40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 326 of 326  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  13471   Wed Dec 13 09:49:23 2017 johannesUpdateASSwiring diagramI attached a wiring schematic from the
slow DAQ to the eurocrate modules. Of these,
pins 1-32 (or 1A-16C) and pins 33-64 (17A-32C)
 1Y9.pdf 
  4720   Sun May 15 14:01:56 2011 kiwamuUpdateIOOwiring diagram for IP-POSHere is a wiring diagram which shows how
IP-POS (new official name is IB_POS)
is connected.
 ip_pos.png 
  4725   Mon May 16 11:14:36 2011 ranaUpdateIOOwiring diagram for IP-POSJust FYI, the 3113 is a 12-bit ADC, so
we won't get very good resolution out of
these. We should get one of those purple
  
  9425   Mon Nov 25 10:57:14 2013 KojiUpdateCDSwoes on the X-end hostsThis morning I came in the 40m then found 
1) c1auxex was throwing out the same
 Screenshot.png 
  12764   Fri Jan 27 19:40:03 2017 ranaMetaphysicselogword wrapping & large images"Why does the word wrapping not work
in our browsers with ELOG?" I sometimes
wonder. Some of the elogs are fine, but often
  
  4862   Thu Jun 23 02:12:12 2011 SonaliUpdateGreen Lockingwork schedule. June 22-June 24:
1.Coupling
light into fibre at the ETMY.
  
  11324   Tue May 26 11:05:10 2015 SteveUpdatePEMworked around ETMY seism.The cable tray holder cross beam is removed
and cut short for good access to seismometer.
 ETMYseismic.pngcut.jpg 
  12391   Wed Aug 10 10:32:44 2016 SteveUpdateSEIworking Guralps as they areThe saga has started
here  We have to give credit to
the Boss who fixed it. The seismometers themself
 6x 
  2163   Fri Oct 30 04:41:37 2009 robUpdateLockingworking againI never actually figured out exactly what
was wrong in entry 2162,
but I managed to circumvent by changing the
  
  11627   Mon Sep 21 15:22:19 2015 jamieUpdateDAQworking on new fb replacementI've been putting together a new machine
that Rolf got for us as a replacement for
fb.
  
  2321   Tue Nov 24 14:33:22 2009 AlbertoUpdateABSLworking on the AP tableI'm working on the AP table. I also opened
the auxiliary NPRO shutter. The auxiliary
beam is on its path on the AP table and PSL
  
  2324   Tue Nov 24 19:16:02 2009 AlbertoUpdateABSLworking on the AP table


   
        
            
  
  12404   Fri Aug 12 14:37:34 2016 SteveUpdateSEIworking seismometers as they are2.1 mag earth quake in Norhten Ca

Our seimometers need professorial
centering. Related electronics must be checked
 eq_2.1m_Geysers_CA.pngeq2.1m_GeysersCA.pngoscillations.png 
  8529   Sat May 4 00:21:00 2013 ranaConfigurationComputersworkstation updates Koji and I went into "Update
Manager" on several of the Ubuntu workstations
and unselected the "check for updates"
  
  5574   Thu Sep 29 03:43:20 2011 kiwamuUpdateASCwrong channel assignment on IPPOSThe
channels for IPPOS had been assigned in a
wrong way.
  
  4734   Tue May 17 19:38:32 2011 kiwamuUpdateSUSwrong connection on 1X5Today Steve was working around the 1X5
rack to strain relief the cable jungles and
the
 wrong.pngcorrect.png 
  1251   Fri Jan 23 16:33:27 2009 peteUpdateoplevsx-arm oplev calibrationsITMXpit 71 microrad/ct
ITMXyaw 77 microrad/ct
ETMXpit 430 microrad/ct
  
  7718   Fri Nov 16 03:12:39 2012 Ayaka, DenUpdateGreen Lockingxarm lockedWe aligned and locked xarm for green.
 etmxf.png 
  7719   Fri Nov 16 09:57:57 2012 JenneUpdateGreen Lockingxarm locked

    

       
            
  
  9971   Mon May 19 22:44:21 2014 denUpdatePEMxend sei isolation kit is set

    

       
            
  
  7716   Thu Nov 15 21:52:48 2012 Den, AyakaUpdateGreen Lockingyarm lockedWe aligned and locked Y arm for green:

    installed camera on PSL
to monitor green transmission
    aligned
 yarm.pngetmyf.png 
  9485   Wed Dec 18 03:29:48 2013 DenUpdateLSCyarm locked on mcAs a CM slow path test I locked free swinging
yarm by actuating on MC length with bandwidth
of 200 Hz. Crossover with AO is not stable
 MC_ARM.pdf 
  9967   Sat May 17 14:48:06 2014 denUpdatePEMyend sei isolation kit is setYend seismometer isolation kit (elog
8461) hosts Guralp seismometer. I made
a cable for inside connection, assembled
 IMG_1405.JPGIMG_1406.JPG 
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework   8days.png 
  2808   Mon Apr 19 13:23:03 2010 josephbConfigurationComputersyum update fixed on control room machinesI went to Ottavia, and tried running yum
update.  It was having dependancy issues
with mjpegtools, which was a rpmforge provided
  
  1360   Thu Mar 5 02:24:19 2009 ranaConfigurationComputersyum.repos.dI added the following repos which
I found on allegra to megatron and then did
a 'yum install sshfs' on both machines:
  
  1546   Tue May 5 09:22:46 2009 carynUpdatePEMzerosFor several of the channels on the PEM
ADCU, zeros are occuring at the same time.
Does anyone know why that might happen or
 zerotest2.pngzerotest.png 
  6784   Thu Jun 7 12:49:50 2012 JamieUpdateComputerszita network configuredAdded zita to the martian host table, and
configured his network accordingly:

zita            A       192.168.113.217

  
  9368   Tue Nov 12 21:50:01 2013 ranaUpdate zita network configured 
 I installed 'nfs-client' on
zita (the StripTool terminal). It now has
  
  6774   Wed Jun 6 22:25:05 2012 JamieUpdateComputerszita now running ubuntu 10.04I'll finish the rest of the config to turn
it into a full-fledged workstation tomorrow.
  
  15016   Wed Nov 6 17:45:34 2019 gautamUpdateLSC~Here is a comparison of the response of
various DoFs in our various RFPD sensors
for two different CARM offsets. Even in the
  
ELOG V3.1.3-