    Reply  Fri Sep 23 14:10:19 2022, Radhika, Update, BHD, BH55 RFPD installed - part I IMG_3766.jpegIMG_3770.jpegIMG_3773.jpeg
[Radhika, Paco, Anchal]

I placed a lens in the B-beam path to focus the beam spot onto the RFPD [Attachment 1]. To align the beam spot onto the
RFPD, Anchal misaligned both ETMs and ITMY so that the AS and LO beams would not interfere, and the PD output would remain at some DC level (not
    Reply  Fri Sep 23 18:31:46 2022, rana, Update, BHD, BH55 RFPD installed - part I 
A design flaw in these initial LIGO RFPDs is that the SMA connector is not strain releieved by mounting to the case. Since it is only mounted to the
tin can, when we attach/remove cables, it bends the connector, causing stress on the joint.

To get around this, for this gold box RFPD, connect the SMA connector to the PCB using a S shaped squiggly wire. Don't use multi-strand:
    Reply  Fri Sep 23 19:04:12 2022, Anchal, Update, BHD, BH55 LSC Model Updates - part III 
BH55

I further updated LSC model today with following changes:


BH55 whitening switch binary output signal is now routed to correct place.

Switching FM1 which carries dewhitening digital
filter will always switch on corresponding analog whitening before ADC input.


The whitening can be triggered using LSC trigger
    Reply  Fri Sep 23 19:07:03 2022, Tega, Update, Computers, Work to improve stability of 40m models running on teststand  dolphin_state_all_green.pngdolphin_state_IPC_glitch.png
[Chris, Tega]

Timing glitch investigation:


Moved dolphin transmit node from c1sus to c1lsc bcos we suspect that
the glitch might be coming from the c1sus machine (earlier c1pem on c1sus was running faster then realtime).
Installed and started c1oaf to