Entry  Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
[Tega, Yehonathan, Koji, Yuta]

We tried to align AS path this afternoon.
    Reply  Wed May 4 13:09:42 2022, Anchal, Update, BHD, IMC table balanced again, IMC is locking, YARM is locking 
[Paco, JC, Anchal]

We balanced the IMC table back again to point that got us 50% of nominal transmission from IMC. Then we tweaked the steering mirror for injection
to IMC to get up to 90% of nominal transmission. Finally, we used WFS servo loop to get to the 100% nominal transmission from IMC. However, we found that
       Reply  Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing IFO_XY_ARMS_Flashing.png
[Yuta, Tega]

We aligned the BS, ITMY, and ETMY PIT and YAW to get the flashing on X-arm whilst also keeping the flashing of Y-arm. From attachment 1, it is
clear that POXDC photodiode is not receiveing any light, so our next task is to work on POX alignment.
          Reply  Wed May 4 18:52:43 2022, Tega, Update, BHD, POP beam too high at POP SM4 on the ITMX chamber snnp_pr2_pr3_itmy_aligment.png
[Yuta, Tega]

We needed to sort out the POXDC signal so we could work on X-arm alignment. Given that POXDC channel value was approx 6 compared to POYDC value
of approx. 180, we decided to open the ITMX chamber to see if we could improve the situation. We worked on the alignment of POX beam but could not improve
             Reply  Thu May 5 14:46:22 2022, Anchal, Update, BHD, POP beam height lowered, POP_SM4 raised 
[Anchal, JC]

We first aligned the single arm cavity resonance for both arms to get maximum flashing. As we opened the chamber, I found that the POP beam was
mostly hitting the POP_SM4 mirror but was clipping about 2 mm on the top edge.
                Reply  Thu May 5 17:05:31 2022, Tega, Update, BHD, IMC & X/Y-arm alignment IFO_aligment_Y_locking_on.png
[Yuta, Tega]

In order to setup POP camera and RFPD on the ITMX table, we decided to first work on the IMC and X/Y-arm alignment.

 
                Reply  Mon May 9 18:43:03 2022, Anchal, Update, BHD, ITMX table layout corrected 
As I went to correct the ITMX Oplev mirrors, I found that both mirrors were placed in very different positions than the design position. Part of the
reason I think was to preserve outside oplev path, and party because a counterweight was in ITMXOL1 position. I had to do following steps to correct this:


I noted down level meter readings of the table before making any changes.
I removed the counter weight from near the center
                   Reply  Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table IMG_20220509_184439943.jpgIMG_20220509_184154722.jpg
[Paco, Tega]

Started work on the relocating the green transmission optics, cameras and PDs. Before removing the any of the optics, we checked and confirmed
that the PDs and Cams are indeed connected to the GRN TRX/Y medm channels. Then added labels to the cables before moving them.
                      Reply  Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table IMG_0741.jpegIMG_0753.jpeg
[JC, Tega]

Tega and I cleaned up the BS OPLEV Table and took out a couple of mirrors and an extra PD. The PD which was removed is "IP-POS - X/Y  Reversed".
In addition to this, the cable is zip-tied to the others located on the outside of the table in case this is required later on. 
                         Reply  Tue May 10 18:25:43 2022, Paco, Update, BHD, Green Transmission path 
[Yuta, Paco]

We installed GRX_SM1, GRX_SM2, and finished aligning the GRY_SM1, and GRY_SM2
steering mirrors in the BS and IMC Chambers. GRY_SM1 was slightly misplaced (by ~ 2 inches), so we had to move it slightly. Luckily this
                   Reply  Tue May 10 16:31:14 2022, Tega, Update, BHD, ITMX optlev return beam steered to QPD 
Followed the steps below to complete the ITMX optlev installation. The ITMX optlev return beam now reaches its QPD without being blocked by the input
steering mirror.

Although, I centered the ITMX optlev readout, this was not done when the XARM flashing is maximized bcos the IMC chamber was being worked on,
       Reply  Fri May 6 13:48:34 2022, Anchal, Update, BHD, WFS loop instability fixed 
[Yuta, Anchal]

We investigated why WFS loop wasn't working. It seemed like WFS1 PIT error signal has a huge offset which would push the loop to misalign
all optics' PIT. So we did the following steps:
    Reply  Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment AS.JPGOMCchamber.JPG
[Yuta, Tega]

We finally managed to steer the AS beam from ITMY chamber, through BS and IMC chambers, to the in-air AP table.

We moved the AS5 mirror north to its nominal position and we also moved the ASL lens on BS chamber back to its nominal position. Attached photos
       Reply  Thu May 12 20:11:18 2022, Anchal, Update, BHD, BHDBS Output beams steered out to ITMY table signal-2022-05-12-201844.jpeg
I successfully steered out the two output beams from BHD BS to ITMY table today. This required significant changes on the table, but I was able to bring
back the table to balance coarsely and then recover YARM flashing with fine tuning of ITMY.


The counterweights were kept at the North end of the table which was in way of one of the output beams of BHD.
So I saved
          Reply  Thu May 12 20:24:29 2022, yuta, Update, BHD, POX and POY investigation POY.JPG
[Anchal, Yuta]

We checked POX and POY RF signal chains for sanity check since Xarm cannot be locked in IR stably as opposed to Yarm.
       Reply  Mon May 16 13:22:59 2022, yuta, Update, BHD, REFL and AS paths aligned at AP table REFLPOP.JPGPOPAS.JPG
After Xarm and Yarm were aligned by Anchal et al, I aligned AS and REFL path in the AP table.
REFL path was alreasy almost perfectly aligned.

REFL path
          Reply  Mon May 16 19:14:17 2022, Anchal, Update, BHD, Camera set on AS path and BHDBS output path 
[Anchal, Paco, Yuta]


We aligned AS path avoiding any clipping to the AP table where we setup a camera with a lens.

To do this we had to move
AS6 in North direction for ~1cm.
The Injection table was imbalanced by this move to drop the IMC transmission to half.
We did not
             Reply  Tue May 17 18:43:38 2022, Anchal, Update, BHD, Placed SRM in ITMY Chamber 
[Anchal, Paco, Yuta]

SRM Placement


SRM was moved from its parked location to the nominal position in the ITMY chamber.
This
imbalanced the table a lot as all SOS towers ended up on the south side of the table.
I needed additionally three SOS tower side walls to recover
Entry  Thu Apr 7 11:47:22 2022, Yehonathan, Update, BHD, Initial BHD modeling: AS - LO mode matching 


I begin modeling the initial BHD setup using Finesse. I started with copying C1_w_BHD.kat from the 40m/bhd
repo and making changes to reflect the current BHD setup:
    Reply  Thu Apr 7 21:15:04 2022, Yehonathan, Update, BHD, Initial BHD modeling: AS - LO mode matching 
Ok, it turns out these optics were purchased on purpose, as this elog shows. Jon considered
building a mode-matching telescope with stock optics as an initial step before purchasing the custom optics (referred to as "design" optics in
my elog).
       Reply  Mon May 16 16:13:01 2022, Yehonathan, Update, BHD, Initial BHD modeling: Damped suspension model Damped_SUS.pngETMY_SUSPOS_GOL.pdfSUS_Response.png
I was finally able to set up a stable suspension model with the help of Yuta and I'm now ready to start doing some MICH noise budgeting with
BHD readout. (Tip: turns out that in the zpk function in Matlab you should multiply the poles and zeros by -2*pi to match the zpk TFs in Foton)

I copied all the filters from the suspension MEDM screens into a Matlab. Those filters were concatenated with a single pendulum suspension TF
Entry  Mon May 16 14:46:35 2022, Tommy, Update, Electronics, RFSoC MTS Work 
We followed the manual's guide for setting up MTS to sync on external signal. In the xrfdc package, we update the RFdc class to have RunMTS, SysRefEnable,
and SysRefDisable functions as prescribed on page 180 of the manual. Then, we attempted to run the new functions in the notebook and read the DAC signal
outputs on an oscilloscope. The DACs were not synced. We were also unable to get FIFOlatency readings. 
Entry  Sat May 14 08:36:03 2022, Chris, Update, DAQ, DAQ troubleshooting 
I heard a rumor about a DAQ problem at the 40m.

To investigate, I tried retrieving data from some channels under C1:SUS-AS1 on the c1sus2 front end. DQ channels worked fine, testpoint channels
did not. This pointed to an issue involving the communication with awgtpman. However, AWG excitations did work. So the issue seemed to be specific to the
    Reply  Mon May 16 10:49:01 2022, Anchal, Update, DAQ, DAQ troubleshooting 
[Anchal, Paco, JC]

Thanks Chris for the fix. We are able to access the testpoints now but we started facing another issue this morning, not sure how it is related
to what you did.
       Reply  Mon May 16 12:59:27 2022, Chris, Update, DAQ, DAQ troubleshooting timeseries.pngerr.png
It looks like the RFM problem started a little after 2am on Saturday morning (attachment 1). It’s subsequent to what I did, but during a time of
no apparent activity, either by me or others.

The pattern of errors on c1rfm (attachment 2) looks very much like this one previously
Entry  Fri May 13 14:26:00 2022, JC, Update, Alignment, LO2 Beam 
[Yehonathan, JC]

Yehonathan and I attempted to align the LO2 beam today through the BS chamber and ITMX Chamber. We found the LO2 beam was blocked by the POKM1
Mirror. During this attempt, I tapped TT2 with the Laser Card. This caused the mirror to shake and dampen into a new postion. Afterwards, when putting
    Reply  Fri May 13 18:42:13 2022, Paco, Update, Alignment, ITMX and ITMY sat amp failures 
[Yuta, Anchal, Paco]

As described briefly by JC, there were multiple failure modes going during this work segment. 
Entry  Thu May 12 13:46:59 2022, Jc, Update, Alignment, POP Beam IMG_0777.jpeg
[Tega, JC]

Tega and I went in to adjust the POP being in the ITMX Table. The beam entered the table high, so we adjusted the this by adding mirrors
(The highlighted in Turqoise are mirrors which adjust the pitch of the beam). All the mirrors are set and
    Reply  Thu May 12 17:20:08 2022, Paco, Update, Alignment, POP Beam on CCD PXL_20220513_002047233.jpg
[Paco]

Got POP beam centered on camera and nominally on the two PDs. Attachment #1 shows "carrier" camera.
Entry  Wed May 11 15:49:42 2022, JC, Update, OPLEV Tables, Green Beam OPLEV Alignment IMG_0770.jpeg
[Paco, JC]

Paco and I began aligning the Green Beam in the BS Oplev Table. while aligning the GRN-TRX, the initial beam was entering the table a bit low.
To fix this, Paco went into the chamber and correcting the pitch with the steering mirror. The GRN-TRX is now set up, both the PD and Camera. Paco is continuing
Entry  Mon May 9 22:19:06 2022, Koji, Update, BHD, BHD Platform Progress status Screenshot_2022-05-09_220220.pngScreenshot_2022-05-09_222405.png
[Don, Koji]

Don is working on finalizing the BHD Platform design. All the components on the BHD platform are almost populated and aligned.

Don is still working on the table legs so that we can detach the legs when we need to float the table in the future.
    Reply  Mon May 9 23:18:44 2022, Koji, Update, BHD, BHD Platform Progress status 6x
I quickly ran the FEA model to check the resonant freqs of the BHD platform.
The boundary conditions were:


The platform was not loaded
FIxed constraints were given to the five legs


Don has optimized the cut-out
Entry  Mon Sep 20 15:42:44 2021, Ian MacMillan, Summary, Computers, Quantization Code Summary 472px-Typical_State_Space_model.svg.pngBiquad_filter_DF-IIx.svg.pngSS-IIR-TF.pdf
This post serves as a summary and description of code to run to test the impacts of
quantization noise on a state-space implementation of the suspension model.

Purpose: We want to use a state-space model in our suspension plant code. Before we can do this we want to test to see if the state-space model
    Reply  Wed Sep 22 14:22:35 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary IIR64-bitnoisespectrum.pdf
Now that we have a model of how the SS and IIR filters work we can get to the problem of how to measure the quantization noise in each of the systems. Den
Martynov's thesis talks a little about this. from my understanding: He measured quantization noise by having two filters using two types of variables
with different numbers of bits. He had one filter with many more bits than the second one. He fed the same input signal to both filters then recorded their
       Reply  Mon Sep 27 12:12:15 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary 
I have not been able to figure out a way to make the system that Aaron and I talked about. I'm not even sure it is possible to pull the information
out of the information I have in this way. Even the book uses a comparison to a high precision filter as a way to calculate the quantization noise:


"Quantization noise in digital filters can be studied in simulation by comparing the behavior of the actual quantized digital
          Reply  Mon Sep 27 16:03:15 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary DeltaNoiseSpectrum.pdf
I have coded up the procedure in the previous post: The result does not look like what I would expect. 

As shown in Attachment1 I have the power spectrum of the 32-bit output and the 64-bit output as well as the power spectrum of the two subtracted
time series as well as the subtracted power spectra of both. unfortunately, all of them follow the same general shape of the raw output of the filter. 
             Reply  Mon Sep 27 17:04:43 2021, rana, Summary, Computers, Quantization Noise Calculation Summary 
I suggest that you


change the corner frequency to 10 Hz as I suggested last week. This filter, as it is, is going to give you trouble.
Put in
a sine wave at 3.4283 Hz with an amplitude of 1, rather than white noise. In this way, its not necessary to do any subtraction. Just make PSD of the output
                Reply  Thu Sep 30 11:46:33 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary SS-IIR-Bode.pdfPSD_32bit.pdfPSD_64bit.pdf
First and foremost I have the updated bode plot with the mode moved to 10 Hz. See Attachment 1. Note that the comparison measurement is a % difference
whereas in the previous bode plot it was just the difference. I also wrapped the phase so that jumps from -180 to 180 are moved down. This eliminates massive
jumps in the % difference. 
                   Reply  Wed Nov 24 11:02:23 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary PSD_IIR_all.pdf
I added mpmath to the quantization noise code. mpmath allows me to specify the precision that I am using in calculations.
I added this to both the IIR filters and the State-space models although I am only looking at the IIR filters here. I hope to look at the state-space model
soon. 
                      Reply  Wed Nov 24 13:44:19 2021, rana, Summary, Computers, Quantization Noise Calculation Summary 
This looks great. I think what we want to see mainly is just the noise in the 32 bit IIR filtering subtracted from the 64 bit one.

It would be good if Tega can look through your code to make sure there's NO sneaky places where python is doing some funny casting of the
numbers. I didn't see anything obvious, but as Chris points out, these things can be really sneaky so you have to be next level paranoid to really
                         Reply  Tue Dec 7 10:55:25 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary DF2_TS.pdfBIQ_TS.pdfScreen_Shot_2021-12-07_at_11.47.57_AM.pngPSD_COMP_BIQ_DF2.pdfPSD_COMP_SS_DF2.pdf
[Ian, Tega]

Tega and I have gone through the IIR Filter code and
optimized it to make sure there aren't any areas that force high precision to be down-converted to low precision.
                            Reply  Fri Dec 10 13:02:47 2021, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary G0900928-v1_(dragged).pdfPSD_COMP_BIQ_DF2.pdfInput_PSD.pdfInput_Filter.pdfQuantizationN.zip
I am trying to replicate the simulation done by Matt Evans in his presentation  (see
Attachment 1 for the slide in particular). 

He defines his input as 
                               Reply  Mon May 9 15:32:14 2022, Ian MacMillan, Summary, Computers, Quantization Noise Calculation Summary SUS-ETMX_SUSYAW3_0.0.pdfLowNoiseBiquad2.pdfquant_noise_floor.pdf
I made the first pass at a tool to measure the quantization noise of specific filters in the 40m system. The code for which can be found here.
It takes the input to the filter bank and the filter coefficients for all of the filters in the filter bank. it then runs the input through all the filters
and measures the quantization noise at each instance. It does this by subtracting the 64-bit output from the 32-bit output. Note: the actual system is
Entry  Mon Apr 18 16:09:07 2022, Yehonathan, Update, BHD, BHD Readout simulation BHD_Simulink_Sketch.drawio.pdf
I'm planning on simulating the BHD readout noise in a manner very similar to the ALS noise model using Simulink. I've made a sketch of the model
for the longitudinal DOFs (attached). A model for ASC will be similar but with more measurement devices (OpLevs, QPDs, WFSs).

I'm not pretending to simulate everything in this diagram on the first go, it is just a sketch of the big picture.
    Reply  Tue May 3 21:07:17 2022, Yehonathan, Update, BHD, BHD Readout simulation 
I feel like there is an instability in my thought process on this. Before my tendency to try to scale and generalize this problem brings me to a full
stop I will make small but quick progress.

First thing is to calculate the noise budget for a simple Michelson. The involved optics are:
       Reply  Thu May 5 17:50:48 2022, Yehonathan, Update, BHD, BHD Readout simulation BHD_controls_40m_MICH.pdf
I have made a Simulink diagram to use in the MICH modeling (attachment) for the homodyne angle detection scheme. The model will be used for each optic
separately and the noises will be combined in quadrature.

I gathered some more bits of info to fill the Simulink boxes. This is what I have so far:
Entry  Tue Feb 1 15:33:28 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics Invac_opto_mechanics_v2.pdf
I've summarized the optomechanics configuration for the in-vacuum aux small optics

It's not obvious here but the post for POP_SM4 is the stack of BA2V, Newport 9953, PLS-T238, LMR1V. The mirror is a CM254-750-E03 curved
mirror. This should go on the suspension base. I hope I did not make a mistake there...
    Reply  Wed Feb 2 18:55:58 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics Screen_Shot_2022-02-02_at_6.46.46_PM.png
Here is more detail of the POP_SM4 mount assembly.

It's a combination of BA2V + PLS-T238 + BA1V + TR-1.5 + LMR1V + Mirror: CM254-750-E03
Between BA1V and PLS-T238, we have to do a washer action to fix the post (8-32) with a 1/4-20 slot. Maybe we can use a 1" post shim from thorlabs/newport.
       Reply  Wed Feb 2 21:16:23 2022, Koji, Summary, BHD, Optomechanics configuration for the in-vacuum aux small optics PXL_20220203_050156031.jpg
Asked Jordan to clean 2x 1.5" posts (0.5 dia) and a washer with 1" dia.

 
       Reply  Thu Apr 28 11:53:10 2022, Anchal, Summary, BHD, POP_SM4 and POP_SM5 Assembly 
POP_SM4

I tried out this stack today and found some change of plans.


The attachment in elog 40m/16640 says to use 1/4-20 silver coated non-vented screws for joining BA2V to PLS-T238, however
          Reply  Tue May 3 14:02:09 2022, Anchal, Summary, BHD, Installed POP path in ITMX Chamber 
[Anchal, JC]

I installed POP_SM4 and POP_SM5 in the ITMX chamber in the nominal positions. This must have affected the ITMX Oplev because I could see that
one of the ITMX oplev beam was going through POP_SM5. It needs to be changed in order to follow the original plan. However, since POP_SM5 is a 1064 line
    Reply  Thu Apr 14 10:18:35 2022, Paco, Summary, BHD, 2 in oplev mirrors incompatible with LMR2V 
[Paco, JC]

We realized the 2 in oplev mirrors (Thorlabs BB2-E02) for ITMYOL, SRMOL, and BSOL, are 0.47 in thick, while the LMR2V fixed mount is 0.46 in
deep, even without taking the retaining ring into account. After a brief exchange with Koji, and Ian, we decided to glue the mirrors onto the mounts using
       Reply  Thu Apr 14 18:34:51 2022, Paco, Summary, BHD, ITMY Oplev reinstalled (Re: 2 in oplev mirrors incompatible with LMR2V) 
[Paco, Yehonathan]

We installed ITMYOL1 and ITMYOL2 on the ITMY chamber. We aligned the ITMY OpLev beam and closed the loop successfully, we then had a second round
of YARM aligment, where we brought the Y peak transmission up from 0.04 counts to 0.09 counts (up by a factor of two). We still couldn't close the
Entry  Fri Apr 29 08:34:40 2022, JC, Update, VAC, RGA Pump Down Screen_Shot_2022-04-29_at_8.46.53_AM.png
Jordan and I, in order to start pumpig down the RGA Volume, we began by opening V7 and VM. Afterwards, we started RP1 and RP3. After this, the pressure
in the line between RP1, RP3, and V6 dropped to 3.4 mTorr. Next, we tried to open V6, although an error message popped up. We haven't been able
to erase it since. But we were able to turn on TP2 with V4 closed. The pressure in that line is reporting 1.4 mTorr.
    Reply  Tue May 3 13:18:47 2022, JC, Update, VAC, RGA Pump Down 
Jordan, Tega, JC

Issue has been resolved. Breaker on RP1 was tripped so the RP1 button was reporting ON, but was not actually on which continuously tripped the
V6 interlock. Breaker was reset, RP1 and RP3 turned on. The V6 was opened to rough out the RGA volume. Once, pressure was at ~100mtorr, V4 was opened to
Entry  Thu Apr 21 18:18:42 2022, yehonathan, Update, BHD, POX Alignment POX11_alignment.png
{Yehonathan, Paco}

BS, ITMX and ETMX were aligned to get flashing in the X arm.

I aligned the POX beam on the ITMX table using a mixture of the old POP and POX optics. The beam was stirred to the POX11 RFPD. We measure the
    Reply  Thu Apr 28 17:45:53 2022, Anchal, Update, BHD, POX Beam issues PXL_20220429_002703686.jpg
[Anchal, Paco]

We investigated the low power issue with POX11 photodiode.


We used a power meter to confirm that above 12 uW of power is reaching the ITMX oplev table.
But the power reaching the photodiode
       Reply  Sat Apr 30 13:29:33 2022, Paco, Update, BHD, POX Beam issues --- fixed, ASL alignment on vertex chamber 
[Paco, Anchal, Yuta]

We opened the BSC and ITMX chamber in the morning (Friday) to investigate POX11 beam clipping. We immediately found that the POX11 beam was clipping
by the recently installed cable posts, so luckily no major realingment had to be done after reinstalling the cable post in a better location.
          Reply  Mon May 2 17:51:30 2022, Anchal, Update, BHD, POX Beam aligned on RFPD, YARM locked 
[Paco, Anchal]

We found that one of the Y1-1037-45P marked mirror that we used was actually curved. So we removed it and used a different Y1-1037-45P mirror,
adjusted the position of the lens and got the beam to land on POX11 RFPD successfully.
Entry  Wed Apr 27 10:05:55 2022, JC, Update, Coil Drivers, Coil Drivers Update 
18 (9 pairs) Coil Drivers have been modified. Namely ETMX/ITMX/ITMY/BS/PRM/SRM/MC1/MC2/MC3.

 

ETMX Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        S2100624
    Reply  Mon May 2 13:30:52 2022, JC, Update, Coil Drivers, Coil Drivers Update 
The DCC has been updated, along with the modified schematic. Links have been attached.




Quote:



18 (9 pairs) Coil Drivers
Entry  Fri Apr 22 14:14:33 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement IMG_0572.jpegIMG_0573.jpeg
Jordan, JC

While the pumpspool is vented, I thought it would be a convenient time to change out the tip seal on the TP3 forepump. This one had not been
changed since 2018, so as preventative maintence I had JC remove the pump and begin cleaning/installing the new tip seal.
    Reply  Mon May 2 10:00:34 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement 
[JC, Jordan]

Jordan recieved the new tip seal Friday afternoon and I continued the replacement process in the morning. Finishing up, we proceeded to test
the pump in the Clean and Bake room. The pump's pressure lowered to 110 mTorr, and we continue pumping so the seal can recieve a good fitting.
Entry  Wed Apr 27 16:28:57 2022, Anchal, Summary, BHD, BHD Upgrade - Retreiving arm cavity alignment 
[Anchal, Paco, JC]

We had to open ITMY, ETMY chamber doors to get the cavity aligned again. Once we did that, we regained cavity flashing and were able to align
the input injection and cavity alignment to get transmission flashing to 1.0 (C1:LSC-TRY_OUT_DQ). JC later centered both ITMY and ETMY oplevs. The ITMY
    Reply  Thu Apr 28 09:12:18 2022, Anchal, Update, BHD, Restoring arm alignment 
This would be a daily first task in the morning. We'll need to check the status of arm alignment and optimize it back to maximum every morning for
the rest of the day's work.

Today, when I came, on openin gthe PSL shutter, IMC was aligned good, both arms were flashing but YARM maximum transmission count was around
       Reply  Thu Apr 28 18:07:04 2022, Anchal, Update, BHD, Restoring arm alignment at EOD 
Restored arm algiment to get 0.8 max flashing on YARM and 1 max flashing on XARM. I had to move input alignment using TT2-PR3 pair and realign YARM cavity
axis using ITMY-ETMY pair.

I would like to advertise this useful tool that I've been
Entry  Tue Apr 26 16:23:22 2022, Tommy, Update, Electronics, RFSoC2x2 MTS 
We connected a 8 MHz signal generator to the device in order to sync up the ADCs and DACs and hopefully get phase data. 

Some things to note:


RF Manual (143)- Need to use XRFDC SYSREF for update event
RF Manual (171)- Synchronization steps require us to first enable
Entry  Mon Apr 25 18:00:03 2022, Ian MacMillan, Update, Upgrade, Cable supports update Chamber_Leg_Ribbon_Cable_Attachments.pdf
I have designed new cable supports for the new ribbon cables running up the side of the tables in the vacuum chambers. 

The clamps that I have designed (shown in basic sketch attachment 1) will secure the cable at each of the currently used cable supports. 

The support consists of a backplate and a frontplate. The backplate is secured to the leg of the table using a threaded screw. The frontplate
Entry  Thu Apr 21 10:35:23 2022, Koji, Update, CDS, DAQ seemed down 
Yesterday, when I worked on the damping servo, I found that any of the daqvtools (ndscope, dtt, dataviewer,...) is not available.  We may need to
restart the fb and rt machines.
    Reply  Mon Apr 25 17:24:06 2022, Anchal, Update, CDS, DAQ still down 
I investigated this issue today. At first, it seemed that only new suspension testpoints are inaccessible. I was able to use diaggui for a measurement
on MC2. The DAQ network cable between 1X4 and 1Y1 was tied and is very taught now (we should relieve this as soon as possible, best solution is to lay
down a longer cable over the bridge). My hypothesis is that the DAQ network might have broken while tying this cable and it probably did not come back
Entry  Tue Apr 19 18:10:10 2022, Paco, Update, BHD, Part V of BHR upgrade - POX11 path, LO path, and ITMX Oplev DJI_0167.JPGDJI_0169.JPGDJI_0168.JPG
[Yuta, Paco]

We set up POX11 beam path from ITMX chamber to the ITMX in-air table. To do this, we first identified the POX reflection on the ITMX chamber,
and then steered the POXM1 (in the BSC) by hand until we cleared the viewport. We also checked that the POX beam is centered on POXM1.
    Reply  Wed Apr 20 08:20:22 2022, Paco, Update, BHD, Part V of BHR upgrade - PR2 weirdness 
Yesterday, I tried tuning the PR2 damping gains by increasing the gain until the damping gave the ~5 oscillations (by watching the damped motion using
StripTool, and keeping an eye on the PD var). I noticed that often when I changed the gain, some OSEM sensors shifted (gained an offset!!) and the PD var
values changed, typically increasing at higher damping gains. I reverted the changes until the PD var looked "normal" again (~ 2 mV) but it is
       Reply  Wed Apr 20 18:50:03 2022, Koji, Update, BHD, Part V of BHR upgrade - PR2 weirdness Screenshot_2022-04-20_18-46-11.png
It seemed that it comes from the servo oscillation. This does not happen when the output limitters were set to be 100-ish. But even so the gains looked
quite low.

I turned on the Cheby rool-offs for all the DOFs, and this allowed me to increase the damping gain A LOT.
    Reply  Thu Apr 21 16:49:01 2022, Paco, Update, BHD, Part V of BHR upgrade - BS Oplev + LO1 offset 
[Paco, JC, Yuta]

We aligned the BS oplev using the new BSOL mirror pair. The main change is now the AOI of the oplev on the BS is quite normal. The output beam
in the in-air table was quite large (diverging?) so we had to place a short FL lens in front of the QPD.
       Reply  Thu Apr 21 18:42:47 2022, Tega, Update, BHD, Part V of BHR upgrade - Align LO and AS beams to BHD BS 
[Tega, Yuta, Paco]

We tried aligning the LO and AS beams on to the BHD beamsplitter. During the alignment process, we noticed that the damping loop for AS1 was
not working. Paco drew our attention to the fact that the UR OSEM signal was alway close to zero, so we checked to ensure that the magnet was still within
          Reply  Thu Apr 21 20:33:31 2022, Koji, Update, BHD, AS1 UR OSEM problem localized in the chamber Screenshot_from_2022-04-21_20-13-13.png
Tega and Paco reported that the UR OSEM of AS1 lost the response.

- I have checked the LED MON (left) of the satellite amp for AS1. CH1/2/3 had 5V -> This indicates that the OSEM LEDs are (most likely) functioning.
- Then I went to the ITMY flange and connected the OSEM emulator instead of the Dsub25 cable. The attachment shows that the UR OSEM LED/PD worked
             Reply  Fri Apr 22 12:03:09 2022, Tega, Update, BHD, AS1 UR OSEM problem localized in the chamber 
[JC, Tega, Ian, Paco]

We found that the UR cable was clamped to the table by one of the ITMY OPLEV steering mirror mounts that was recently installed. After freeing
the cable, the UR signal is now active again.
                Reply  Fri Apr 22 12:15:08 2022, Anchal, Update, BHD, Cable post installation 
If someone gets time, let's put in all the cable posts and clean up our cable routing on the tables.

 
                   Reply  Mon Apr 25 16:57:57 2022, Anchal, Update, BHD, Cable post installation 
[Anchal, Tega, JC]

We installed cable posts in ITMY, BS, and ITMX chambers for all the new suspensions. Now, there is no point where the OSEM connections are hanging
freely.
Entry  Mon Apr 25 14:19:51 2022, JC, Update, General, Nitrogen Tank 
Coming in this morning, I checked on the Nitrogen tanks to check the level. One of the tanks were empty, so I went ahead and swapped it out. One tank
is at 946 PSI, the other is at 2573 PSI. I checked for leaks and found none.
    Reply  Mon Apr 25 14:49:02 2022, Koji, Update, General, Nitrogen Tank 
For your (and mine) info:

N2 pressure can be monitored on the 40m summary page: https://nodus.ligo.caltech.edu:30889/detcharsummary/day/20220425/vacuum/
(you need to hit "today" to go to the current status)
Entry  Sun Apr 24 13:17:08 2022, Tommy, Update, Electronics, New RFSoC2x2 Overlay 
We recieved an overlay from Chris Stoughton which he used for a ZCU11 board. The overlay is supposed to be compatible with the RFSoC 2x2 and help enable
the Multi-Tile Synchronization (MTS) we need. He also provides a .py with the necessary low level connection to the board and its memory along with a few
sample notebooks.
Entry  Fri Apr 22 07:01:58 2022, Jc, Update, Coil Drivers, Adding Resistors and Reinstalling 8x
[Koji, JC]

Coil Drivers LO2, SR2, AS4, and AS1 have been updated a reinstalled into the system. 

LO2 Coil Driver 1 (UL/LL/UR)now has R=100 // 1.2k ~ 92Ohm for CH1/2/3        Unit: S2100008
    Reply  Fri Apr 22 12:09:51 2022, Anchal, Update, Coil Drivers, Please update DCC pages 
Nice. Please put this information on the DCC pages of the coil driver units. You'll find links to all the units in this document tree LIGO-E2100447.
For each page, click on "Change Metadata" from the left panel and add the change made to the resistor (including the resistor name on PCB, previous
and new value), and add a link to your previous elog post which has more details like photos, to "Notes and Changes", and upload an updated version
Entry  Mon Apr 18 14:52:47 2022, Ian MacMillan, Summary, SEI, Seismic Study of Buildings and Caltech Campus 7x
[Ian, JC]

I want to take measurements of seismic noise at different places on Caltech's campus and in different buildings. I will try to use the accelerometer
in my phone for this but first I must calibrate it (Against the 40m accelerometers). 
    Reply  Thu Apr 21 17:32:35 2022, Ian MacMillan, Summary, SEI, Seismic Study of Buildings and Caltech Campus IMG_1820.jpgScreen_Shot_2022-04-21_at_5.52.51_PM.png
[Rana, Ian]

We built a power supply for the accelerometer shown in Attachment 1 based on the diagram shown in the Wilcoxon
manual and shown in attachment 2. We used a 9V power supply and a capacitor value of 680uF. We did not use a constant current diode. 
Entry  Tue Apr 12 09:05:21 2022, Jordan, Update, VAC, New Pressure Gauge Install/Pump Spool Vent 6x
Today, Tega and I would like to vent the pump spool an dinstall the new FRG-400 Agilent Pressure Gauges (per elog 15703). The attached picture shows
the volume needed to be vented highlighted in red, and the gauges that need to be replaced/removed (purple dot next to the name).

The vent plan is as follows:
    Reply  Wed Apr 13 12:50:07 2022, Tega, Update, VAC, New Pressure Gauge Install/Pump Spool Vent VAC_FRG_UPGRADE.png
[Jordan, JC, Tega]

We have installed all the FRGs and updated the VAC medm screens to display their sensor readings. The replacement map is CC# -> FRG#, where
# in [1..4] and PRP1 -> FRG5. We now need to clean up the C1VAC python code so that it is not overloaded with non-function gauges (CC1,CC2,CC3,CC4,PRP1).
       Reply  Thu Apr 21 16:36:56 2022, Tega, Update, VAC, cleanup work for vacuum git repo 
git repo - https://git.ligo.org/40m/vac

Finally incorporated the FRGs into the main modbusIOC service and everything seems to be working fine. I have also removed the old sensors (CC1,CC2,CC3,CC4,PTP1,IG1)
from the serial client list and their corresponding EPICS channels. Furthermore, the interlock service python script has been updated so that all occurrence
Entry  Wed Apr 20 16:11:08 2022, Koji, Update, SUS, Outpur resistors updated for LO1 coil drivers / for SR2, LO2, AS1, and AS4 in progress 6x
[JC Koji]

To give more alignment ranges for the SUS alignment, we started updating the output resistors of the BHD SUS coil drivers.
As Paco has already started working on LO1 alignment, we urgently updated the output Rs for LO1 coil drivers.
    Reply  Thu Apr 21 15:22:44 2022, Koji, Update, SUS, Outpur resistors updates for SR2, LO2, AS1, and AS4 done 
[JC Koji]

Quick report: JC has done all the mods for the coil driver circuit in the morning and we worked on the reinstallation of them in the afternoon.
I'll check the damping loops / sus servo settings. JC is going to make an ELOG entry and DCC updates for more precise record of the mods.
Entry  Thu Apr 21 11:31:35 2022, JC, Update, VAC, Gauges P3/P4 IMG_0560.jpegIMG_0561.jpeg
[Jordan, JC]

It was brought to attention during yesterday's meeting that the pressures in the vacuum system were not equivalent althought the valve were
open. So this morning, Jordan and I reviewed the pressure gauges P3 and P4. We attempted to recalibrate, but the gauges were unresponsive. Following this,
Entry  Tue Mar 1 16:01:14 2022, Paco, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga balun_adc1.pngPXL_20220302_001734121.jpg
[Tommy, Paco]

Since last week I've worked with tommy on getting the RFSoC 2x2 board to get some TFs from simple minicircuits type filters. The first thing
I did was set up the board (which is in the office area) for remote access. I hooked up the TCP/IP port to a wall ethernet socket (LIGO-04) and the caltech
    Reply  Thu Apr 7 20:33:42 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work 
To access the board remotely through the 40m lab ethernet port, use

ssh -N -L localhost:1137:localhost:9090 xilinx@<ip_address>

Then in the browser go to
    Reply  Fri Apr 8 16:03:58 2022, rana, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
Seems like it should be possible to just remove the transformer (aka as a BALUN ... BALanced, UNbalanced), or replace it with a lower frequency part.
Its just a usual mini-circuits part. Maybe you can ask Chris Stoughton about this and ask Tommy to checkout some of the RFSoC user forums for how to go
to DC.
       Reply  Wed Apr 20 14:56:06 2022, Tommy, Update, Electronics, RFSoC 2x2 board -- setup for remote work & BALUN saga 
Here are a few options for replacement BALUNs from Mini Circuits and specs:

Current. TCM1-83X+, 10-8000 MHz, 50 Ohms, Impedance Ratio 1, Configuration K

1. Z7550-..., DC-2500 MHz (some DC-2300), 50/75 Ohms, Impedance Ratio 1.5, Configuration Q. There are various types of the Z7550 which have different
Entry  Mon Apr 18 15:17:31 2022, Jancarlo, Update, General, Tool box and Work Station Organization 
I cleaned up around the 40 m lab. All the Laser Safety Glasses have been picked up and placed on the rack at the entrance.

Some miscellaneous BNC Connector cables have been arranged and organized along the wall parallel to the Y-Tunnel.

Nitrogen tanks have been swapped out. Current tank is at 1200 psi and the other is at 1850 psi.
    Reply  Mon Apr 18 23:22:39 2022, Koji, Update, General, Tool box and Work Station Organization PXL_20220419_062101907.jpg
Whoa! Thanks!
Entry  Mon Oct 25 13:23:45 2021, Anchal, Summary, BHD, Before photos of BSC 
[Yehonathan, Anchal]

On thursday Oct 21 2021, Yehonathan and I opened the door to BSC and took some photos. We setup the HEPA stand next to the door with anti-static
curtains covering all sides. We spend about 15 minutes trying to understand the current layout and taking photos and a video. Any suggestions on improvement
    Reply  Mon Oct 25 17:37:42 2021, Anchal, Summary, BHD, Part I of BHR upgrade - Removed optics from BSC rn_image_picker_lib_temp_44cb790a-c3b4-42aa-8907-2f9787a02acd.jpgrn_image_picker_lib_temp_0fd8f4fd-64ae-4ccd-8422-cfe929d4eeee.jpg
[Anchal, Paco, Ian]


Clean room etiquettes


Two people in coverall suits, head covers, masks and AccuTech ultra clean
gloves.
One person in just booties to interact with outside "dirty" world.
Anything that comes in chamber, first cleaned
       Reply  Tue Oct 26 16:56:22 2021, Paco, Summary, BHD, Part I of BHR upgrade - Locked PMC and IMC 
[Paco, Ian]

We opened the laser head shutter. Then, we
scanned around the PMC resonance and locked it. We then opened the PSL shutter, touched the MC1, MC2 and MC3 alignment (mostly yaw) and managed to lock
          Reply  Wed Oct 27 16:27:16 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Prep OMCNorthBefore.jpegOMCNorthAfter.jpeg
[Anchal, Paco, Ian]

Before we could start working on Part II, which is to relocate TT2 to new location, we had to clear space in front of injection chamber door
and clean the floor which was very dusty. This required us to disconnect everything we could safely from OMC North short electronics rack, remove 10-15
             Reply  Wed Oct 27 16:31:35 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Removal of PR2 Small Suspension 
I went inside the ITMX Chamber to read off specs from PR2 edge. This was required to confirm our calculations of LO power for BHR later. The numbers
that I could read from the edge were kind of meaningless "0.5 088 or 2.0 088". To make it more worthwhile this opening of the chamber, we decided
to remove the PR2 suspension unit so that the optic can be removed and installed on an SOS in the cleanroom. We covered the optic in clean aluminum foil
                Reply  Thu Oct 28 16:32:32 2021, Paco, Summary, BHD, Part IV of BHR upgrade - Removal of BSC eastern optics 
[Ian, Paco, Anchal]

We turned off the BSC oplev laser by turning the key counterclockwise. Ian then removed the following optics from the east end in the BSC:


OM4-PJ (wires were disconnected before removal)
GRX_SM1
OM3
BSOL1


We placed them in
                   Reply  Fri Nov 5 12:21:16 2021, Anchal, Summary, BHD, Part VI of BHR upgrade - Removal of ITMYC optics XendFlowBenchLeftEnd.jpgXendFlowBenchMiddle.jpgXendFlowBenchRightEnd.jpg
Today I opened the ITMY chamber and removed the following optics and placed them in Xend flow bench (See attachment 1-3 for updated photograph):


OM1
OM2
ITMYOL1
ITMYOL2
SRMOL1
SRMOL2
POYM1
3 counterweights
one of which was double the height of others.


I also unscrewed SRM and parked it near the Western end of the table where no optical paths
                      Reply  Wed Dec 15 16:11:38 2021, Anchal, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 signal-2021-12-15-161437.jpeg
[Anchal, Yehonathan, Paco]


Today we opened ITMX chamber and removed the following optics and placed them in the Xend flow bench (see attachment 1):


POPM1
POPM2


Yehonathan brought his first SOS baby next to ITMX chamber. The suspension was carried by hands
                         Reply  Wed Dec 15 17:44:18 2021, Koji, Summary, BHD, Part VIII of BHR upgrade - Placed LO1 
If ITMX already has another side magnet, we can migrate the side OSEM of ITMX to the other side. This way, the interference of the OSEMs can be avoided.
                            Reply  Thu Jan 6 21:04:41 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO1 OSEMs inserted 
[Anchal, Koji] Part of elog: 40m/16549.

The magnets on the mirror face are arranged in a manner that the overall magnetic dipole moment is nullified faraway. Because of this, the coil
output gains in all such optics need to have positive and negative signs in a butterfly mode pattern (eg. UL, LR: +ve and UR, LL: -ve).
                               Reply  Mon Jan 10 14:52:51 2022, Anchal, Summary, BHD, LO1 OSEMs roughly calibrated and noise measured LO1_vs_ETMX_OSEM_Spectrum_LF_x30_Gain.pdfLO1_vs_ETMX_OSEM_Spectrum_HF_x30_Gain.pdf
I used the open light level output of 908 for ITMX side OSEM from 40m/16549 to roughly
calibrate cts2um filter module in LO1 OSEM input filters. All values were close to 0.033. As the calibration reduces the signal value by about 30 times,
I increased all damping gains by a factor of 30. None of loops went into any unstable oscillations and I witnessed damping of kicks to the optic.
                                  Reply  Mon Jan 10 18:36:41 2022, Anchal, Summary, BHD, LO1 free swinging test set to trigger 
LO1 is set to go through a free swinging test at 1 am tonight. We have used this script (scripts/SUS/InMatCalc/freeSwing.py) reliably in the past so
we expect no issues, it has a error catching block to restore all changes at the end of the test or if something goes wrong.

To access the test, on rossa, type:
                                     Reply  Tue Jan 11 12:19:12 2022, Anchal, Summary, BHD, LO1 Input Matrix Diagonalization performed. LO1_SUS_InpMat_Diagnolization.pdfLO1_FreeSwingData_PeakFitting.pdf
The frree swinging test was successful. I ran the input matrix diagonalization code (scripts/SUS/InMAtCalc/sus_diagonalization.py) on the LO1 free swinging
data collected last night. The logfile and results are stroed in scripts/SUS/InMatCalc/LO1 directory. Attachment 1 shows the power spectral density of
the DOF bassis data (POS, PIT, YAW, SIDE) before and after the diagonalization. Attachment 2 shows the fitted peaks.
                               Reply  Mon Jan 24 18:53:09 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 placed and OSEMs tuned 
I placed LO2 in its planned position in BS chamber, inserted the OSEMs, and tuned their position to halfway brightness. At the end of the work, I was
able to damp the optic successfully. The full open (full brightness) OSEM ADC counts are:

UL 25743.  -> 12876
                                  Reply  Tue Jan 25 10:55:02 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 input matrix diagonalization performed. 
The free swinging test was successful. I ran the input matrix diagonalization code (/opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/sus_diagonalization.py)
on the LO2 free-swinging data collected last night. The logfile and results are stored in /opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/LO2
directory. Attachment 1 shows the power spectral density of the DOF basis data (POS, PIT, YAW, SIDE) before and after the diagonalization. Attachment 2
                                     Reply  Tue Jan 25 16:42:03 2022, Anchal, Summary, BHD, Reduced filter gains in all damped new SOS 
I noticed that our current suspension damping loops for the new SOS were railing the DAC outputs. The reason being that cts2um module has not been updated
for most optics and thus teh OSEM signal (with the new Sat Amps) is about 30 times stronger. That means our usual intuition of damping gains is too high
without applying correct conversion cts2um filter module. I reduced all these gains today and nothing is overflowing the c1su2 chassis now. I also added
                         Reply  Thu Jan 6 11:54:20 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 
[Paco (Vacuum Work), Anchal]

Today we opened the ITMY Chamber and installed suspended AS1 and AS4 in their planned positions. In doing so, we removed the razor or plate mounted
on a pico motor at the south end of the table (see 40m/16450). We needed to make way for AS4
                            Reply  Fri Jan 7 16:17:42 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - Placed AS1 and AS4 filters 
[paco]

Added input filters, input matrix, damping filters, output matrix, coil filters, and copy the state over from LO1 into AS1 screen
in anticipation for damping.
                               Reply  Sat Jan 8 16:01:42 2022, Paco, Summary, BHD, Part IX of BHR upgrade - Placed LO2 filters 
Added input filters, input matrix, damping filters, output matrix, coil filters, and copy the state over from ITMX into LO2 screen in
anticipation for damping.
                                  Reply  Tue Jan 18 14:26:09 2022, Paco, Summary, BHD, Part IX of BHR upgrade - Placed remaining filters SR2, PR3, PR2 
[Anchal, Paco]

Added input filters, input matrix, damping filters, output matrix, coil filters, and copy the state over from LO1 into SR2, PR2, PR3 screens
in anticipation for damping.
                               Reply  Tue Jan 11 18:18:29 2022, Anchal, Summary, BHD, Attempted OSEM installation on AS1 
[Anchal, Paco, Yehonathan]

Connected in-cir cable to new flange on ITMY Chamber

Connected OSEM one-by-one. Starting from top right  to left (PIn1)
                                  Reply  Tue Jan 11 18:40:25 2022, Anchal, Summary, BHD, AS1 Sat Amp has a PCB issue signal-2022-01-11-184917.jpeg
AS1 Sat Amp (S2100741) has a critical PCB issue on it's Ch5-8 board S2100548. This board is supposed
to just feed through the coil driver signal from the front DB9 connector to the back DB25 connector but it has a short between pins 2 and 7 at the "Coil
Input" end (connector J1). The short persists even after I disconnect the sat amp to the flange connector on the back of this board, which definitely
                                     Reply  Thu Jan 13 09:48:41 2022, Anchal, Summary, BHD, AS1 Sat Amp fixed signal-2022-01-13-094823_001.jpegsignal-2022-01-13-094823_002.jpeg
I fixed the issue in AS1 Sat Amp (S2100741) by using a razor blade. I cut the short between the
two places, cleaned up the area and covered it with electrical tape. However, later feedback from Rana was to not use electrical tape as it dries up and
becomes brittle and lfaky in long run. So after the AS1 OSEM tuning is over, I'll open this box again and use something else to insulate the exposed
                                  Reply  Thu Jan 13 12:24:08 2022, Anchal, Summary, BHD, AS1 SD and LR magnets broke 
[Anchal (vacuum work), Paco (outside)]

After the AS1 Sat Amp fix (40m/16579), we today were able to tune all OSEMs to the
mid-bright level. But when we were about to call it, we were told that the new PEEK earthquake stop screw and bolts need to go on the thin suspended optics.
                                     Reply  Mon Jan 24 21:18:40 2022, Paco, Summary, BHD, Part IX of BHR upgrade - AS1 placed and OSEM tuned 
[Paco]

AS1 was installed in the ITMY chamber today. For this I moved AS4 to its nominal final placement and clamped it down with a single dog clamp.
Then, I placed AS1 near the center of the table, and quickly checked AS4 could still be damped. After this, I leveled the table using a heavier/lighter
                                        Reply  Tue Jan 25 11:02:54 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test failed AS1_freeSwingTestFailed.pdf
For some reasonf the free swing test showed only one resonance peak (see attachment 1). This probably happened because one of the earthquake stops is
touching the optic. Maybe after the table balancing, the table moved a little over its long relazation time and by the time the free swing test was performed
at 3 am, one of the earthquake stops was touching the optic. We need to check this when we open the chamber next.
                                           Reply  Thu Jan 27 08:27:34 2022, Paco, Summary, BHD, Part IX of BHR upgrade - AS1 inspection and correction 
[Paco]

This morning, I went into ITMY chamber to inspect AS1 after the free swinging test failed. Indeed, as forecasted by Anchal, the top front
EQ stop was slightly touching, which means AS1 was not properly installed before. I proceeded by removing it well behind any chance of touching the optic,
                                              Reply  Wed Feb 2 16:32:02 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test still not good AS1_FreeSwingData_PeakFitting_20220125.pdfAS1_SUS_InpMat_Diagnolization_20220202.pdf
We still did not get a good AS1 free swinging spectrum. It seems the Side OSEM is reporting coupling to too many DOFs and some extra resonances than
we expect. So we did not upload the new input matrix calculated from this test. I'm attaching teh peak fitting (attachment 1) and the diagonalization
attempt (attachment 2) to give some idea of what happened. Note how different this fre swinging spectrum looks from the other optics.
                                                 Reply  Tue Mar 15 18:42:37 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 resuspended and OSEMs tuned 
http://nodus.ligo.caltech.edu:8080/40m/16722

http://nodus.ligo.caltech.edu:8080/40m/16716
                                                    Reply  Tue Mar 15 18:45:12 2022, Anchal, Summary, BHD, Part X of BHR upgrade - BHDBS Path setup 
[Paco, Anchal]

BS Chamber work


ASL was positioned in nominal place.
PR3 was moved to its nominal place from
temprorary position.
BS Table was rebalanced
Earthquake stops were removed from all SOS from BS table (LO2, SR2, BS, PR3)


                            Reply  Thu Jan 13 12:29:27 2022, Anchal, Summary, BHD, AS4 LR magnet broke 
After the debacle with AS1 (40m/16580), we decided the put the PEEK earthquake stop by first
removing the lower OSEM plate and then doing it. So I unfastened AS4 from its position with the earthquake stops in place and moved the suspension to the
center of the table. Then I carefully removed the bottom OSEM plate. But I found out that the LR magnet is broken and lying on the floor of the suspension
                               Reply  Fri Jan 14 18:12:47 2022, Anchal, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected 
AS4 was succesfully suspended and trasported to ITMY chamber (40m/16589). We placed it near
the door to make it easy to tune the OSEMs. We connected the OSEMs and found that the LL OSEM is not responding. Even though the the OSEMs
are completely out right now, there was no signal on this OSEM. This could be an issue in either at the LED driver circuit or the PD circuit in AS4 Sat
                                  Reply  Tue Jan 18 18:19:22 2022, Koji, Summary, BHD, AS4 placed in ITMY Chamber, OSEMs connected Screen_Shot_2022-01-18_at_17.48.16.pngcable_swap.png
AS4 satellite amplifier D1002818 / D080276 troubleshoot

I dug into the circuit to see what/where things were wrong.

- UL saturation issue: The open light voltage at the TIA output (I-V out) was 10.4V. It seemed that the photocurrent of 86uA
                                     Reply  Wed Jan 19 12:56:52 2022, Paco, Summary, BHD, AS4 OSEMs installation 
[Paco, Tega, Anchal]

Today, we started work on AS4 SOS by checking the OSEM and cable. Swapping the connection preserved the failure (no counts) so we swapped the
long OSEM for a short one that we knew was working instead, and this solved the issue. We proceeded to swap in a "yellow label", long OSEM in
                                        Reply  Thu Jan 20 16:42:55 2022, Paco, Update, BHD, AS4 OSEMs installation - part 2 
[Paco]

Turns out, the shifting was likely due to the table level. Because I didn't take care the first time to "zero" the level of the
table as I tuned the OSEMs, the installation was b o g u s. So today I took time to,
                                           Reply  Thu Jan 20 18:16:29 2022, Anchal, Update, BHD, AS4 set to trigger free swing test 
AS4 is set to go through a free swinging test at 10 pm tonight. We have used this script (Git/40m/scripts/SUS/InMatCalc/freeSwing.py)
reliably in the past so we expect no issues, it has a error catching block to restore all changes at the end of the test or if something goes wrong.

To access the test, on allegra, type:
                                              Reply  Fri Jan 21 16:40:10 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  AS4_SUS_InpMat_Diagnolization_20220121.pdfAS4_FreeSwingData_PeakFitting_20220121.pdf
The free swinging test was successful. I ran the input matrix diagonalization code (/opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/sus_diagonalization.py)
on the AS4 free-swinging data collected last night. The logfile and results are stored in /opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/AS4
directory. Attachment 1 shows the power spectral density of the DOF basis data (POS, PIT, YAW, SIDE) before and after the diagonalization. Attachment 2
                                                 Reply  Mon Jan 24 17:12:27 2022, rana, Update, BHD, AS4 Input Matrix Diagonalization performed.  
I think our suspension input matrix diagonalization is not so robust usually because we only choose
a inverting matrix which gives the best separation for a single suspension alignment.

i.e. we have seen in the past that adjusting the bias for the alignment makes the matrix inversion not work well. Sometime people turn OFF the
                                                    Reply  Mon Jan 24 20:48:48 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  
I agree. That's an interesting idea. But does that mean that there is an always working inverse matrix solution or that any solution will be vulnerable
to the alignment biases.

I think we can also calculate the matrix rotation required as a function of dc biases and do that rotation in the simulimk model.
                   Reply  Tue Jan 18 15:19:49 2022, Paco, Summary, BHD, Part IV of BHR upgrade - Replaced old SR3 with SOS SR2. OSEM tuning attemtped. PXL_20220119_012954365.jpgPXL_20220119_013003522.jpg
[Tega, Anchal, Paco]

We started working on SR2 installation. Preliminary work involved


Removing SR3 from BS chamber. For whatever reason this optic was still installed. It got relocated in the west corner of the ETMX flow
                      Reply  Tue Jan 18 18:16:28 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 Sat Amp Box inspection 
I tested the monitor ports on the SR2 Sat Amp Box but found that all LED Mon and PD Mon are giving expected
values. I disconnected the cable to OSEM and checked the PD monitors and found no offsets in case of no PD current. I realised that PD transimpedance offset
should be checked with PD inputs shorted instead. So I created a male DB 25 connector with pinds 2-3, 50-6, 8-9 and 11-12 shorted. This on connecting to
                         Reply  Wed Jan 19 12:50:10 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 OSEM tuning progress. 
It was indeed the issue of the top OSEM plate not being in the right place horizontally. But the issue was more non-trivial. I believe because of the
wedge in thick optics, there is a YAW offset in the optic in the free hanging position. I had to readjust the OSEM plate 4 times to be able to get full
dark to bright range in both upper OSEMs. After doing that, I tuned the four OSEMs somewhat near the halfway point and once I was sure I'm inside the
                            Reply  Thu Jan 20 17:03:36 2022, Anchal, Summary, BHD, Part IV of BHR upgrade - SR2 OSEM tuned. DJI_0144.JPG
The main issue with SR2 OSEMs, now that I think of it, was that the BS table was very inclined due to the multiple things we removed (including counterweights).
Today the first I did was level the BS table by placing some counterweights in the correct positions. I placed the level in two directions right next to
SR2 (clamped in its planned place), and made the bubble center.
                               Reply  Thu Jan 20 18:41:55 2022, Anchal, Summary, BHD, SR2 set to trigger free swing test 
SR2 is set to go through a free swinging test at 3 am tonight. We have used this script (Git/40m/scripts/SUS/InMatCalc/freeSwing.py)
reliably in the past so we expect no issues, it has a error catching block to restore all changes at the end of the test or if something goes wrong.

To access the test, on allegra, type:
                                  Reply  Fri Jan 21 11:24:42 2022, Anchal, Summary, BHD, SR2 Input Matrix Diagonalization performed.  SR2_SUS_InpMat_Diagnolization_20220121.pdfSR2_FreeSwingData_PeakFitting_20220121.pdf
The free swinging test was successful. I ran the input matrix diagonalization code (/opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/sus_diagonalization.py)
on theSR2 free-swinging data collected last night. The logfile and results are stored in /opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/SR2
directory. Attachment 1 shows the power spectral density of the DOF basis data (POS, PIT, YAW, SIDE) before and after the diagonalization. Attachment 2
                Reply  Thu Oct 28 17:01:54 2021, Anchal, Summary, BHD, Part III of BHR upgrade - Adding temp fixed flat mirror for PR2 
[Anchal, Paco, Ian]


We added a Y1-2037-0 mirror (former IPPOS SM2 mirror) on a fixed mount in the position of where PR2 is supposed to be in new BHR layout.
After
turning out all lights in the lab, we were able to see a transmitted beam on our beam finder card.
We aligned the mirror so that it relfects
                Reply  Thu Jan 27 17:57:35 2022, Anchal, Summary, BHD, Part III of BHR upgrade - Replaced small suspended PR3 with new SOS PR3 and OSEM tuning 
[Anchal, Paco]

We removed the old PR3 housed in a tip-tilt style suspension and put it on the North flow bench in the cleanroom. I put PR3 in an accessible
position near the North West edge of the BS chamber and balanced the table again with many weights. The OSEM tuning was very uneventful and easy. Following
                   Reply  Thu Jan 27 18:03:36 2022, Paco, Summary, BHD, Part III of BHR upgrade - Install PR2, balance, and attempt OSEM tuning 
[Paco, Anchal, Tega]

After installing the short OSEMs into PR2, we moved it into ITMX Chamber. While Tega loaded some of the damping filters and other settings, we
took time to balance the heavily tilted ITMX chamber. After running out of counterweigths, Anchal had to go into the cleanroom and bring the SOS stands,
                      Reply  Thu Jan 27 20:46:38 2022, Koji, Summary, BHD, Part III of BHR upgrade - Install PR2, balance, and attempt OSEM tuning Screen_Shot_2022-01-27_at_20.33.56.pngScreen_Shot_2022-01-27_at_21.30.16.png

Started debugging D1002818 / S2100737 (8:30PM)
Confirmed
the issue of the negative output of the UR sensor with the dummy OSEM connected at the air side of the ITMY chamber. Both PD Out and PD Mon have negative
outputs.
The same issue remains when the dummy OSEM box is connected to the chassis with a short DB25M/F cable at the rack.
Started
                         Reply  Fri Jan 28 10:37:59 2022, Paco, Summary, BHD, Part III of BHR upgrade - PR2 OSEM finalized, reinsall LO1 OSEMs 
[Paco]

Thanks to Koji's hotfix on the PR2 SatAmp box last evening, this morning I was able to finish the OSEM installation for PR2. PR2 is now fully
damped. Then, I realized that with the extreme rebalancing done in ITMX chamber, LO1 needed to be reinstalled, so I proceeded to do that. I verified all
                            Reply  Fri Jan 28 11:30:52 2022, Koji, Summary, BHD, Part III of BHR upgrade - PR2 OSEM finalized, reinsall LO1 OSEMs 
All green! Great work, Team!
                               Reply  Fri Jan 28 16:35:18 2022, Anchal, Summary, BHD, AS1, PR2 and PR3 set to trigger free swing test 
AS1, PR2 and PR3 are set to o go through a free swinging test at 3 am. We have used this script (Git/40m/scripts/SUS/InMatCalc/freeSwing.py)
reliably in the past so we expect no issues, it has a error catching block to restore all changes at the end of the test or if something goes wrong.

To access the test, on allegra, type:
                            Reply  Wed Feb 2 16:22:00 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR2 inpute matrix diagonalized PR2_FreeSwingData_PeakFitting_20220125.pdfPR2_SUS_InpMat_Diagnolization_20220202.pdf
The free swinging test was successful. I ran the input matrix diagonalization code (/opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/sus_diagonalization.py)
on the PR2 free-swinging data collected last night. The logfile and results are stored in 
                   Reply  Wed Feb 2 16:27:57 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR3 inpute matrix diagonalized PR3_FreeSwingData_PeakFitting_20220125.pdfPR3_SUS_InpMat_Diagnolization_20220202.pdf
The free swinging test was successful. I ran the input matrix diagonalization code (/opt/rtcds/caltech/c1/Git/40m/scripts/SUS/InMAtCalc/sus_diagonalization.py)
on the PR3 free-swinging data collected last night. The logfile and results are stored in
             Reply  Wed Oct 27 16:38:02 2021, Anchal, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
[Anchal, Paco]

We opened BSC and Injection Chamber doors. We removed two stacked counterweights from near the center of the BS table, from behind TT2 and placed
them in the Xend flow bench. Then we unscrewed TT2 and relocated it to the new BHR layout position. This provided us with the target for the alignment
                Reply  Wed Oct 27 18:11:37 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
Closed the PSL shutter @18:11
During the vent, we want to keep the cavity unlocked if not necessary.

 
                Reply  Wed Oct 27 18:16:45 2021, Koji, Summary, BHD, Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment 
- Moving the MMT2 south by a cm is fine. This will give you ~0.5cm at TT1 without changing the other alignment much.
- IMC mode is moving because of your presence + HEPA blow.
- 2cm at Faraday is plenty for the beam diameter of a few mm.
             Reply  Thu Mar 17 17:23:22 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment 
[Anchal, Yehonathan] (on Y Arm)

We first checked if the PZT mirrors M1 and M2 can be controlled. They indeed show no motion even after being connected with a power supply. So
green injection path can not be aligned using cds controls right now.
                Reply  Mon Mar 21 18:24:07 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
[Anchal, Tega]

We did the following alignment steps on Yarm today:


We aligned the green beam going into the ETMY chamber to the three irises on the path.
We aligned ETMY to get counter-propagating
                   Reply  Thu Mar 24 19:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
[Anchal, Paco]


Uneloged: yesterday, Paco and Ian tried locking the green laser on Yend to the Y-arm. Nothing noteworthy happened, no luck.



Started with aligning the green injection to the Iris on table (it was misaligned) and getting it on the ITMY center.
Then
                      Reply  Fri Mar 25 18:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
[Anchal, Paco, Shruti]


Today we found out that the laser controller at the Yend had it's inputs disconnected for the FAST PZT input and the Slow temperature
control input. The cables were also not labeled that were lying nearby.
I tracked the cables and connected the Fast input adn the slow input.
We
                         Reply  Sat Mar 26 13:04:38 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
I came for a bit to check on the "1Y0 burning smell" reported by Koji last evening. I agree that there's a toasty smell around the 1Y0
rack, but it is hard to tell where it comes from exactly. I think we can use the FLIR heat camera, but this will have to wait for Monday when someone with
an iphone is around.
                            Reply  Thu Mar 31 18:58:16 2022, Ian MacMillan, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
[Ian, Paco]

We continued to try and lock the IR laser to the x-arm. Last time we adjusted TT2 PR2 and PR3 to adjust the beam to hit the center of the ITMX.
Today we continued to adjust the same optics to make the beam hit the center of the beam splitter and make sure the beam is going in the direction of the
                               Reply  Tue Apr 5 18:15:06 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
[Paco, Anchal, Ian, JC]

We attempted the alignment of IR beam into the arm cavities. We used PR2 and PR3 (moved manually as well as using cdsutils) and got the YAW aligned
pretty good on both X and Y directions. PIT alignment however turned out to be much harder to align. PR2 PR3 didn't have much range, so we zeroed there
                                  Reply  Wed Apr 6 01:20:48 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm PXL_20220406_060846581.jpgPXL_20220406_014205726.jpgPXL_20220406_060324812.jpgPXL_20220406_015259326.jpg
PR2/PR3 Output R for fame OSEMS reduced from 1.2K to 1.2K//100Ohm

I put the R=100Ohm for PR3 with the functions of the units mistakenly swapped. This affects imbalanced actuation
of PR3 right now as well as too strong SD
                                     Reply  Wed Apr 6 22:51:47 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm PXL_20220406_213356237.MP.jpgPXL_20220406_212936502.MP.jpg
[Yuta Koji]

We took out the two coil driver units for PR3 and the incorrect arrangement of the output Rs were corrected. The boxes were returned to the rack.

In order to recover the alignment of the PR3 mirror, C1:SUS_PR3_SUSPOS_INMON / C1:SUS_PR3_SUSPIT_INMON / C1:SUS_PR3_SUSYAW_INMON were monitored.
                                  Reply  Wed Apr 6 12:03:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
[Anchal, Paco]

After Koji reduced the output resistors on PR2/PR3 coil drivers, we got much better actuation range. We aligned TT1 TT2 again to get beam centered
on PR2 and PR3. Then we used only PR2 and PR3 to do the input beam alignment to Y arm cavity. Using access in ETMY chamber, we aligned the input beam parallel
                                     Reply  Thu Apr 7 17:59:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
[Anchal, Paco, JC, Tega]

Today we have aligned the Yarm cavity for IR, with verified 1.5 roundtrips. We also placed following optics in the BS table.


POXM1 (installed earlier, not eloged)
SRMOL2
POYM1
SRMOL1
POYM2


We also
                                        Reply  Fri Apr 8 17:21:31 2022, Ian MacMillan, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
[Ian, Paco, Tega]

Paco and I opened the ETMY and ITMY chamber to work on yesterdays efforts to lock the y arm. We temporarily in stalled a camera behind the
ETMY to look at the transmission as we adjusted the ETMY and ITMY. We then moved on to setting up the POY. the beam was too large for the apature of the
                                           Reply  Mon Apr 11 21:13:21 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
[Paco, Koji]

I asked Koji for some advice regarding closing the loop on YARM using POY11. A few things seemed off including


The YARM transmission; which was peaking at ~ 20 (typically, TRY is normalized so that under nominal input power conditions we see TRY
                                              Reply  Mon Apr 11 21:44:14 2022, Koji, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging D990543A1.PDFPXL_20220412_023941730.jpgPXL_20220412_023950567.jpg
We took out the right most PD interface board D990543 and removed the 74LS04 chips. In fact two out of 4 were already replaced with enabling wires, however
it seemed that one of the remaining two got failed.
These remaining two chips were removed and the enabling signals were connected to VCC (+5V). This operation made the status LED light not functional.
                                                 Reply  Thu Apr 14 11:52:57 2022, yehonathan, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging Screenshot_2022-04-14_15-53-39.pngPXL_20220414_220616875.jpg
{JC, Paco, Yehonathan, Ian}

POY lens was moved to infront of the POY steering mirror to make the POU beam focused on the POY11 RFPD. We measured the DC output with an oscilloscope
and optimized it with the steering mirrors. We get ~ 16.5mV.
                                                    Reply  Thu Apr 14 18:39:13 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
[Paco]

In reply to Koji's questions;

Q1: What is the product number of the broken Kepco? 
                                                       Reply  Mon Apr 18 17:53:45 2022, Paco, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging 
[Paco, Ian]

We aligned the X-arm IR laser


First fix pointing on the ITMX by moving the BS (mostly pitch)
then open etmx chamber and fine tune the pointing using the
Entry  Fri Apr 15 11:59:16 2022, Yehonathan, Update, IOO, IMC completely misaligned 
Came this morning, opened the PSL and there was not even a beam on the MC REFL.

Looking at the big monitor it seems like the WFS signals went through the roof during the "auto-alignment" night session.

I restored the MC alignment from before the misalignment happen and wait for the SUS to damp. Once the RMS values went below 200 I enabled the
Entry  Thu Apr 14 09:04:30 2022, Jordan, Update, VAC, RGA Volume RGA Scans 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG
Prior to venting the RGA volume on Tuesday (4/12/2022) I took an RGA scan of the volume to be vented (RGA+TP1 volume+Manual Gate Valve) to see if there
was a difference after replacing the manual gate valve. Attached is the plot from 4/12/22, and an overlay plot to complare 4/12/22 to 12/10/2021, when
the same volume was scanned with the old (defective) manual gate valve.
Entry  Wed Apr 13 15:57:25 2022, Ian MacMillan, Update, Cameras, Camera Battery Test 
Tested the Nikon batteries for the camera. they are supposed to be 7V batteries but they don't hold a charge. I confirmed this with multi-meter after
charging for days. Ordered new ones Nikon EN-EL9
    Reply  Wed Apr 13 18:55:54 2022, Koji, Update, Cameras, Camera Battery Test 
I believe that the Nikon has an exposure problem and that's why we bought the Canon.

 
Entry  Wed Apr 13 16:23:54 2022, Ian MacMillan, Update, General, Smell in 40m 
[Ian, Paco, JC]

There is a strange smell in the 40m. It smells like a chemically burning smell maybe like a shorted component. I went around with the IR
camera to see if anything was unusually hot but I didn't see anything. The smell seems to be concentrated at the vertex and down the y-arm
Entry  Mon Apr 11 11:00:30 2022, Jancarlo, Update, VAC, C1VAC Reboot and Nitrogen tanks 
[Paco, JC, Ian, Jordan, Chub]

Checking in the morning, I walked over to the Nitrogen tanks to check the levels. Noticed one tank was empty, so I swapped it out. Chub came
over to check the levels and to take note of how many tanks were left available for usage (None). Chub continued to put in a work order for a set of full
Entry  Thu Apr 7 20:41:15 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Gain Plotter Screen_Shot_2022-04-07_at_8.40.23_PM.pngUnknown-3.pngUnknown-4.png
In this file (under Tommy), we have a notebook which runs through a spectrum of frequencies and determines the gain response of the attached filter.
Below we have the output of a high pass filter. We use IQ demodulation to change IQ componets to DC. Then using a butterworth filter, we read out the DC
components and determine the gain's magnitude and phase. However, the phase seems very noisy. This is because the oscillators in the different tiles
Entry  Thu Apr 7 20:37:06 2022, Tommy, Update, Electronics, RFSoC 2x2 Board -- Simple Tone Generator 
In the "Tommy" sub folder, I created a new notebook called "SimpleToneGenerator". This tunes the DAC and ADC mixers to a single frequency
and reads off the Time Series and Fourier components. We can alos easily check the demodulation scheme and implement butterworth filters to check their
function.
Entry  Wed Sep 29 17:10:09 2021, Anchal, Summary, CDS, c1teststand problems summary c1teststand_issues_summary.pdf
[anchal, ian]

We went and collected some information for the overlords to fix the c1teststand DAQ network issue.



from c1teststand, c1bhd and c1sus2 computers were not accessible through ssh. (No route to host). So we restarted both the computers
    Reply  Thu Sep 30 14:09:37 2021, Anchal, Summary, CDS, New way to ssh into c1teststand 
Late elog, original time Wed Sep 29 14:09:59 2021

We opened a new port (22220) in the router to the martian subnetwork which is forwarded to port 22 on c1teststand (192.168.113.245) allowing
direct ssh access to c1teststand computer from the outside world using:
       Reply  Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured 
c1teststand has been restructured. There is no port computer called 'c1teststand' anymore. When you ssh into the c1teststand network using ssh
c1teststand from inside martian or from outside network using the method mentioned in this wiki
page , you would land into chiara (clone) computer and you can navigate into any teststand network computer from there.
    Reply  Mon Oct 4 11:05:44 2021, Anchal, Summary, CDS, c1teststand problems summary 
[Anchal, Paco]

We tried to fix the ntp synchronization in c1teststand today by repeating the steps listed in 40m/16302.
Even though teh cloned fb1 now has the exact same package version, conf & service files, and status, the FE machines (c1bhd and c1sus2) fail to sync
       Reply  Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary 
I don't know anything about mx/open-mx, but you also need open-mx,don't you?


controls@c1ioo:~ 0$ systemctl status *mx*
● open-mx.service - LSB: starts Open-MX driver
          Reply  Tue Oct 5 17:58:52 2021, Anchal, Summary, CDS, c1teststand problems summary 
open-mx service is running successfully on the fb1(clone), c1bhd and c1sus.




Quote:



I don't know
       Reply  Tue Oct 5 18:00:53 2021, Anchal, Summary, CDS, c1teststand time synchronization working now 
Today I got a new router that I used to connect the c1teststand, fb1 and chiara. I was able to see internet access in c1teststand and fb1, but not in
chiara. I'm not sure why that is the case.

The good news is that the ntp server on fb1(clone) is working fine now and both FE computers, c1bhd and c1sus2 are succesfully synchronized to
          Reply  Mon Oct 11 17:31:25 2021, Anchal, Summary, CDS, Fixed mounting of mx devices in fb. daqd_dc is running now. 


             Reply  Mon Oct 11 18:29:35 2021, Anchal, Summary, CDS, Moving forward? 
The teststand has some non-trivial issue with Myrinet card (either software or hardware) which even teh experts are saying they don't remember how
to fix it. CDS with mx was iin use more than a decade ago, so it is hard to find support for issues with it now and will be the same in future. We need
to wrap up this test procedure one way or another now, so I have following two options moving forward:
                Reply  Tue Oct 12 17:20:12 2021, Anchal, Summary, CDS, Connected c1sus2 to martian network 
I connected c1sus2 to the martian network by splitting the c1sim connection with a 5-way switch. I also ran another ethernet cable from the second port
of c1sus2 to the DAQ network switch on 1X7.

Then I logged into chiara and added the following in chiara:/etc/dhcp/dhcpd.conf :
                   Reply  Tue Oct 12 23:42:56 2021, Koji, Summary, CDS, Connected c1sus2 to martian network 
Don't you need to add the new hosts to /diskless/root/etc/rtsystab at fb1? --> There looks many elogs talking about editing "rtsystab".


controls@fb1:/diskless/root/etc 0$ cat rtsystab
#
                      Reply  Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good! CDS_screens_running.png
Three extra steps (when adding new models, new FE):


Chris pointed out that the sudo command in c1sus2 is giving
error

sudo: unable to resolve host c1sus2

This
error comes in when the computer could not figure out it's own hostname. Since FEs are network booted off the fb1, we need to update the /etc/hosts
                         Reply  Tue Oct 19 18:20:33 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test data3_Plots.pdfdata2_Plots.pdf
I ran a DAC to ADC test on c1sus2 channels where I hooked up the outputs on the DAC to the input channels on the ADC. We used different combinations
of ADCs and DACs to make sure that there were no errors that cancel each other out in the end. I took a transfer function across these channel combinations
to reproduce figure 1 in T2000188.
                            Reply  Tue Oct 19 23:43:09 2021, Koji, Summary, CDS, c1sus2 DAC to ADC test P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg
(Because of a totally unrelated reason) I was checking the electronics units for the upgrade. And I realized that the electronics units at the
test stand have not been properly powered.

I found that the AA/AI stack at the test stand (Attachment 1) has an unusual powering configuration (Attachment 2).
                               Reply  Wed Oct 20 11:48:27 2021, Anchal, Summary, CDS, Power supple configured correctly. 
This was horrible! That's my bad, I should have checked the configuration before assuming that it is right.

I fixed the power supply configuration. Now the strip has two rails of +/- 18V and the GND is referenced to power supply earth GND.

Ian should redo the tests.
                               Reply  Tue Oct 26 18:24:00 2021, Ian MacMillan, Summary, CDS, c1sus2 DAC to ADC test data2_Plots.pdfdata3_Plots.pdf
[Ian, Anchal, Paco]

After the Koji found that there was a problem with the power source Anchal and I
fixed the power then reran the measurment. The only change this time around is that I increased the excitation amplitude to 100. In the first run the excitation
                         Reply  Wed Dec 22 17:40:22 2021, Anchal, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs 
[Anchal, Koji]

I've updated the c1su2 model today with model suspension blocks for the 7 new SOSs (LO1, LO2, AS1, AS4, SR2, PR2 and PR3). The model is running
properly now but we had some difficulty in getting it to run.
                            Reply  Wed Dec 29 20:09:40 2021, rana, Summary, CDS, c1su2 model updated with SUS damping blocks for 7 SOSs 
We want to maintain the 16 kHz sample rate for the COIL DAQ channels, but nothing wrong with reducing the others.

I would suggest setting the DQ sample rates to 256 Hz for the SUS DAMP channels and 1024 Hz for the OPLEV channels (for noise diagnostics).

Maybe you can put these numbers into a new library part and we can have the best of all worlds?
                            Reply  Fri Mar 4 11:04:34 2022, Anchal, Summary, CDS, c1susaux2 system setup and running 40mBHD_C1SUSAUX2_Acromag_Chassis.pdf
I took the c1teststand computer from teststand and converted it into c1susaux2. To do so, I installed a fresh copy of debian 10 on it and followed the
steps on this wiki page. I did some parts slightly differently though. The directory /cvs/cds/caltecg/c1susaux2
is a repository and contains the service unit file modbusIOC.service
                               Reply  Mon Mar 7 19:38:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls issues 
I tried to perform a simple enabling test of coils using c1susaux2 modbus channels but failed. I'm able to do the enabling of coils using the windows
GUI of acromag card but I can not do it when the cards are connected to the computer subnetwork. The issue is two-fold:


The enable channels such as C1:SUS-LO1_UL_ENABLE are not changing values when their DOL changes a value. In this case, I created a calc
                               Reply  Mon Mar 14 12:20:05 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis installed BHD_WatchDogs.png40mBHD_C1SUSAUX2_Acromag_Chassis.pdf
[Anchal, Yehonathan, Ian]

We installed c1susaux2 acromag chassis in 1Y0 with c1susaux2 computer. We connected PD monitors, Binary inputs, Binary outputs, and Run/Acquire
RTS signals for 6 of the 7 suspensions. We ran out of DB9 cables to connect PR3. Of the ones that were connected, LO2, AS1, AS4, SR2, and PR2 are showing
                                  Reply  Thu Mar 17 19:12:44 2022, Anchal, Summary, CDS, c1auxey1 slow controls acromag chassis installed, not powered 
[Anchal, Tega]

We installed c1auxey1 computer and the acromag chassis in 1Y4. The computer has been configured properly for nfs mounts to happen and we have
initialized a git repo for /cvs/cds/caltech/target/c1auxey1 directory which stores all files for running modbusIOC service on this computer. We connected
                                     Reply  Fri Mar 18 18:39:13 2022, Yehonathan, Summary, CDS, c1auxey1 slow controls acromag chassis installed, powered 
{Yehonathan, Anchal}

We connected the c1auxey1 chassie to the different boxes (coil drivers, SAT amp, etc.) using DB9 cables and labeling them in the process. We
ran out of 2.5 foot DB9 cables so we used 5 foot as a temporary solution.
                                        Reply  Fri Mar 18 19:10:51 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues 
I started the modbusIOC service on c1auxey1 and added PD variance channels for UR and SD as well.  There are unfortunately two issues here:


The enable monitors are reading NOT of what they should read. The optical isolator circuit might need to be changed.
ETMY
is not damping now. This is strange and was seen in the use to other acromag chassis as well where AS4 and PR2 are unable to damp. This is weird
                                           Reply  Mon Mar 21 18:42:06 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues 
Another issue, Green Y Shutter can not be controlled with the EPICS controls right now. This needs to be investigated.
                                  Reply  Mon Apr 4 17:03:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis fixed and installed Screenshot_2022-04-04_17-03-26.png
[Anchal, JC, Ian, Paco]

We have now fixed all issues with the PD mons of c1susaux2 chassis. The slow channels are now reading same values as the fast channels and there
is no arbitrary offset. The binary channels are all working now except for LO2 UL which keeps showing ENABLE OFF. This was an issue earlier on LO1 UR and
                            Reply  Tue Mar 15 11:52:34 2022, Anchal, Summary, CDS, c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card c1su2.pdf
I routed the XXX_COIL_DW signals from the 7 SOS blocks in c1su2.mdl (located at /cvs/cds/rtcds/userapps/trunk/sus/c1/models/c1su2.mdl) to the binary
outputs from the FE model. The routing is done such that when these binary outputs are routed through the binary interface card mounted on 1Y0, they go
to the acromag chassis just installed and from there they go to the binary inputs of the coil drivers together with the acromag controlled coil outputs.
                               Reply  Tue Mar 15 14:10:41 2022, Anchal, Summary, CDS, c1su2 model remade, reinstalled, restarted after the update 
I have restarted c1su2 model with the connections of Run Acquire switch to analog filters on coil drivers. Following steps were taken:

First ssh to c1sus2 and then:


controls@c1sus2:~
             Reply  Tue Oct 12 17:10:56 2021, Anchal, Summary, CDS, Some more information 
Chris pointed out some information displaying scripts, that show if the DAQ network is working or not. I thought it would be nice to log this information
here as well.


controls@fb1:/opt/mx/bin 0$ ./mx_info
MX
Entry  Wed Mar 9 11:52:18 2022, Yehonathan, Update, BHD, Simplified BHD readout sketch on ITMY table ITMY_Table_Sketch.drawio.pdf
I have made an editable draw.io diagram of the planned
simplified BHD setup on the ITMY table (see attached).  10 pts = 1 inch.

This is very sketchy but easily adjustable since we are removing everything but the ITMY Oplev from that table.
    Reply  Wed Mar 9 12:57:52 2022, Koji, Update, BHD, Simplified BHD readout sketch on ITMY table 
- BHD beams were already mixed in the chamber. So we don't need a BS on the table. (Probably there is no BS already)

- We don't need to split each BHD beam. One PD per BHD beam is OK for now.

- Check if the BHD paths have reasonable angles from the windows so that the beams do not hit the chamber wall.
    Reply  Fri Apr 1 14:26:50 2022, Tega, Update, Optical Levers, Simplified sketch on MC table MC_Table.drawio.pdf
Here is an early sketch of the MC table. 

 




       Reply  Fri Apr 1 17:02:02 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
We are supposed to have BS Oplev Beams. We don't like the shallow angle reflections (i.e. AOI>45deg).

The laser is too big but I suspect the other components are too small. So it'd be check the actual size of the components including the optical
mounts that are missing on the figure so far.
          Reply  Fri Apr 1 22:22:29 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
Possibility to swap BS and ITMX tables:
BS table, which Tega said MC table, is 2ft x 4ft. The ITMX table is 3ft x 5ft and only the central 2ft x 4ft area is used. The area around the BS
table is the narrowest for the east arm. We need at least (2+delta) ft of the hallway width so that we can move the instrument. I'm not yet sure if
             Reply  Mon Apr 4 15:49:06 2022, Tega, Update, Optical Levers, Simplified sketch on BS table BS_Table.drawio.pdf
I have updated the BS table using feedback from Koji and Paco and the attached pdf document is the latest iteration.
Entry  Wed Oct 20 11:16:21 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber PXL_20211020_183728734.jpg
I have placed a GT321 particle counter on top of the MC1/MC3 chamber next to the BS chamber. The serial cable is connected to c1psl computer on 1X2 using
2 usb extenders (blue in color) over the PSL enclosure and over the 1X1 rack.

The main serial communication script for this counter by Radhika is present in 40m/labutils/serial_com/gt321.py.
    Reply  Thu Oct 21 11:41:31 2021, Anchal, Summary, PEM, Particle counter setup near BS Chamber ParticleCountData20211021.pdf
The particle count channel names were changes yesterday to follow naming conventions used at the sites. Following are the new names:

C1:PEM-BS_DUST_300NM
C1:PEM-BS_DUST_500NM
       Reply  Thu Oct 21 15:22:35 2021, rana, Summary, PEM, Particle counter setup near BS Chamber 
SVG doesn't work in my browser(s). Can we use PDF as our standard for all graphics other than photos (PNG/JPG) ?
    Reply  Thu Oct 21 15:24:35 2021, rana, Summary, PEM, Particle counter setup near BS Chamber 
rethinking what I said on Wednesday - its not a good idea to put the particle counter on a vac chamber with optics inside.
The rumble from the air pump shows up in the acoustic noise of the interferometer. Let's look for a way to mount it near the BS chamber, but attached
to something other than vacuum chambers and optical tables.
       Reply  Fri Oct 22 17:35:08 2021, Ian MacMillan, Summary, PEM, Particle counter setup near BS Chamber 
I have done some reading about where would be the best place to put the particle counter. The ISO standard (14644-1:2015) for cleanrooms is one
every 1000 m^2 so one for every 30m x 30m space. We should have the particle counter reasonably close to the open chamber and all the manufactures that
I read about suggest a little more than 1 every 30x30m. We will have it much closer than this so it is nice to know that it should still get a good reading.
          Reply  Fri Apr 1 14:26:19 2022, Ian MacMillan, Summary, PEM, Particle counter setup near BS Chamber IMG_1407.jpg
I mounted the particle counter over the BS chamber attached to the cable tray as seen in Attachment 1. The signal cable runs through an active
30ft cable to the 1x2 rack. the wire is labeled and runs properly through the cable tray. The particle counter is plugged in at the power strip
attached near the cable tray. The power cord is also labeled. 
             Reply  Sat Apr 2 15:46:13 2022, rana, Summary, PEM, Particle counter setup near BS Chamber 
nice - please update the particle counter page in the 40m wiki. Its probably years out of date.




Quote:



I mounted the particle
Entry  Tue Mar 29 17:35:54 2022, Paco, Update, SUS, Damping fix on BS, AS4, PR2, and PR3 
[Ian, Paco]


We removed the "cheby" filters from AS4, PR2 and PR3 which had been misplaced after copying from the old SUS models. After
removing them, the new SOS damped fine. Note that because of the Input matrices, the filters have to be enabled all at once for the MIMO loop to make sense.
We
Entry  Tue Mar 29 15:07:11 2022, Tega, Summary, VAC, Opening of MC and ETM chambers 
[Anchal, Chub, Ian, Paco, Tega]

Today, we opened the MC chamber, ETMX chamber and ETMY chamber.
Entry  Tue Feb 22 18:47:51 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement ALL_TF_Graph.pdf20220222_SUSElectronicsReplacement.7z
[Ian, Koji]

In preparation for the replacement of the suspension electronics that control the ETMY, I took measurments of the system excluding the CDS System.
I took transfer functions from the input to the coil drivers to the output of the OSEMs for each sensor: UL, UR, LL, LR,  and SIDE. These graphs are
    Reply  Fri Feb 25 14:00:08 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement IMG_0853.jpgIMG_0852.jpg
[Koji, Ian]

We looked at a few power supplies and we found one that was marked "CHECK IF THIS WORKS" in yellow. We found that the power supply
worked but the indicator light didn't work. I tried a two other lights from other power supplies that did not work but they did not work. Koji ordered
       Reply  Fri Feb 25 14:48:53 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement Before.jpgAfter.jpg
I moved the network-enabled power strip from above the power supplies on rack 1y4 to below. Nothing was powered through the strip when I unplugged everything
and I connected everything to the same port after.
          Reply  Sat Feb 26 23:48:14 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement PXL_20220226_023111179_2.jpg
[Ian, Koji] - Activity on 25th (Fri)

We continued working on the ETMY electronics replacement.

- The units were fixed on the rack along with the rack plan.
             Reply  Mon Feb 28 15:51:07 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement IMG_0865.jpgIMG_0867.jpgIMG_0868.jpgIMG_0866.jpg
[Paco, Ian]

paco helped me wire the ETMY 1Y4 rack. We wired the following (copied from Koji's email):


Use DB9-DB9 to complete the wiring between

16bit DAC AI Chassis - End DAC Adapter (4 cables)
End DAC Adapter
                Reply  Thu Mar 3 04:11:36 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement PXL_20220303_082726693.jpgPXL_20220303_082752494.jpgPXL_20220303_082744464.jpg
For the Y-end electronics replacement, we want to remove unused power supplies. In fact, we already removed the +/-5V supplies from the stack. I was
checking what supply voltages are used by the Eurocard modules. I found that D990399 QPD whitening board
had the possible use of +/-5V.
                   Reply  Thu Mar 3 04:24:23 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement PXL_20220303_094421604.jpgPXL_20220303_094435127.jpg
The DC power strip at Y-end was connected to the bottom two Sorensen power supplies. They are configured to provide +/-18V.

 
                      Reply  Thu Mar 3 17:21:11 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement 
[Koji, Ian]

1) We attached the 30 coil driving cables to the vacuum feed through to the sat amp  [40m
wiki] they run along the cable tray then up and down into the rack.
                         Reply  Sat Mar 5 02:03:46 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement 6x
Oplev saga

Summary 

- The new coil driver had not enough alignment range to bring the oplev beam back to the QPD center
                            Reply  Mon Mar 21 14:22:52 2022, Anchal, Update, SUS, ETMY Alignmnet offsets needed to be changed 
I'm not sure why but the PIT and YAW offset values of +2725 and -2341 were not sufficient for the reflected OPLEV beam to reach the OPLEV QPD. I
had to change the C1:SUS-ETMY_PIT_OFFSET to 5641 and C1:SUS-ETMY_YAW_OFFSET to -4820 to come back to center of the OPLEV QPD. We aligned the Oplevs to
center before venting, so hopefully this is our desired ETMY position.
       Reply  Tue Mar 1 19:26:24 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement PXL_20220302_025723651.jpgPXL_20220302_030102033.MP.jpg
The replacement key switches and Ne Indicators came in. They were replaced and work fine now.

The power supply units were tested with the X end HeNe display. It turned out that one unit has the supply module for 1350V 4.9mA while the other
two do 1700V 4.9mA.
    Reply  Mon Mar 7 16:44:15 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 6x
Now that the ETMSUS is back up and running I reran my measurements from the beginning of the
process. The results below show a change in gain between the before and after measurements. I have given values of the low-frequency section below.

Average Gain difference from the TFs: 18.867  (excluding thee side change)
       Reply  Fri Mar 11 16:43:03 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 
I updated the gain of the ct2um filter on the OSEMS for ETMY and decreased their gain by a factor of 9 from 0.36 to 0.04.

I added a filter called "gain_offset" to all the coils except for side and added a gain of 0.48.

together these should negate the added gain from the electronics replacement of the ETMY
          Reply  Fri Mar 25 11:39:14 2022, Anchal, Update, SUS, ETMY SUS Electronics Replacement - Questions 
After Ian updated the cts2um filters for OSEM, shouldn't the damping gains be increased back by factor of 10 to previos values? Was the damping gain
for SIDE ever changed? we found it at 250.

Can you explain why gain_offset filter was required and why this wasn't done for the side coil?
             Reply  Mon Mar 28 16:25:34 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement - Questions 
The point of changing the gains was to return the system to its origional state. ie I wanted the over all gain of the physical components to be the same
as when we started. From the CDS side of things nothing else should be changed. The damping filters should remain at their origional values. The cts2um
filter was changed to counteract a change in the electronics (replacing them). These changes should cancel eachother out. As for the side control, on 3/4/22
    Reply  Thu Mar 17 11:40:41 2022, Paco, Update, SUS, ETMY green PZT HV supply 
[Anchal, Paco]

We installed a HV kepco power supply for the green PZT steering the YAUX beam. We did this in anticipation of the YARM alignment to take place
this afternoon. We borrowed an unused DC power supply labeled "OMC Power spply" and made an appropriate SMA connection (Attachment #1),
Entry  Thu Mar 17 16:50:53 2022, Paco, Update, BHD, XARM AUX alignment 
[Ian, Paco]

We opened the ITMX chamber and


Inspected PR2 and LO1 and didn't see anything suspicious.
Took the EQ stops off ITMX in preparation for alignment


    Reply  Fri Mar 18 17:15:19 2022, Paco, Update, BHD, XARM AUX alignment cont. Screen_Shot_2022-03-18_at_4.09.38_PM.png
[Paco, Ian]

First, we re-balanced the ITMX OSEMs so that they would damp at around half-a-shadow.


Then, we set up a clean camera inside ITMX chamber looking at the ITMX optic. Then, using the live feed we aligned the AUX beam from
       Reply  Mon Mar 21 18:00:05 2022, Ian MacMillan, Update, BHD, XARM AUX alignment cont. PXL_20220322_015247138.jpg
[Ian, Paco]

Continuing with the previous alignment that we stoped on friday, we re set up my heavily cleaned iPhone on FaceTime. The Phone alowed us to see
the laser on the ITMX and center it on that optic.
Entry  Tue Mar 15 13:49:44 2022, Ian MacMillan, Bureaucracy, Treasure, New Screwdriver Bits 
I have received the new screwdriver bits that will work with the two electric screwdrivers we have. I have distributed them in the 40m. Some are in the
electronics stations and some are in the toolbox in the lab. The new electric screwdriver (which looks like a drill but takes typical screwdriver bits)
is in the room with the workshop. It is in the blue Makita box. For some reason, lots of the old bits were rounded because of incorrect use. I have thrown
Entry  Tue Mar 15 10:45:31 2022, Paco, Update, General, Assembled small in-vac optics 
[Paco]

This morning I assembled LO3, LO4 and AS3 (all mirrors) onto polaris K1 mounts. The mounts stand as per this
elog, on 4.5" posts with 0.5" Al spacers to match the beam heigth of 5.5". I also assembled ASL by adding a 0.14"
Entry  Thu Mar 10 10:05:49 2022, Paco, Update, SUS, AS1 free swing test SUS_Input_Matrix_Diagonalization.pdf
[Paco, Ian]


Begin free swinging test for AS1 at 10:05 AM, set for ~ 2.04 hours.

Test failed because damping failed to disable.


Restart
free swinging test for AS1 at 15:06, set for 2.04 hours.

Success (Attachment #1 shows the DOF
Entry  Thu Mar 10 09:39:59 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #2 3-09-2022.PNG3-10-2022.PNG
This morning Chub and I leak checked the manual gate valve with the RGA and helium. There was no change in the helium partial pressure while spraying
helium around the flanges, all looks good.

 
Entry  Wed Mar 9 10:23:28 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #1 
Jordan, Chub, Paco

Chub and I went into the lab this morning to leak check the new gate valve after pumping over the weekend. This would be done through the RGA
and spraying helium around the newly installed flanges. The RGA is set to monitor the partial pressure of helium versus time and we visually watch for
Entry  Tue Feb 2 17:09:17 2021, yehonathan, Update, BHD, SOS assembly 20210202_165501.jpg20210202_162452.jpg
I set up a working area on the table next to the south flow bench (see attachment). I also brought in a rolling table for some extra space.

I covered all the working surfaces with a foil from the big roll between 1x3 and 1x4.

I took the SOSs, SOS parts and the OSEMS from the MC2 table to the working area.
    Reply  Tue Feb 2 18:24:54 2021, Koji, Update, BHD, SOS assembly 
You can remove the components of the optical table enclosure (black ones) and use the optical table as your working area too.

 
       Reply  Thu Feb 4 15:14:55 2021, Yehonathan, Update, BHD, SOS assembly 20210204_144007.jpg
I gathered all the components I could find from the SOS towers and the cleanroom and put it all on the table next to the flow bench (See attachment).

I combed through the cleanroom cabinet for SOS parts but didn't find all the parts listed in the procurement
spreadsheet. I did find some extra items that were not listed.
          Reply  Tue Feb 16 13:13:39 2021, Yehonathan, Update, BHD, SOS assembly 
Gautam pointed out that there are extra Sm-Co magnets stored in the clean optics cabinet.

I took the magnet box out and put it on the rolling table next to south flow bench. The box contains 3 envelopes with magnets.

They are labelled as following:
             Reply  Tue Feb 16 15:29:01 2021, Koji, Update, BHD, SOS assembly 
The curie temp of SmCo seems about x2 (in K) of the one for NdFeB. i.e. 600K vs 1000K. So I believe 177degC = 450K is not an issue. Just make sure the
curie temp, referring the specific property for the magnets from this company. (You already know the company from the procurement doc). It'd be great
if you upload the doc on the 40m wiki.
                Reply  Tue Feb 16 22:59:36 2021, Yehonathan, Update, BHD, SOS assembly 
Done.

Also, the magnets are nickel-plated. I guess that doesn't matter for the baking (Curie temp of 355 °C)?




Quote:


                   Reply  Fri Feb 19 12:21:04 2021, Yehonathan, Update, BHD, SOS assembly 
A summary of things that need to be fabricated/purchased/done:




Part
What needs to be done
How much more needed


                      Reply  Fri Mar 26 10:25:37 2021, Yehonathan, Update, BHD, SOS assembly 
I measure some of the dowel pins we got from Mcmaster with a caliper.

One small pin is 0.093" in diameter and 0.376" in length. The other sampled small pin has the same dimensions.

One big pin is 0.187" in diameter and 0.505" in length. The other is 0.187" in diameter and 0.506" in length.
                         Reply  Tue Apr 6 15:42:57 2021, Yehonathan, Update, BHD, SOS assembly 20210406_150724.png
We got some dumbells from Re-Source Manufacturing (see attached). I picked 3 in random and measured their dimensions:

1. 0.0760" in diameter, 0.0860" in length

2. 0.0760" in diameter, 0.0860" in length
                            Reply  Fri Apr 9 20:54:54 2021, Yehonathan, Update, BHD, SOS assembly 20210409_202717.jpg20210409_202755.jpg
Today I assembled the skeleton of 6 towers, without clamps and sensor assembly (attachment 1).

Some of the side plates have this weird hole that doesn't fit any of the suspension blocks (attachment 2). I didn't notice when I counted
the parts and now there are exactly enough side plates to assemble 7 towers.
                               Reply  Mon Apr 12 17:30:11 2021, Yehonathan, Update, BHD, SOS assembly 20210412_170913.jpg
Today, I screwed the plungers on the sensor plates and installed them on the Towers. I also installed the wire clamps on the suspension blocks (attachment).

I ran into problems in 2 separate suspension blocks: one had a dowel pin that was slightly too fat for the wire clamp. In another, the
tapped holes were too short so that the 4-40 screws couldn't be screwed all the way.
                                  Reply  Mon May 3 16:49:04 2021, Yehonathan, Update, BHD, SOS assembly 20210503_161422.png20210503_161456.jpg
I found a "vice" in the cleanroom (attachment 1). I used it to push dowel pins into the last suspension block using some alcohol as a lubricant.

I then assembled the 7th and last suspension tower (attachment 2).

Things that need to be done:
                                     Reply  Tue Jun 1 16:17:06 2021, Yehonathan, Update, BHD, SOS assembly 
I tried to push the clean Viton tips into the vented screws just to find out that the vented holes are too small. We need to drill 0.1" diameter
holes about 0.1" deep into these screws and clean them again.

 
                                        Reply  Wed Jun 2 01:03:19 2021, Koji, Update, BHD, SOS assembly 
Can you just cut the viton tips smaller? If you cut it to have some wedge (or say, taper), it can get stuck with the vent hole.

 
                                           Reply  Fri Jun 18 19:02:00 2021, Yehonathan, Update, BHD, SOS assembly 20210618_115017.jpgUntitled_2.png20210618_160041_HDR.jpg
Today I glued some magnets to dumbells.

First, I took 6 magnets (the maximum I can glue in one go) and divided them into 3 north and 3 south. Each triplet on a different razor (attachment
1).
                                              Reply  Fri Jun 18 23:53:08 2021, Koji, Update, BHD, SOS assembly 
Then, can we replace the four small EQ stops at the bottom (barrel surface) with two 1/4-20 EQ stops? This will require drilling the bottom EQ stop holders
(two per SOS).

 
                                                 Reply  Tue Jun 22 17:05:26 2021, Yehonathan, Update, BHD, SOS assembly 
According to the schematics, the distance between the original EQ tap holes is 0.5". Given that the original
tap holes' diameter is 0.13" there is enough room for a 1/4" drill.




                                                    Reply  Tue Jul 27 17:14:18 2021, Yehonathan, Update, BHD, SOS assembly 20210727_154506.png
Jordan has made 1/4" tap holes in the lower EQ stop holders (attachment). The 1/4" stops (schematics)
fit nicely in them. Also, they are about the same length as the small EQ stops, so they can be used.

However, counting all the 1/4"-3/4" vented screws we have shows that we are missing 2 screws to cover all the 7 SOSs. We can either:
                                                       Reply  Tue Jul 27 20:12:53 2021, Koji, Update, BHD, SOS assembly 
1 or 2. The stained ones are just fine. If you find the vented 1/4-20 screws in the clean room, you can use them.

For the 28 screws, yeah find some spares in the clean room (faster), otherwise just order.
                                              Reply  Mon Jun 28 12:35:19 2021, Yehonathan, Update, BHD, SOS assembly toomuchglue1.pngtoomuchglue2.pngdirtydumbell.pngcleandumbell.pngassembly_on_metalbracket.png
On Thursday, I glued another set of 6 dumbells+magnets using the same method as before. I made sure that dumbells are pressed onto the magnets.

I came in today to check the gluing situation. The situation looks much better than before. It seems like the glue is stable against small forces
(magnetic etc.). I checked the assemblies under a microscope.
                                                 Reply  Tue Jun 29 20:45:52 2021, Yehonathan, Update, BHD, SOS assembly 20210629_135736.jpg20210629_135746.jpg
I glued another batch of 6 magnet+dumbell assemblies. I will take a look at them under the microscope once they are cured.

I also hanged a weight of ~150g from a sample dumbell made in the previous batch (attachments) to test the magnet+dumbell bonding strength.
                                                    Reply  Thu Jul 1 16:45:25 2021, Yehonathan, Update, BHD, SOS assembly 
The bonding test passed - the weight still hangs from the dumbell. Unfortunately, I broke the bond trying to release the assembly from the bracket. I
made another batch of 6 dumbell+magnet.

I used some of the leftover epoxy to bond an assembly from the previous batch to a bracket so I can test it.
                                                       Reply  Wed Jul 28 12:00:35 2021, Yehonathan, Update, BHD, SOS assembly 
After receiving two new tubes of EP-30 I resumed the gluing activities. I made a spreadsheet
to track the assemblies that have been made, their position on the metal sheet in the cleanroom, their magnetic field, and the batch number.

I made another batch of 6 magnets yesterday (4th batch), the assembly from the 2nd batch is currently being tested for bonding strength.
                                                          Reply  Thu Sep 23 18:18:07 2021, Yehonathan, Update, BHD, SOS assembly dumbell_before.pngdumbell_after.png
I have noticed that the dumbells coming back from C&B had glue residues on them. An example is shown in attachment 1: it can be seen that half of
the dumbell's surface is covered with glue.

Jordan gave me a P800 sandpaper to remove the glue. I picked the dumbells with the dirty face down and slid them over the sandpaper in 8 figures
                                                             Reply  Tue Oct 26 10:17:14 2021, Yehonathan, Update, BHD, SOS assembly 
Things that I need to start suspending optics:

1. Winch adapter plate (D970314). Might need to make one.

2. Quad photodetector
                                                                Reply  Thu Oct 28 23:13:19 2021, Yehonathan, Update, BHD, SOS assembly OpLev_Setup.jpgsuspended_optic.png20211029_113011.jpg20211029_113052.jpg
{Tega, Yehonathan, Koji}

Suspension of a Dummy Optic

We
gathered the components needed for suspending a 2" optic housed in a 3" ring adapter:
                                                                   Reply  Tue Nov 2 15:02:03 2021, Yehonathan, Update, BHD, SOS assembly FreeSwingingSpectra.pdf
{Yehonathan, Tega}

We took the free-swinging spectra of the OpLev in the X and Y direction.

To make the motion of the optic quiet we turned off the airflow on the optical bench and moved the QPD close to the SOS so that the laser beam
                                                                      Reply  Tue Nov 2 22:50:30 2021, Koji, Update, BHD, SOS assembly 
2.5Hz is surprising. Can you move it down to sub 1Hz by adding a socket cap screw at the top instead of the set screw for the Teflon piece? How much
mass do you need to add?
                                                                         Reply  Mon Nov 8 17:22:27 2021, Yehonathan, Update, BHD, SOS assembly Magnets_Positions.pngAdapters_Order.png
Big Gluing Day

Today I glued the magnet+dumbell assemblies on the optics adapters.

Unlike magnet gluing on a 3" optic where one can use a magnet gluing fixture, here I had to position the magnets manually. There is a complication
                                                                            Reply  Tue Nov 9 11:11:37 2021, Yehonathan, Update, BHD, SOS assembly 20211109_110408.jpg
The gluing was mostly successful. Only two magnets didn't stick (see attachment).
                                                                               Reply  Fri Nov 12 23:47:29 2021, Yehonathan, Update, BHD, SOS assembly 
{Tega, Yehonathan}

First attempt at the suspension of a Lambda Optic mirror

We found the box with the 2" Lambda Optic mirrors in the cleanroom. We choose to suspend a mirror with a ROC = 5m, probably LO1.
                                                                                  Reply  Tue Nov 16 17:42:46 2021, Yehonathan, Update, BHD, SOS assembly 20211115_170320_HDR.jpg20211116_163846.jpgmagnet_height_check(1).pngside_blcok_touching_1.pngside_blcok_touching_2.png
{Tega, Yehonathan}

Another attempt at the suspension of a Lambda Optic mirror

The lambda mirror was removed from the adapter whose magnets were knocked off. We tried to mount the mirror on a different adapter but we knocked
                                                                                     Reply  Tue Nov 16 18:28:53 2021, Koji, Update, BHD, SOS assembly D2100546_Wire_Block.pdfD2100546_Wire_Block.png
Yehonathan told me that the wires are touching between the clamps! I went back to the CAD and confirmed
it is really happening. Sad.

The distance of the wires at the upper clamp is 17.018mm.
                                                                                        Reply  Wed Nov 24 14:15:15 2021, Yehonathan, Update, BHD, SOS assembly 
Late update. We got 2 modified side blocks from Jordan a few days ago. Yesterday, I glued a side magnet to one of the modified side blocks.

I took the opportunity to reglue some magnets that were knocked off from the adapters. I did this for 2 adapters only since w need 4 shallow
adapters and we already had 2 complete ones.
                                                                                           Reply  Wed Dec 1 12:57:08 2021, Yehonathan, Update, BHD, SOS assembly 7x
{Yehonathan, Tega}

We glued some magnets onto modified side blocks. We followed pretty much the same procedure form last time. The music wires were clamped on the
side blocks away from the optic adapter. The clamps were screwed down using the low profile screws the Jordan obtained from UC components to allow maximum
                                                                                              Reply  Mon Dec 6 18:23:04 2021, Yehonathan, Update, BHD, SOS assembly signal-2021-12-06-165751_001.jpeg
I installed OSEMs on the LO1 SOS. To my surprise, the side magnet is not in the center of the side OSEM. It completely misses the LED as can be seen
in the attachment.

Looking at the CAD model, it turns out the position of the OSEM on the left side plate is different from the position of the OSEM on the right
                                                                                                 Reply  Thu Dec 9 21:57:35 2021, Yehonathan, Update, BHD, SOS assembly balancingsos2.pngFreeSwingingSpectra.pdf
{Yehonathan, Tega}

We took the optic out of the SOS tower and removed the side blocks. We mounted new side blocks with wires already clamped in them in the reverse
order.
                                                                                                    Reply  Tue Dec 14 14:02:33 2021, Yehonathan, Update, BHD, SOS assembly magnetcentring.pngFreeSwingingSpectra.pdf
{Yehonathan, Paco}

I fixed the overall height of the adapter (attachment 1). I put an OSEM next to the side magnet. I positioned a camera in front of the SOS and
connected it to my laptop for live streaming. I painted a line indicating the height of the OSEM plates and a line in between with the mean height. I discarded
                                                                                                       Reply  Wed Dec 15 22:09:53 2021, Yehonathan, Update, BHD, SOS assembly 
{Paco, Yehonathan, Anchal}

I cut the wires from the winches and removed the winch adapter plate. I engrave  'LO1' on the SOS tower. Me and Paco wrapped the
SOS with foil and transported it to Anchal who put it inside the ITMX chamber.
                                                                                                          Reply  Thu Dec 16 18:16:36 2021, Yehonathan, Update, BHD, SOS assembly chippedmirror.pngIMG_6311.JPGIMG_6310.JPGIMG_6309.JPG
Today I glued magnets onto the new 3/4" mirror adapters. I also took the opportunity to make some more side magnets assemblies.

Yesterday I mounted PR3/SR2 3/4" thick mirror onto one of the new adapter. There seem to be no issues for now.

I started the process of suspending AS1 (E2000226-A). The Lambda Optic mirror with the closest
                                                                                                             Reply  Fri Dec 17 17:50:17 2021, Yehonathan, Update, BHD, SOS assembly AS1rollbalance.pngAS1Magnet_height.pngghostbeam.pnglambdaopticarrow.jpg
I threaded a new wire through a different side block with a magnet and clamped it under a microscope. It was hard, but eventually, I was able to do it
by holding the wire on both sides of the side block with weights.

The dented wire was discarded and the side block that was mounted on the AS1 adapter was put aside. I mounted the side block with the new wire
                                                                                                                Reply  Fri Dec 17 19:16:45 2021, Koji, Update, BHD, SOS assembly 
We @40m do the convention of the arrow at the thinnest side & pointing the HR side, but nobody says Lambda does the same.

We can just remount the mirror without breaking the wires and adjust the pitching if you do it carefully.

Does this mean that the LO1 also likely to have the wedge pointing up? Or did you rotate the mirror to have the wedge reflection to be as horizontal
                                                                                                                   Reply  Fri Dec 17 22:16:07 2021, Yehonathan, Update, BHD, SOS assembly 
I specifically checked the specification before mounting the mirror. It says clearly "Arrow at
the thinnest location pointing towards Side 1". I guess they just ignored it.

As for LO1, I mounted it without noticing the location of the arrow. Later, I checked and the ghost beam was horizontal so I left it as it is.
                                                                                                                      Reply  Sat Dec 18 00:56:14 2021, Koji, Update, BHD, SOS assembly 
Sad... We just need to check the wedge direction everytime, unfortunately.

Pencil: can you try to gently wipe it off with solvent & a swab? (IPA / Acetone)
If it does not come off in the end, it's all right to leave. Do we want to scribe the arrow mark? You need a diamond pen.
                                                                                                                         Reply  Mon Dec 20 13:52:01 2021, Koji, Update, BHD, SOS assembly 
LO1: No need to remove the pencil mark for the damping test. Until we see serious contamination on the LO1 optic, we don't need
to take the optic off from the mount and clean it. If there is a chance of rehanging (because of a broken wire/etc), we do wipe the pencil mark.

Other optics: wipe the pencil mark as much as possible.
                                                                                                                            Reply  Mon Dec 20 17:26:13 2021, Yehonathan, Update, BHD, SOS assembly 7x
{Yehonathan, Anchal}

I released the AS1 wires from the winches, removed the adapter from the SOS tower, and removed the Lambda optic from the adapter. Attachment
1 shows the pencil markings on the optic before cleaning. I cleaned the pencil marking from the side of the optic with acetone using swabs until there
                                                                                                                               Reply  Tue Dec 21 18:04:46 2021, Yehonathan, Update, BHD, SOS assembly 
I locked the EQ stops while retaining the XY alignment on the QPD and installed 5 green OSEMs. AS1 is ready for transfer into the vacuum chamber.
                                                                                                                                  Reply  Tue Jan 4 18:27:23 2022, Paco, Update, BHD, SOS assembly -- PR3 PR3_roll_balance.pngPR3_magnet_height.pngFreeSwingingSpectra.pdfPXL_20220104_231742123.jpgPXL_20220104_232809203.jpg
[yehonathan, paco, anchal]

We continue suspending PR3 today. Yehonathan and Paco suspended the thick optic in its adapter. After fixing some nominal height and undoing
any residual roll angle (see Attachments 1,2 for pictures), we noticed a problem with the pitch angle, so we insert the counterweights all the way in.
                                                                                                                                     Reply  Wed Jan 5 19:18:06 2022, Yehonathan, Update, BHD, SOS assembly -- AS4 AS4_roll_balance.pngAS_4_magnet_height.pngFreeSwingingSpectra.pdf
{Paco, Yehonathan, Anchal}

Today we suspended AS4 (E2000226-B). Anchal mounted Lambda Optic mirror with an RoC closest to AS4 in a thin optic mount. He noted that this
                                                                                                                                        Reply  Thu Jan 6 17:00:20 2022, Yehonathan, Update, BHD, SOS assembly -- LO2 LO2_roll_balance.pngLO2_magnet_height.pngFreeSwingingSpectra.pdf
{Paco, Yehonathan}

Today we suspended LO2 (E1800089) which Anchal has loaded into the thick optic
adapter. Attachments 1,2 show the height and roll balance adjustments.
                                                                                                                                           Reply  Thu Jan 6 17:16:51 2022, Yehonathan, Update, BHD, Using Peek screws/nuts 
There were several cases where the long EQ stops didn't perform as expected.

In one type of case, we used a counterweight at the front of the adapter but not in the back leaving a recess where the lower back EQ stop should
touch.
                                                                                                                                           Reply  Fri Jan 7 17:59:45 2022, Yehonathan, Update, BHD, SOS assembly -- SR2 SR2_roll_balance.pngSR2_magnet_height.pngFreeSwingingSpectra.pdf
{Yehonathan, Paco}

{Paco, Yehonathan}

Today we suspended SR2 (E1800089) which Anchal has loaded into the thick optic
                                                                                                                                              Reply  Fri Jan 7 18:24:25 2022, Koji, Update, BHD, SOS assembly -- SR2 
Vacseal in the freezer. It could have been expired sooooo many years ago, We need some cure testing.

Can you release the part numbers of the ordered components (and how/where to use them), so that we can incorporate them into the CAD model?




                                                                                                                                                 Reply  Mon Jan 10 14:00:44 2022, not Koji, Update, BHD, SOS assembly -- SR2 
Yes,

For the thin optics adapter design, we want Peek 1/4-20 screw (part # 98885A131) to replace the lower back long EQ stop. On it, we will have
a Peek washer (part # 93785A600) fastened between two Peek nuts (part #98886A813).
                                                                                                                                                    Reply  Tue Jan 11 09:53:14 2022, not Koji, Update, BHD, SOS assembly -- Peek screws and nuts 
I handed the Peek parts we got from McMaster to Jordan for C&B.
                                                                                                                                                       Reply  Thu Jan 13 16:08:00 2022, Yehonathan, Update, BHD, gluing magnets after AS1/4 misfortune 
{Yehonathan, Anchal, Paco}

In the cleanroom, we removed AS1 and AS4 from their SOS towers. We removed the mirrors from the adapters and put them in their boxes. The broken
magnets were collected from the towers and their surfaces were cleaned as well as the magnet sockets on the two adapters and on the side block from where
                                                                                                                                                          Reply  Fri Jan 14 17:33:10 2022, Yehonathan, Update, BHD, AS4 resurrection AS4_roll_balance2.pngAS4_magnet_height2.pngFreeSwingingSpectra.pdf
{Yehonathan, Anchal}

Came this morning, the gluing of the magnets was 100% successful. Side blocks, counterweights were assembled. We suspend AS4 and adjust the roll
balance and the magnet height (attachments 1,2). OpLev was slightly realigned.
                                                                                                                                                             Reply  Wed Jan 19 18:15:34 2022, Yehonathan, Update, BHD, AS1 resurrection AS1_roll_balance2.pngAS1_magnet_heigh2.pngFreeSwingingSpectra.pdfIMG_6324.JPG
Today I suspended AS1. Anchal helped me with the initial hanging of the optics. Attachments 1,2 show the roll balance and side magnet height. Attachment
3 shows the motion spectra.

The major peaks are at 668mHz, 821mHz, 985mHz.
                                                                                                                                                                Reply  Thu Jan 20 12:10:51 2022, Yehonathan, Update, BHD, AS1 resurrection FreeSwingingSpectra.pdfFreeSwingingSpectra_div_20mV.pdfFreeSwingingSpectra_div_50mV.pdf
I was wondering whether I should take AS1 down to redo the wire clamping on the side blocks. I decided to take the OpLev spectrum again to be more certain.
Attachments 1,2,3 show 3 spectra taken at different times.

They all show the same peaks 744mHz, 810mHz, 1Hz. So I think something went wrong with yesterday's measurement. I will not take AS1 down
                                                                                                                                                                   Reply  Mon Jan 24 17:58:21 2022, Yehonathan, Update, BHD, PR2 Suspension 
I picked up the PR2 mirrors (labeled M1, M2) from Anchel's table and took them to the cleanroom. By inspection, I spotted some dust particles on
M1. I wasn't able to remove them with clean air so I decided to use M2 which looked much cleaner. I wasn't able to discern any wedge angle on the
optic. I inserted the optic into a thin optic adapter. The optic is thicker than I expected so I use long screws for the mirror clamping. I expect that
                                                                                                                                                                      Reply  Tue Jan 25 18:37:12 2022, TYehonathan, Update, BHD, PR2 Suspension PR2_magnet_height.pngPR2_roll_balance.pngFreeSwingingSpectra_div_50mV.pdf
PR2's side magnet height was adjusted and its roll was balanced (attachment 1,2). I verified that the OpLev beam is still aligned. The pitch was
balanced: First, using an iris for rough adjustment. Then, with the QPD. I locked the counterweight setscrew.

I turned off the HEPAs, damped PR2, and measured the QPD spectra (attachment 3). Major peaks are at 690mHz, 953mHz, and 1.05Hz. I screwed back
                                                                                                                                                                         Reply  Thu Feb 24 18:05:58 2022, Yehonathan, Update, BHD, Re-susspension of AS1 signal-2022-02-24-173933_003.jpegsignal-2022-02-24-173933_002.jpeg
{Yehonathan, Anchal, Paco}

Yesterday, Anchal and Paco removed AS1 from the vacuum chamber and moved it into the cleanroom. The suspension wires were cut and the AS1 optic
was put on the table.
                                                                                                                                                                            Reply  Wed Mar 2 14:02:43 2022, Yehonathan, Update, BHD, Re-susspension of AS1 
Yesterday, I rebuilt the OpLev setup in the cleanroom in order to suspend AS1. It took me a while to find all the necessary parts but I found them in
the end.

The HeNe laser was placed on the optical table and turned on. The beam was aimed to bounce off a folding mirror to the SOS tower.
                                                                                                                                                                               Reply  Thu Mar 3 17:09:46 2022, Paco, Update, BHD, Re-susspension of AS1 
[Anchal, Paco]

Wire clamp spare was installed, furthermore AS1 was reinstalled on adapter, attached wire clamps, and cleaned using ionized air gun. Finally,
we suspended it on the SOS tower and left it resting on the bottom earthquake stops; ready for balancing.
                                                                                                                                                                                  Reply  Mon Mar 7 16:56:08 2022, Yehonathan, Update, BHD, Re-susspension of AS1 signal-2022-03-07-171520_001.pngsignal-2022-03-07-172659_001.jpegsignal-2022-03-07-172659_003.jpeg
{Paco, Yehonathan}

We tried to roughly balance the adapter with two counterweights at the front, like with the other thin optics using an iris. As before, we couldn't
get the beam above the iris hole no matter how much we inserted the counterweights into the adapter. We noticed that one of the side blocks is actually
                                                                                                                                                                                     Reply  Mon Mar 7 18:53:16 2022, Koji, Update, BHD, Re-susspension of AS1 
Not sure if that small difference can cause the alignment inability. Particularly, the removed metal was just below the wire. This means that there is
no misalignment effect at the first order.

Here is my idea: 
                                                                                                                                                                                     Reply  Tue Mar 8 12:24:13 2022, Yehonathan, Update, BHD, Re-susspension of AS1 AS1_Roll_Balance.pngAS1_Height_Balance.pngFreeSwingingSpectra_new.pdf
The gluing seemed to be successful. I assembled the side block with the magnet on the adapter. Paco helped me hang the adapter on the SOS tower.

The height and roll of the adapters were balanced (attachment 1,2).

The QPD was placed at the beam reflection. The beam was centered horizontally on the QPD and then measured vertically. The pitch DOF was balanced
                                                                                                                                                                                        Reply  Tue Mar 8 19:29:36 2022, Paco, Update, BHD, Re-balance of AS1 
[Paco]

Installed AS1 in vacuum, near the center of the table, and installed the OSEMs. All OSEMS are "balanced" nominally, i.e. their shadow
is at the halfway point optimum, but fine tuning is required, which I will attempt tomorrow after restoring the AS1 suspension screen settings. Today,
                                                                                                                                                                                           Reply  Wed Mar 9 09:35:26 2022, Paco, Update, BHD, Re-balance of AS1 
[Paco]

AS1 is installed, OSEMs balanced, and the optic damped successfully. We should run the free swinging test overnight to validate this re-installation.