40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 104 of 344  Not logged in ELOG logo
Entry  Mon Feb 11 17:54:02 2013, Koji, Summary, Optics, Curvature radii of the G&H/LaserOptik mirrors TT_Mirrors_RoC.pdf
    Reply  Wed Feb 13 19:30:45 2013, Koji, Summary, General, possible explanations to oval REFL beam 
    Reply  Fri Feb 15 16:09:19 2013, Koji, Update, General, beam traps ready to be installed HexBeamDump.pdfDiamondBeamDump2in.pdf
    Reply  Mon Feb 18 21:43:05 2013, Koji, Update, Alignment, POP path set up but AS55 is broken AS55.pdf
    Reply  Tue Feb 19 05:42:28 2013, Koji, Update, Electronics, POP path set up but AS55 is broken 
Entry  Tue Feb 19 08:42:31 2013, Koji, Update, VAC, ETMX door open 
    Reply  Thu Feb 21 21:12:42 2013, Koji, Update, VAC, pumpdown at 230 Torr 
    Reply  Sat Feb 23 14:04:07 2013, Koji, Update, Computers, apache retarted (Re: linux1 dead, then undead) 
Entry  Mon Feb 25 13:01:39 2013, Koji, Summary, General, Quick, compact, and independent tasks 
    Reply  Tue Feb 26 02:04:51 2013, Koji, Update, Locking, PRMI locked 
    Reply  Wed Feb 27 18:01:46 2013, Koji, Update, , Photodiode transimpedance 
    Reply  Thu Feb 28 03:41:31 2013, Koji, Update, LSC, PR gain ~ 25 from PRMI carrier lock 
    Reply  Wed Mar 6 09:44:29 2013, Koji, Update, LSC, PRMI locking for g-factor measurement 
    Reply  Wed Mar 6 22:11:19 2013, Koji, Update, Electronics, POX whitening was fine all along 
    Reply  Thu Mar 7 16:55:28 2013, Koji, Update, Locking, Erudite discussion on PRMI locking 
Entry  Sat Mar 9 19:29:27 2013, Koji, Update, PSL, Modulation depth mod_depth.pdf
Entry  Sun Mar 10 13:29:29 2013, Koji, HowTo, IOO, How to calculate the accumulated round-trip Gouy phase 
    Reply  Fri Mar 15 15:26:13 2013, Koji, Update, Green Locking, Yarm ALS laser is funny / dying 
    Reply  Mon Mar 18 13:10:19 2013, Koji, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF 
    Reply  Thu Mar 21 10:19:28 2013, Koji, Update, Locking, Finding the beat note 
Entry  Fri Mar 22 19:46:29 2013, Koji, Summary, LSC, Diode impedance test result 
    Reply  Tue Mar 26 01:40:49 2013, Koji, Update, IOO, Tuning MC length/FSR 
    Reply  Tue Mar 26 17:27:17 2013, Koji, Update, IOO, Tuning MC length/FSR 
    Reply  Tue Apr 2 11:08:16 2013, Koji, Update, LSC, PRMI lock 
    Reply  Wed Apr 3 18:27:03 2013, Koji, Update, , QPD Voltage Regulators 
    Reply  Thu Apr 4 10:46:54 2013, Koji, Summary, LSC, REFL55 error signals 
Entry  Mon Apr 22 11:26:25 2013, Koji, Configuration, CDS, some RT processes restarted 
Entry  Mon Apr 22 11:46:09 2013, Koji, Summary, IOO, MC locked/aligned. MC WFS offloading by ezcaservo 
Entry  Mon Apr 22 12:03:58 2013, Koji, Update, PSL, PMC aligned too 
    Reply  Wed Apr 24 00:44:33 2013, Koji, Update, SUS, PRMI locked, ITMX pitch OpLev ringing up 
Entry  Wed Apr 24 14:20:49 2013, Koji, Update, CDS, FE Web view not updated? 
    Reply  Wed Apr 24 18:51:12 2013, Koji, Configuration, optical tables, PD frequency response 
Entry  Thu Apr 25 10:19:10 2013, Koji, Summary, LSC, Locking activity on Apr 24th 
    Reply  Thu Apr 25 18:58:06 2013, Koji, Configuration, , PD frequency response 
Entry  Thu Apr 25 20:48:48 2013, Koji, Update, ASS, Den fixed the Yarm ASS scripts 
Entry  Sat Apr 27 00:21:06 2013, Koji, Update, LSC, Locking activity on Apr 26th Screenshot.png
Entry  Sat Apr 27 00:29:40 2013, Koji, Update, LSC, LSCoffset script fixed 
Entry  Mon Apr 29 22:13:41 2013, Koji, Update, LSC, Locking with ASDC Screenshot.png
Entry  Mon Apr 29 23:02:48 2013, Koji, Configuration, LSC, Questons 
Entry  Wed May 1 00:05:03 2013, Koji, Update, LSC, More stable lock of PRMI (REF33I and AS55Q) Screenshot.png
Entry  Thu May 2 00:34:57 2013, Koji, Update, LSC, locking Screenshot.pngScreenshot2.pngScreenshot3.png
    Reply  Fri May 3 01:24:25 2013, Koji, Update, ASS, Den fixed the Yarm ASS scripts 
    Reply  Tue May 7 10:30:32 2013, Koji, Update, Locking, PRM yaw responsible for RIN 
    Reply  Tue May 7 17:30:28 2013, Koji, Update, RF System, Ideal PRMI RF frequency 
Entry  Tue May 7 23:03:12 2013, Koji, Configuration, CDS, CDS work 
Entry  Wed May 8 18:33:02 2013, Koji, Update, ASS, YARM ASS - faster and more precise convergence YARM_ASS.pngScreenshot.png
    Reply  Wed May 8 22:36:42 2013, Koji, Update, ASS, XARM ASS (YARM ASS - faster and more precise convergence) XARM_ASS.png
Entry  Sat May 11 01:11:52 2013, Koji, Update, ASC, PRC mode stabilization with a shadow sensor at POP Screenshot.png130510_PRMI.pdf
Entry  Mon May 13 23:05:26 2013, Koji, Configuration, LSC, PRMI locking 130513_PRC_ASC.pdf130513_PRC_ASC_servo.pdf
    Reply  Tue May 14 02:19:13 2013, Koji, Update, Green Locking, Xend Green tweaked 
ELOG V3.1.3-