nominal power
|
Wed Aug 7 10:09:30 2013, Koji, Update, LSC, Arms locked in IR, aligned. IFO at nominal power
|
Wed Aug 7 21:52:11 2013, Jenne, Update, SUS, SRM coils fine - problem with slow bias slider
|
Fri Aug 9 21:05:28 2013, Koji, Update, SUS, fixed: SRM coils fine - problem with slow bias slider
|
Thu Aug 1 12:12:35 2013, gautam, Update, CDS, New model for endtable PZTs
|
Thu Aug 1 13:09:17 2013, gautam, Update, CDS, New model for endtable PZTs-procedure
|
Thu Aug 1 15:06:59 2013, jamie, Update, CDS, New model for endtable PZTs
|
Thu Aug 1 15:28:44 2013, gautam, Update, CDS, New model for endtable PZTs-problem solved
|
Thu Aug 1 20:58:56 2013, gautam, Update, CDS, New model for endtable PZTs-MEDM Screens setup   
|
Mon Aug 5 18:18:32 2013, gautam, Update, CDS, Choosing LO Amplitudes and Frequencies
|
Mon Aug 5 19:10:01 2013, Koji, Update, CDS, Choosing LO Amplitudes and Frequencies
|
Tue Aug 6 16:36:51 2013, gautam, Update, CDS, Choosing LO Amplitudes and Frequencies-revised
|
Wed Aug 7 23:40:49 2013, gautam, Update, CDS, X-End Green ASS - A first update
|
Sat Aug 10 05:53:51 2013, gautam, Update, CDS, X-End Green ASS - Roundup
|
Mon Aug 12 12:57:59 2013, Jenne, Update, CDS, X-End Green ASS - Roundup
|
Mon Aug 12 13:30:33 2013, Jamie, Update, CDS, X-End Green ASS - Roundup
|
Fri Aug 9 22:51:37 2013, Koji, Update, LSC, PRMI(sb) lock recovered
|
Mon Aug 12 10:44:22 2013, rana, Update, LSC, PRMI(sb) lock recovered
|
Mon Aug 12 14:05:34 2013, Jenne, Update, ASC, PRCL ASS software in place
|
Mon Aug 12 15:39:40 2013, Jenne, Update, ASC, PRCL ASS screens in place
|
Mon Aug 12 17:30:03 2013, Koji, Update, ASC, PRCL ASS software in place
|
Mon Aug 12 23:13:14 2013, Jenne, Update, ASC, PRCL ASS software in place
|
Tue Aug 13 11:04:44 2013, Steve, Update, PEM, fluorecent lights
|
Tue Aug 13 11:40:19 2013, Alex Cole, Summary, Electronics, RFPD Demod Filter Frequency Response Measurement 
|
Tue Aug 13 11:54:40 2013, Alex Cole, HowTo, Electronics, RF PD Fiber-Coupled Laser Operation
|
Tue Aug 13 13:30:41 2013, Alex Cole, Configuration, Electronics, Cable Routing
|
Tue Aug 13 21:49:32 2013, Koji, Summary, General, Testing new AG4395A network analyzer
|
Tue Aug 13 22:21:12 2013, Koji, Summary, General, Minicircuit Filter TFs (AG4395A test)   
|
Thu Aug 15 01:51:50 2013, Koji, Summary, General, RFM<->Dolphin bridge distributed to c1rfm and c1mcs
|
Thu Aug 15 09:34:12 2013, Steve, Update, General, Wilcoxon cables rescued  
|
Tue Aug 13 21:09:03 2013, manasa, Update, Green Locking, Arms ready for ALS
|
Thu Aug 15 12:30:17 2013, manasa, Update, Green Locking, Lost beat notes
|
Thu Aug 15 19:05:07 2013, manasa, Update, Green Locking, ALS out of loop noise
|
Thu Aug 15 21:42:53 2013, Charles, Update, ISS, ISS - Schematic + PCB Layout 
|
Mon Oct 15 08:12:45 2012, Steve, Update, VAC, blank vac monitor
|
Mon Oct 15 13:07:51 2012, jamie, Update, VAC, vacuum VME crate broken, replaced, minor vacuum mayhem ensues
|
Mon Oct 15 14:51:16 2012, Jenne, Update, SUS, SUS were kicked hard as a result
|
Mon Oct 15 17:08:01 2012, Steve, Update, VAC, vacuum is back with some disabled valves   
|
Wed Oct 24 09:15:12 2012, Steve, Update, VAC, vacuum rack 24V ps was current limited
|
Mon Nov 5 10:34:48 2012, Steve, Update, VAC, existing vacuum documents
|
Fri Aug 16 09:35:18 2013, Steve, Update, VAC, Vacuum Normal state recognition is back 
|
Fri Aug 16 13:25:50 2013, Koji, Update, ASS, ASX model/screen cleaning up
|
Fri Aug 16 19:36:49 2013, Charles, Update, PSL, PMC_trans Channel
|
Sun Aug 18 16:04:07 2013, rana, Summary, CDS, FB lights all RED: mxstream restart
|
Sun Aug 18 17:56:16 2013, rana, Summary, CDS, MEDM Screen CPU Usages
|
Sun Aug 18 20:07:41 2013, rana, Update, Computer Scripts / Programs, userapps SVN up
|
Mon Aug 19 07:53:48 2013, Steve, Update, SUS, ETMX damping restored
|
Mon Aug 19 09:54:13 2013, Steve, Update, safety, Masayuki receives safety training
|
Mon Aug 19 10:03:17 2013, Steve, HowTo, General, how not to leave a cable
|
Mon Aug 19 10:16:15 2013, Picasso, Metaphysics, Treasure, outsider art
|
Mon Aug 19 11:30:20 2013, Jenne, Update, IOO, MC mirrors' ASC has non-zero inputs
|
Mon Aug 19 15:23:07 2013, Koji, Update, IOO, MC mirrors' ASC has non-zero inputs
|
Mon Aug 19 23:08:31 2013, Jenne, Update, LSC, DRMI sensing signals 11x
|
|