40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 1 of 326  Not logged in ELOG logo
IDdown Date Author Type Category Subject Text Attachments
  16423   Fri Oct 22 17:35:08 2021 Ian MacMillanSummaryPEMParticle counter setup near BS ChamberI have done some reading about where would
be the best place to put the particle counter.
The ISO standard (14644-1:2015) for
  
  16422   Thu Oct 21 15:24:35 2021 ranaSummaryPEMParticle counter setup near BS Chamberrethinking what I said on Wednesday - its
not a good idea
to put the particle counter on a vac chamber
  
  16421   Thu Oct 21 15:22:35 2021 ranaSummaryPEMParticle counter setup near BS ChamberSVG doesn't work in my browser(s).
Can we use PDF as our standard for all graphics
other than photos (PNG/JPG) ?
  
  16420   Thu Oct 21 11:41:31 2021 AnchalSummaryPEMParticle counter setup near BS ChamberThe particle count channel names were changes
yesterday to follow naming conventions used
at the sites. Following are the new names:
 ParticleCountData20211021.pdf 
  16419   Thu Oct 21 11:38:43 2021 JordanUpdateSUSStandoffs for Side Magnet on 3" Adapter Ring SOS AssemblyI had 8 standoffs made at the Caltech chemistry
machine shop to be used as spacers for the
side magnets on the 3" Ring assembly.
 Magnet_Standoffs.jpg 
  16418   Wed Oct 20 15:58:27 2021 KojiUpdateVACHow to vent TP1Probably the hard disk of c0rga is dead.
I'll follow up in this elog later today.

Looking at the log in /opt/rtcds/caltech/c1/scripts/RGA/logs
  
  16417   Wed Oct 20 11:48:27 2021 AnchalSummaryCDSPower supple configured correctly.This was horrible! That's my bad, I
should have checked the configuration before
assuming that it is right.
  
  16416   Wed Oct 20 11:16:21 2021 AnchalSummaryPEMParticle counter setup near BS ChamberI have placed a GT321 particle counter
on top of the MC1/MC3 chamber next to the
BS chamber. The serial cable is connected
 PXL_20211020_183728734.jpg 
  16415   Tue Oct 19 23:43:09 2021 KojiSummaryCDSc1sus2 DAC to ADC test(Because of a totally unrelated reason)
I was checking the electronics units for
the upgrade. And I realized that
 P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg 
  16414   Tue Oct 19 18:20:33 2021 Ian MacMillanSummaryCDSc1sus2 DAC to ADC testI ran a DAC to ADC test on c1sus2 channels
where I hooked up the outputs on the DAC
to the input channels on the ADC. We used
 data3_Plots.pdfdata2_Plots.pdf 
  16413   Tue Oct 19 11:30:39 2021 KojiUpdateVACHow to vent TP1I learned that TP1 was vented through the
RGA room in the past. This can be done by
opening VM2 and a manual valve ("needle
 Screen_Shot_2021-10-18_at_14.52.34.png 
  16412   Tue Oct 19 10:59:09 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Yehonathan, Anchal,
Koji]

North door of the BS chamber opened
  
  16411   Mon Oct 18 16:48:32 2021 TegaUpdateElectronicsSat Amp modifications[S2100738, S2100745, S2100751] Completed
three more Sat Amp units modification with
seven remaining.
 IMG_20211018_162918574.jpg 
  16410   Mon Oct 18 10:02:17 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Anchal, Koji]

- Checked the main volume is isolated.
- TP1 and TP2 were made isolated from
 Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png 
  16409   Fri Oct 15 20:53:49 2021 KojiSummaryGeneralVent PrepFrom
the IFO point of view, all look good and
we are ready for venting from Mon Oct 18
  
  16408   Fri Oct 15 17:17:51 2021 KojiSummaryGeneralVent PrepI took over the vent prep: I'm going
through the list in [ELOG
15649] and [ELOG
 7x 
  16407   Fri Oct 15 16:46:27 2021 AnchalSummaryOptical LeversVent PrepI centered all the optical levers on ITMX,
ITMY, ETMX, ETMY, and BS to a position where
the single arm lock on both were best aligned.
 Screen_Shot_2021-10-15_at_4.34.45_PM.pngScreen_Shot_2021-10-15_at_4.45.31_PM.pngScreen_Shot_2021-10-15_at_4.34.45_PM.pngScreen_Shot_2021-10-15_at_4.34.45_PM.png 
  16406   Fri Oct 15 12:14:27 2021 Ian MacMillanUpdateGeneralKicking optics in freeSwing measurment[Ian, Anchal]

we ran the free swinging test last
night and the results match up with in 1/10th
 20211015_Kicktest_plot.pdf 
  16405   Thu Oct 14 20:16:22 2021 YehonathanUpdateGeneralPRMI free swinging{Yehonathan, Raj}

We aligned the IFO in the PRMI
state and let it swing freely.
  
  16404   Thu Oct 14 18:30:23 2021 KojiSummaryVACFlange/Cable Stand ConfigurationFlange Configuration for BHD

We will need total 5 new
cable stands. So Qty.6 is the number to be
 40m_flange_layout_20211014.pdf 
  16403   Thu Oct 14 16:38:26 2021 Ian MacMillanUpdateGeneralKicking optics in freeSwing measurment[Ian, Anchal]

We are going to kick the optics
tonight at 2am.
  
  16402   Thu Oct 14 13:40:49 2021 YehonathanSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsHere is a side by side comparison of the
PRMI sensing matrix using PRM/BS actuation
(attachment 1) and ITMs actuation (attachment
 BSPRM_Actuation_Radar_plots.pngITM_Actuation_Radar_plots.png 
  16401   Thu Oct 14 11:25:49 2021 YehonathanUpdatePSLPMC unlocked{Yehonathan, Anchal}

I went to get a sandwich around
10:20 AM and when I came back BS was moving
 BS_OSEM_Sensor_PSD.pdfBS_OSEM_Sensor_PSD_AfterReconnectingCables.pdf 
  16400   Thu Oct 14 09:28:46 2021 YehonathanUpdatePSLPMC unlockedPMC has been unlocked since ~ 2:30 AM.
Seems like the PZT got saturated. I moved
the DC output adjuster and the PMC locked
  
  16399   Wed Oct 13 15:36:38 2021 HangUpdateCalibrationXARM OLTFWe did a few quick XARM oltf measurements.
We excited C1:LSC-ETMX_EXC with a broadband
white noise upto 4 kHz. The timestamps for
 Screenshot_2021-10-13_15-32-16.png 
  16398   Wed Oct 13 11:25:14 2021 AnchalSummaryCDSRan c1sus2 models in martian CDS. All good!Three extra steps (when adding
new models, new FE):


Chris
pointed out that the sudo command in c1sus2
 CDS_screens_running.png 
  16397   Tue Oct 12 23:42:56 2021 KojiSummaryCDSConnected c1sus2 to martian networkDon't you need to add the new
hosts to /diskless/root/etc/rtsystab at fb1?
--> There looks many elogs talking about
  
  16396   Tue Oct 12 17:20:12 2021 AnchalSummaryCDSConnected c1sus2 to martian networkI connected c1sus2 to the martian network
by splitting the c1sim connection with a
5-way switch. I also ran another ethernet
  
  16395   Tue Oct 12 17:10:56 2021 AnchalSummaryCDSSome more informationChris pointed out some information displaying
scripts, that show if the DAQ network is
working or not. I thought it would be nice
  
  16394   Tue Oct 12 16:39:52 2021 ranaSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsshould compare side by side with the ITM
PRMI radar plots to see if there is a difference.
How do your new plots compare with Gautam's
  
  16393   Tue Oct 12 11:32:54 2021 YehonathanSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsLate submission (From Thursday 10/07):

I measured the PRMI sensing matrix
to see if the BS and PRMI output matrices
 modified_output_matrices_radar_plots.pngnormal_output_matrices_radar_plots.png 
  16392   Mon Oct 11 18:29:35 2021 AnchalSummaryCDSMoving forward?The teststand has some non-trivial issue
with Myrinet card (either software or hardware)
which even teh experts are saying they don't
  
  16391   Mon Oct 11 17:31:25 2021 AnchalSummaryCDSFixed mounting of mx devices in fb. daqd_dc is running now.

  
  16390   Mon Oct 11 13:59:47 2021 HangUpdateSUSMore PRM L2P measurementsWe report here the analysis results for
the measurements done in elog:16388. 
 prm_l2p_tf_meas_white.pdfprm_l2p_tf_meas_opt.pdfprm_l2p_fisher_vs_data_white_vs_opt.pdfprm_l2p_Pxx_evol_v2.pdf 
  16389   Mon Oct 11 11:13:04 2021 ranaUpdateSUSMore PRM L2P measurementsFor the oplev, there are DQ channels you
can use so that its possible to look back
in the past for long measurements. They have
  
  16388   Fri Oct 8 17:33:13 2021 HangUpdateSUSMore PRM L2P measurements[Raj, Hang]

We did some more measurements on
the PRM L2P TF. 
 Screenshot_2021-10-08_17-30-52.png 
  16387   Thu Oct 7 02:04:19 2021 KojiUpdateElectronicsSatellite amp adapter chassisThe 4 units of Satellite Amp Adapter were
done:
- The ears were fixed with the screws
 P_20211006_205044.jpg 
  16386   Wed Oct 6 16:31:02 2021 TegaUpdateElectronicsSat Amp modifications[Tega, Koji]

(S2100737) - Debugging showed
that the opamp, AD822ARZ, for PD2 circuit
  
  16385   Wed Oct 6 15:39:29 2021 AnchalSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsNote that your tests were done with the
output matrix for BS and PRM in the compensated
state as done in 40m/16374.
  
  16384   Wed Oct 6 15:04:36 2021 HangUpdateSUSPRM L2P TF measurement & Fisher matrix analysis[Paco, Hang]

Yesterday afternoon Paco and I
measured the PRM L2P transfer function.
 prm_l2p_tf_meas.pdfprm_l2p_fisher_vs_data.pdfprm_l2p_Pxx_evol.pdfprm_l2p_fisher_evol.pdf 
  16383   Tue Oct 5 20:04:22 2021 PacoSummarySUSPRM and BS Angular Actuation transfer function magnitude measurements[Paco, Rana]

We had a look at the BS actuation.
Along the way we created a couple of issues
  
  16382   Tue Oct 5 18:00:53 2021 AnchalSummaryCDSc1teststand time synchronization working nowToday I got a new router that I used to
connect the c1teststand, fb1 and chiara.
I was able to see internet access in c1teststand
  
  16381   Tue Oct 5 17:58:52 2021 AnchalSummaryCDSc1teststand problems summaryopen-mx service is running successfully
on the fb1(clone), c1bhd and c1sus.

  
  16380   Tue Oct 5 17:01:20 2021 KojiUpdateElectronicsSat Amp modificationsMake sure the inputs for the PD amps are
open. This is the current amplifier and we
want to leave the input pins open for the
  
  16379   Mon Oct 4 21:58:17 2021 TegaUpdateElectronicsSat Amp modificationsTrying to finish 2 more Sat Amp units so
that we have the 7 units needed for the X-arm
install. 
  
  16378   Mon Oct 4 20:46:08 2021 KojiUpdateElectronicsSatellite amp box adaptersThanks. You should be able to find the
chassis-related hardware on the left side
of the benchtop drawers at the middle workbench.
  
  16377   Mon Oct 4 18:35:12 2021 PacoUpdateElectronicsSatellite amp box adapters[Paco]

I have finished assembling the
1U adapters from 8 to 5 DB9 conn. for the
 pcb_no_flush.jpg1U_assembly.jpgfourunits.jpg 
  16376   Mon Oct 4 18:00:16 2021 KojiSummaryCDSc1teststand problems summaryI don't know anything about
mx/open-mx, but you also need open-mx,don't
you?
  
  16375   Mon Oct 4 16:10:09 2021 ranaSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsnot sure that this is necessary.
If you look at teh previous entries Gautam
made on this topic, it is clear that the
  
  16374   Mon Oct 4 16:00:57 2021 YehonathanSummarySUSPRM and BS Angular Actuation transfer function magnitude measurements{Yehonathan, Anchel}

In an attempt to fix the actuation
of the PRMI DOFs we set to modify the output
 BS_PRM_ANG_ACT_TF_20211004.pdfBS_out_mat_20211004.txtPRM_out_mat_20211004.txt 
ELOG V3.1.3-