40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 104 of 344  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  8079   Wed Feb 13 19:30:45 2013 KojiSummaryGeneralpossible explanations to oval REFL beam>> "What has changed since:"
Recently
the REFL path has been rearranged
  
  8089   Fri Feb 15 16:09:19 2013 KojiUpdateGeneralbeam traps ready to be installedFor the hexagonal one, insert one of the
glass plate only half. Use a 1"x.5"
piece if exists.
 HexBeamDump.pdfDiamondBeamDump2in.pdf 
  8100   Mon Feb 18 21:43:05 2013 KojiUpdateAlignmentPOP path set up but AS55 is brokenI undertook the investigation of the AS55
PD.
I found the PD is not broken.
 AS55.pdf 
  8104   Tue Feb 19 05:42:28 2013 KojiUpdateElectronicsPOP path set up but AS55 is broken10010 Ohm for POP55 vs 50 Ohm for AS55
(cf. http://nodus.ligo.caltech.edu:8080/40m/4763)
I
  
  8106   Tue Feb 19 08:42:31 2013 KojiUpdateVACETMX door open[Steve, Yuta, Koji]
The ETMX heavy door was removed.
  
  8134   Thu Feb 21 21:12:42 2013 KojiUpdateVACpumpdown at 230 Torr[Rana, Yuta, Koji]
21:05 at the pressure of 10torr
V3 closed. RV1 manually closed. RPs
  
  8144   Sat Feb 23 14:04:07 2013 KojiUpdateComputersapache retarted (Re: linux1 dead, then undead)apache has been restarted. 
How to: search "apache"
on the 40m wiki
  
  8156   Mon Feb 25 13:01:39 2013 KojiSummaryGeneralQuick, compact, and independent tasks- IMC PDH demodulation phase adjustment
- Permanent setup for green transmission
DC PDs  on the PSL table
  
  8166   Tue Feb 26 02:04:51 2013 KojiUpdateLockingPRMI lockedOne of the biggest issues we had was that
any Q signals (i.e. the quadrature where
PRCL is absent.) of REFL11/33/55/(165) haven't
  
  8187   Wed Feb 27 18:01:46 2013 KojiUpdate Photodiode transimpedanceHow
much is the exact resonant frequency?
And 
  
  8198   Thu Feb 28 03:41:31 2013 KojiUpdateLSCPR gain ~ 25 from PRMI carrier lockVERY
GOOD! 
This is how the carrier lock PRMI
  
  8239   Wed Mar 6 09:44:29 2013 KojiUpdateLSCPRMI locking for g-factor measurement- What about normalizing POPDC to indicate
the carrier recycling gain?
- When you align the PMC, confirm
  
  8247   Wed Mar 6 22:11:19 2013 KojiUpdateElectronicsPOX whitening was fine all alongAt the time you, den and I worked together,
we could not lock the X-arm on TEM00 with
the FM1s of the POX11 on.
  
  8251   Thu Mar 7 16:55:28 2013 KojiUpdateLockingErudite discussion on PRMI lockingPRMI for the sidebands may have different
situation. Investigate our wiki to find our
the simulation result.
  
  8264   Sat Mar 9 19:29:27 2013 KojiUpdatePSLModulation depthLast night I measured the modulation depth
of the MC incident beam.

Method:
 mod_depth.pdf 
  8265   Sun Mar 10 13:29:29 2013 KojiHowToIOOHow to calculate the accumulated round-trip Gouy phaseHow to calculate the accumulated round-trip
Gouy phase (and namely the transverse mode
spacing) of a general cavity
  
  8301   Fri Mar 15 15:26:13 2013 KojiUpdateGreen LockingYarm ALS laser is funny / dyingI took a look at the laser. It is probably
the LD TEC (DTEC) failure.
As the temperature of the LD (DTMP)
  
  8306   Mon Mar 18 13:10:19 2013 KojiBureaucracyAuxiliary lockingYend table upgrade - go fetch NPRO from ATF1) Annalisa is going to start  working
on mode profiling and beat note search for
the old MOPA NPRO.
  
  8323   Thu Mar 21 10:19:28 2013 KojiUpdateLockingFinding the beat noteGive us more info on the elog:

What PD are you using? How much power
  
  8332   Fri Mar 22 19:46:29 2013 KojiSummaryLSCDiode impedance test resultI've tested Perkin-Elmer InGaAs PDs at
OMC Lab.
- The diode impedances were measured
  
  8349   Tue Mar 26 01:40:49 2013 KojiUpdateIOOTuning MC length/FSRI'm still waiting for the follow-up analysis
of the modulation freq tuning.
  
  8357   Tue Mar 26 17:27:17 2013 KojiUpdateIOOTuning MC length/FSRPlease add the discussions on the cavity
absolute length (and its change, adjustment
precision),
  
  8388   Tue Apr 2 11:08:16 2013 KojiUpdateLSCPRMI lock> The two REFL55 signals
Wow! It's a good news.
I think this is our first ever lock
  
  8406   Wed Apr 3 18:27:03 2013 KojiUpdate QPD Voltage RegulatorsBreadboards may not be suitable for a reliable
work. Why don't you switch to any protoboard
and real soldering?
  
  8413   Thu Apr 4 10:46:54 2013 KojiSummaryLSCREFL55 error signalsBeautiful double peaks. I don't see the
triple zero-crossings. Is this because you
adjusted the phase correctly (as predicted)?
  
  8468   Mon Apr 22 11:26:25 2013 KojiConfigurationCDSsome RT processes restartedWhen I came to the 40m, I found most of
the FB signals are dead.
The suspensions were not dumped but
  
  8469   Mon Apr 22 11:46:09 2013 KojiSummaryIOOMC locked/aligned. MC WFS offloading by ezcaservoЕру ьс шы
тщц дщслув
фтв фдшптувю
  
  8470   Mon Apr 22 12:03:58 2013 KojiUpdatePSLPMC aligned tooPMC aligned. C1:PSL-PMC-PMCTRANSPD improved
from 0.72ish to 0.835ish.
  
  8482   Wed Apr 24 00:44:33 2013 KojiUpdateSUSPRMI locked, ITMX pitch OpLev ringing upI tried to reproduce the locking situation
described in this
entry tonight.
  
  8483   Wed Apr 24 14:20:49 2013 KojiUpdateCDSFE Web view not updated?The FE web view seems not up-to-date, does
it? ( maybe for a year)
https://nodus.ligo.caltech.edu:30889/FE/c1mcs_slwebview_files/index.html
  
  8487   Wed Apr 24 18:51:12 2013 KojiConfigurationoptical tablesPD frequency responseThe fibers should be routed beneath the
electrical cables. 
They should be fixed on the table
  
  8491   Thu Apr 25 10:19:10 2013 KojiSummaryLSCLocking activity on Apr 24thLast night I worked on the several locking
configurations:
  
  8493   Thu Apr 25 18:58:06 2013 KojiConfiguration PD frequency responseNo.... what I told was to put the roll
next
to the splitter, 
  
  8494   Thu Apr 25 20:48:48 2013 KojiUpdateASSDen fixed the Yarm ASS scriptsI contacted Den about malfunctioning of
the Yarm ASS.
He found the scripts were modified
  
  8500   Sat Apr 27 00:21:06 2013 KojiUpdateLSCLocking activity on Apr 26thWhen I talked with Den via phone, he recommended
to use the trigger and normalization with
POP110I.
 Screenshot.png 
  8501   Sat Apr 27 00:29:40 2013 KojiUpdateLSCLSCoffset script fixedPrior to the locking trials...
scripts/LSC/LSCoffset script
  
  8508   Mon Apr 29 22:13:41 2013 KojiUpdateLSCLocking with ASDCToday the locking was not as easy as that
was last Friday.
So I tried something new. Today Rana
 Screenshot.png 
  8509   Mon Apr 29 23:02:48 2013 KojiConfigurationLSCQuestonsQ. How much Schnupp asymmetry we want in
order to improve the signal ratio between
PRCL/MICH in REFL ports?
  
  8517   Wed May 1 00:05:03 2013 KojiUpdateLSCMore stable lock of PRMI (REF33I and AS55Q)[Jenne Koji]
- Today the spots were moving more
than the usual. The OPLEV screens showed
 Screenshot.png 
  8521   Thu May 2 00:34:57 2013 KojiUpdateLSClocking- Routine alignment
Locked the arm cavties. Ran ASS.
As this was not enough precise alignment
 Screenshot.pngScreenshot2.pngScreenshot3.png 
  8525   Fri May 3 01:24:25 2013 KojiUpdateASSDen fixed the Yarm ASS scriptsOutput matrices are added to ASS. Currently
ASS is based on the mirror bases.
I prefer to have the actuator bases
  
  8535   Tue May 7 10:30:32 2013 KojiUpdateLockingPRM yaw responsible for RIN

    

       
            
  
  8539   Tue May 7 17:30:28 2013 KojiUpdateRF SystemIdeal PRMI RF frequencyTo change the MC length is not the point.
If we can improve the length sensing
by the intentional shift of the modulation
  
  8547   Tue May 7 23:03:12 2013 KojiConfigurationCDSCDS workSummary:
c1rfm / c1lsc / c1ass / c1sus were
  
  8552   Wed May 8 18:33:02 2013 KojiUpdateASSYARM ASS - faster and more precise convergencePrecise arm alignment is more demanded.
as the PRMI locking requires good and reliable
alignment of the ITMs.
 YARM_ASS.pngScreenshot.png 
  8554   Wed May 8 22:36:42 2013 KojiUpdateASSXARM ASS (YARM ASS - faster and more precise convergence)Same ASS setup for the X arm has been
done.
Now
 XARM_ASS.png 
  8562   Sat May 11 01:11:52 2013 KojiUpdateASCPRC mode stabilization with a shadow sensor at POPAh, AWESOME.
Indefinite PRMI lock was finally achieved.
 Screenshot.png130510_PRMI.pdf 
  8566   Mon May 13 23:05:26 2013 KojiConfigurationLSCPRMI locking- Disabled MCL path in mcdown/mcupscript.
Nominal gain in mcdown/mcup was -50
and -100 respectively.
 130513_PRC_ASC.pdf130513_PRC_ASC_servo.pdf 
  8570   Tue May 14 02:19:13 2013 KojiUpdateGreen LockingXend Green tweakedNote that I'm supposed to return one of
the two green beat PDs and the power supply.
  
  8574   Tue May 14 20:27:19 2013 KojiConfigurationLSCOpenloop gain for PRMI lock May 13The OLTFs for PRCL and MICH for the last
night's lock were modelled using Yuta's python
script.
 LSCPRCLOLTF.pngLSCMICHOLTF.png130513.zip 
ELOG V3.1.3-