40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 109 of 344  Not logged in ELOG logo
    Reply  Mon Jul 14 14:28:27 2014, Koji, Summary, Electronics, Timing Issues of Mini Circuits UFC-6000: Solved 
Looks good. Now you have the internal timer to verify the external clock. 
If you can realize the constant rate sampling without employing the external clock, that's quite handy.
    Reply  Wed Jul 16 01:35:16 2014, Koji, Summary, LSC, Python Wavelet peak finding for dramatic ALS - Red Resonance finding speedup 
From the last plot:
- Subtracting the offset of 0.0095, the modulation depth were estimated to be 0.20 for 11MHz, 0.25 for 55MHz
- Carrier TEM00 1.0, 1st order 0.01, 2nd order 0.05, 3rd order 0.002, 4th order 0.004
    Reply  Wed Jul 16 02:22:10 2014, Koji, Update, Electronics, Test run of PDFR system 
Log-log ... 
    Reply  Wed Jul 16 23:02:16 2014, Koji, Summary, Electronics, Bode Plots and complete Characterization of Frequency Counter 
If I assume 1sample delay for 0.1s sampling rate, the delay is Exp[-I 2 pi f T], where T is the sampling period.
This means that you expect only 36 deg phase delay at 1Hz. In reality, it's 90deg. Huge!
Also there are suspicious zeros at ~1.6Hz and ~3Hz. This may suggest that the freq counter is doing some
    Reply  Thu Jul 17 17:39:57 2014, Koji, Update, Electronics, PDFR debugging attempt : REFL11 
What is the coupling factor between the RF in and the RF mon of the demodulator? 
I don't assume you have the same amount RF power at those two points unless you have an RF amplifier in the mon path.
    Reply  Thu Jul 17 22:08:14 2014, Koji, Update, General, 1X2 Rack Changes 
It sounds like the work was done carefully. Even so, Jenne or Manasa have to run the ALS (X and Y) to check if they are still functional.
    Reply  Sat Jul 19 20:51:51 2014, Koji, Update, LSC, RIN in arm transmission 
Your calibration of the ALS signal should be revised.
The phase for the ALS is not an optical phase of the green but the phase of the phase tracker servo output.
The calibration of the phase tracker depends on the cable length of the delay line in the beat box.
Entry  Wed Jul 23 11:32:04 2014, Koji, Update, LSC, IFO warming up 140722_ALS.pdf
Alone with the IFO. Started from some conversation with it.
Some ALS trials: Found the Y-end green alignment was terrible. In fact the end green set up is terrible. 
Unfixed optics, clipping/fringing in the faraday, unstable suprema mounts which is unnecessarily big.
    Reply  Tue Jul 29 16:41:54 2014, Koji, Update, LSC, MC servo MCservo.pdf
The MC openloop gains were measured with several conditions
- MC fast/PC crossover was measured to be ~30kHz.
- No feature found in the fast path above 10kHz.
Entry  Tue Jul 29 20:14:10 2014, Koji, Update, 40m Xend Table upgrade, Xarm Green steering mirror upgrade 
That was super fast! Great job, Andres and Nic!
    Reply  Wed Jul 30 00:42:27 2014, Koji, Update, LSC, MC servo MCservo.pdf
I used an oscillator and an oscilloscope to measure the open loop transfer function at higher frequency than 100kHz.
(I remember that I tried to use Agilent 4375A for this and failed before ... due to low input impedance???)\
Here is the update. It seems that the gain margin is not so large. We should apply low pass to prevent too large servo bump.
    Reply  Wed Jul 30 22:01:24 2014, Koji, Update, LSC, MC servo 
In fact there is a pomona box between the HV amp and the laser.
It is expected that the combination of the box and the laser PZT (2.36nF by Elog #3640) provides poles at 2.9Hz and 148kHz and a zero at 32Hz.
Basically, the gain of this stage is 0.1 at 10kHz. So the injected noise is reduced by factor of 10. It is just barely OK.
Entry  Wed Jul 30 23:12:05 2014, Koji, Update, General, IFO patrol 
- The cable for the beat note was disconnected from the frequency counter and reconnected to the spectrum analyzer.
- PMC/IMC had not been locked for 8 hours. 
- PMC was relocked.
Entry  Thu Jul 31 01:08:54 2014, Koji, Update, LSC, ALS stability check postXGreenUpgradeCheckup.pdf
- ALS X/Y arm stability was checked by IR locked arms.
- Basically the stability looks same as before.
Q sez: here are some ALS ASDs (in Hz/rtHz). 
    Reply  Thu Jul 31 12:23:38 2014, Koji, Summary, Electronics, PZT Calibration 
1) Don't be brainless. Redo the fitting of the Y arm. Obviously the fit is not good.
2) How can you explain the value from the ADC bit and range?
e.g. +/-10V range 16bit ADC => 2^16/20 = 3276.8 count/V
Entry  Thu Jul 31 19:37:59 2014, Koji, Update, IOO, Successful modification of the FSS 
Quick note:
Migration of the 10Hz pole from the output stage of the FSS to the pomona box was successful.
This also allowed me to insert my offsetting/summing point circuit.
    Reply  Thu Jul 31 21:21:49 2014, Koji, Frogs, elog, MicroSoft BingBot is attacking us 
Oh, this is cool! Thanks!
I could not figure out how to place robot.txt as it was not so obvious how elogd handles the files in the "logfile" directory.
Entry  Thu Jul 31 21:59:25 2014, Koji, Bureaucracy, General, Ants P7316690.JPG
Don't leave your food on tables and desks!
Also I put the souvenir chocolates in the microwave,
just in case.
    Reply  Thu Jul 31 23:19:22 2014, Koji, Update, Computer Scripts / Programs, SVN bulletin 
Did this break "netgpibdata"?
I couldn't download data from SR785. Downloading from AG4395A was OK.
The cause seemed the module for SR785
Entry  Thu Jul 31 23:43:00 2014, Koji, Update, IOO, Modulation frequency adjustment 
The main IFO modulation frequency was adjusted to match with the FSR of the IMC.
The new frequency is 11.066128 MHz. This corresponds to the IMC round-trip length of 27.0910 m
This has been done by looking at the peak at 25.845MHz (5* fmod - 29.5MHz) in the MC REFL PD mon.
Entry  Fri Aug 1 00:51:07 2014, Koji, Update, PSL, FSSSlowServo update 
FSS Slow set point to be zero

op340m:FSS>cat FSSSlowServo
#!/usr/bin/perl -w
Entry  Fri Aug 1 01:29:55 2014, Koji, Update, IOO, PMC issue 
- PMC suddenly refused to lock.
- Investigated what's wrong
- Finally, I touched RF Output Adjust (C1:PSL-PMC_RFADJ). Then it started locking.
Entry  Fri Aug 1 01:57:24 2014, Koji, Summary, IOO, MC auto locker 
To make MC auto locker running correctly, mcdown and mcup were revised
I tried it by unlocking MC several times. It seems OK. Let's see how it works.

Nominal gains for locking (to be taken care by mcdown)
Entry  Fri Aug 1 03:49:26 2014, Koji, Summary, General, Koji - to do 
- Put the circuit diagram of the sum amp on/in the circuit enclosure and associate it with an elog [done].
- Update the circuit diagram of the pomona box [done] 
ALL DONE
    Reply  Fri Aug 1 08:55:34 2014, Koji, Summary, IOO, MC auto locker MC.png
It seems that the MC auto locker and the FSSSlow PID servo survived a night.
PC Drive is still angry occasionally. We want to know what this is.
Entry  Fri Aug 1 10:40:48 2014, Koji, Summary, IOO, MC servo summing amp Fast_PZT_IF.PDF
The summing amp is prepared to allow up to use bipolar full range of the FSS box output
This means that the FSS fast PZT output is now nominally 0V and can range +/-10V.
-
FSS Box has the output range of +/-10V
    Reply  Fri Aug 1 11:11:12 2014, Koji, Update, IOO, Current IMC servo configuration diagram.pdf
The comparison between the new and old MC servo (FSS part) was attached.
- The new servo has the same DC range as before. 
  Even though there is 1/2 gain in the chain now, the previous range of the FSS box was 0 to 10V.
Entry  Fri Aug 1 12:49:06 2014, Koji, Summary, IOO, MC servo analysis MC_OLTF.pdfMC_Error_Common.pdfMC_Crossover.pdfMC_CLTF_Fast.pdf
Reasoning to choose the current parameters:
FSS Common: 18dB
FSS Fast: 20dB
Entry  Fri Aug 1 22:56:27 2014, Koji, Update, General, Beam lost in the chamber??? 
I was investigating several issues on the IFO. As many of you noticed and not elogged, ITMX had frequent kicking without its oplev servo.
Also I had C1:LSC-TRY_OUT flatted out to zero even though I could see some fringes C1:SUS-ETMY_TRY_OUT.
Restarted all of the realtime models (no machine reboot).
    Reply  Sun Aug 3 23:47:56 2014, Koji, Update, General, Recovery efforts 
It's great that you guys found the beam. 
Yes, ITMX kick and lost communication for TRY were the motivation of my CDS rebooting.
    Reply  Wed Aug 6 12:44:52 2014, Koji, Update, ASC, POP QPD signals 
This is nice. Can we test this idea with POP22 + a razor blade?
Just to take transfer functions in PRMIsb between the PRM angle to POP QPD/POP22+razor blade
as well as the noise spectrum measurement are already useful.
    Reply  Wed Aug 6 21:22:09 2014, Koji, Update, IOO, FSS offset changed 
The fast feedback should be around zero now!
    Reply  Thu Aug 7 11:57:59 2014, Koji, Summary, IOO, MC servo analysis MC_OLTF_Fit.pdfIMC_OLTF.zipMC_OLTF_estimated.pdf
LISO Fit for the IMC open loop TF. The data and liso source for the fitting were attached in the ZIP file.
I noticed now that the open loop TF I measured has too less phase delay.
I used the closed loop TF to estimate the openloop TF.
    Reply  Fri Aug 8 18:08:12 2014, Koji, Summary, IOO, MC servo analysis 
The closed gain I meant is the AO path: Use IN2 to excite the MC loop and measure IN1 using MON2(?). 
In order to obtain the open loop gain from this meausrement, the gain mismatching needs to be compensated, though.
This measurement is to correctly predict the AO path response from the open loop transfer function.
    Reply  Sat Aug 9 14:35:28 2014, Koji, Summary, IOO, MC servo analysis MC_OLTF_Fit.pdfliso.zipMC_CLTF_Fit.pdfMC_CLTF_new.pdfMC_OLTF_new.pdf
Eric's OLTF turned out consistent with the AO path TF that has been measured by me on Jul 31 (entry
10322). 
    Reply  Mon Aug 11 22:07:31 2014, Koji, Summary, IOO, MC demod measurement 
SCLF-5!? It's surprising as the cut off of the OLTF is just above 1Hz. cf this entry
This means that not the demod board but MC or FSS boards seem to have large attenuation above 1MHz.
In this situation, does SCLF-10/10.7 really help us?
    Reply  Thu Aug 14 15:42:29 2014, Koji, Update, General, Updated game plan 
 - ALS
End PDH UGF improvement / post mixer LPF investigation (with in 2 weeks)
- MC/FSS
    Reply  Thu Aug 14 18:02:11 2014, Koji, Update, General, Updated game plan 
Got the idea of ASC.
- Oplevs for PR2, PR3 => PR2 seems OK. PR3 almost impossible. well turned out not too crazy. We need outside electronics.
- RF QPD => not trivial and very technical but possible. All outside work.
Entry  Mon Aug 18 09:42:50 2014, Koji, Summary, IOO, MCREFL PD charcterization MCREFLPD_transimpedance.pdfMCREFLPD_transimpedance_zoom.pdf
Riju did the measurement of the MCREFL PD.
I found data files in her directory on the control machine.
I was not sure how much was the transimpedance of the DC out.
    Reply  Wed Aug 27 09:12:47 2014, Koji, Update, IMC, WFS tuneup 
I'm sure that the 1~3Hz motion comes from the mirror motion, but not 100% sure what is causing 
the broad stochastic noise. If this is the beam jitter, this penetrates to the IFO via the WFS servos.
Is there any way to characterize this noise in order to compare it with the actual (estimated) motion of the mirrors?
Entry  Tue Sep 2 22:54:27 2014, Koji, Summary, LSC, phase tracker UGF 
FYI and FMI
Phase tracker UGF is  Q_AMP * G * 2 PI / 360 where Q_AMP is the amplitude of the Q_ERR output and G is the gain of the phase tracker.
For example: Q_AMP = 270, G = 4000\ => UGF = 1.9kHz
    Reply  Thu Sep 4 10:10:23 2014, Koji, Update, LSC, Recycling cavity lengths 
Com'on. This is just a 60ppm change of the mod frequency from the nominal. How can it change the recycling cav length by more than a cm?
https://wiki-40m.ligo.caltech.edu/IFO_Modeling/RC_lengths 
This describes how the desirable recycling cavity lengths are affected by the phase of the sidebands at non-resonant reflection of the arms.
Entry  Tue Sep 9 23:05:01 2014, Koji, Update, CDS, OTTAVIA lost network connection 
Today the network connection of OTTAVIA was sporadic.
Then in the evening OTTAVIA lost completely it. I tried jiggle the cables to recover it, but in vain.
We wonder if the network card (on-board one) has an issue.
Entry  Wed Sep 10 22:17:29 2014, Koji, Summary, LSC, X/Y green beat mode overlap measurement 
[Koji Manasa]
We made quantitative inspection of the X/Y green beat setup on the PSL table.
DC output of the BBPD for each arm was measured by blockiing the beams at either or both side of the recombination BS.
    Reply  Fri Sep 12 11:25:42 2014, Koji, Update, LSC, DRMI locking 
This is great.
And I got confused. Is REFL11 going through the CM board? 
If so how the demod phase for REFL11 take an effect for the sensing?
    Reply  Tue Sep 16 16:03:36 2014, Koji, Update, PSL, Laser turned on 


    
        
            Quote:
        
        
            

            Our janitor turned off the laser accidentally. 
Entry  Wed Sep 17 18:36:03 2014, Koji, HowTo, General, How to run DTT measurement automatically 

    Suppose you have a dtt template name test.xml
    The file test.dtt
    
    open
Entry  Thu Oct 2 20:54:45 2014, Koji, Update, IOO, IMC WFS measurements IMC_RIN_141002.pdfIMC_WFS_141002.pdf
[Eric Koji]
We made sensing matrix measurements for the IMC WFS and the MC2 QPD.
The data is under further analysis but here is some record of the current state to show
    Reply  Sun Oct 5 23:43:08 2014, Koji, Update, IOO, IMC WFS measurements 
There are several non scientific reasons.
    Reply  Mon Oct 13 16:57:26 2014, Koji, Update, CDS, Frame builder is mad 
CPU load seems extremely high. You need to reboot it, I think
controls@fb /proc 0$ cat loadavg
36.85 30.52 22.66 1/163 19295
ELOG V3.1.3-