  16393   Tue Oct 12 11:32:54 2021 YehonathanSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsLate submission (From Thursday 10/07):

I measured the PRMI sensing matrix
to see if the BS and PRMI output matrices
 modified_output_matrices_radar_plots.pngnormal_output_matrices_radar_plots.png 
  16394   Tue Oct 12 16:39:52 2021 ranaSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsshould compare side by side with the ITM
PRMI radar plots to see if there is a difference.
How do your new plots compare with Gautam's
  
  16395   Tue Oct 12 17:10:56 2021 AnchalSummaryCDSSome more informationChris pointed out some information displaying
scripts, that show if the DAQ network is
working or not. I thought it would be nice
  
  16396   Tue Oct 12 17:20:12 2021 AnchalSummaryCDSConnected c1sus2 to martian networkI connected c1sus2 to the martian network
by splitting the c1sim connection with a
5-way switch. I also ran another ethernet
  
  16397   Tue Oct 12 23:42:56 2021 KojiSummaryCDSConnected c1sus2 to martian networkDon't you need to add the new
hosts to /diskless/root/etc/rtsystab at fb1?
--> There looks many elogs talking about
  
  16398   Wed Oct 13 11:25:14 2021 AnchalSummaryCDSRan c1sus2 models in martian CDS. All good!Three extra steps (when adding
new models, new FE):


Chris
pointed out that the sudo command in c1sus2
 CDS_screens_running.png 
  16399   Wed Oct 13 15:36:38 2021 HangUpdateCalibrationXARM OLTFWe did a few quick XARM oltf measurements.
We excited C1:LSC-ETMX_EXC with a broadband
white noise upto 4 kHz. The timestamps for
 Screenshot_2021-10-13_15-32-16.png 
  16400   Thu Oct 14 09:28:46 2021 YehonathanUpdatePSLPMC unlockedPMC has been unlocked since ~ 2:30 AM.
Seems like the PZT got saturated. I moved
the DC output adjuster and the PMC locked
  
  16401   Thu Oct 14 11:25:49 2021 YehonathanUpdatePSLPMC unlocked{Yehonathan, Anchal}

I went to get a sandwich around
10:20 AM and when I came back BS was moving
 BS_OSEM_Sensor_PSD.pdfBS_OSEM_Sensor_PSD_AfterReconnectingCables.pdf 
  16402   Thu Oct 14 13:40:49 2021 YehonathanSummarySUSPRM and BS Angular Actuation transfer function magnitude measurementsHere is a side by side comparison of the
PRMI sensing matrix using PRM/BS actuation
(attachment 1) and ITMs actuation (attachment
 BSPRM_Actuation_Radar_plots.pngITM_Actuation_Radar_plots.png 
  16403   Thu Oct 14 16:38:26 2021 Ian MacMillanUpdateGeneralKicking optics in freeSwing measurment[Ian, Anchal]

We are going to kick the optics
tonight at 2am.
  
  16404   Thu Oct 14 18:30:23 2021 KojiSummaryVACFlange/Cable Stand ConfigurationFlange Configuration for BHD

We will need total 5 new
cable stands. So Qty.6 is the number to be
 40m_flange_layout_20211014.pdf 
  16405   Thu Oct 14 20:16:22 2021 YehonathanUpdateGeneralPRMI free swinging{Yehonathan, Raj}

We aligned the IFO in the PRMI
state and let it swing freely.
  
  16406   Fri Oct 15 12:14:27 2021 Ian MacMillanUpdateGeneralKicking optics in freeSwing measurment[Ian, Anchal]

we ran the free swinging test last
night and the results match up with in 1/10th
 20211015_Kicktest_plot.pdf 
  16407   Fri Oct 15 16:46:27 2021 AnchalSummaryOptical LeversVent PrepI centered all the optical levers on ITMX,
ITMY, ETMX, ETMY, and BS to a position where
the single arm lock on both were best aligned.
 Screen_Shot_2021-10-15_at_4.34.45_PM.pngScreen_Shot_2021-10-15_at_4.45.31_PM.pngScreen_Shot_2021-10-15_at_4.34.45_PM.pngScreen_Shot_2021-10-15_at_4.34.45_PM.png 
  16408   Fri Oct 15 17:17:51 2021 KojiSummaryGeneralVent PrepI took over the vent prep: I'm going
through the list in [ELOG
15649] and [ELOG
 7x 
  16409   Fri Oct 15 20:53:49 2021 KojiSummaryGeneralVent PrepFrom
the IFO point of view, all look good and
we are ready for venting from Mon Oct 18
  
  16410   Mon Oct 18 10:02:17 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Anchal, Koji]

- Checked the main volume is isolated.
- TP1 and TP2 were made isolated from
 Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png 
  16411   Mon Oct 18 16:48:32 2021 TegaUpdateElectronicsSat Amp modifications[S2100738, S2100745, S2100751] Completed
three more Sat Amp units modification with
seven remaining.
 IMG_20211018_162918574.jpg 
  16412   Tue Oct 19 10:59:09 2021 KojiUpdateVACVent Started / Completed[Chub, Jordan, Yehonathan, Anchal,
Koji]

North door of the BS chamber opened
  
  16413   Tue Oct 19 11:30:39 2021 KojiUpdateVACHow to vent TP1I learned that TP1 was vented through the
RGA room in the past. This can be done by
opening VM2 and a manual valve ("needle
 Screen_Shot_2021-10-18_at_14.52.34.png 
  16414   Tue Oct 19 18:20:33 2021 Ian MacMillanSummaryCDSc1sus2 DAC to ADC testI ran a DAC to ADC test on c1sus2 channels
where I hooked up the outputs on the DAC
to the input channels on the ADC. We used
 data3_Plots.pdfdata2_Plots.pdf 
  16415   Tue Oct 19 23:43:09 2021 KojiSummaryCDSc1sus2 DAC to ADC test(Because of a totally unrelated reason)
I was checking the electronics units for
the upgrade. And I realized that
 P_20211019_224433.jpgP_20211019_224122.jpgP_20211019_224400.jpgP_20211019_224411.jpg 
  16416   Wed Oct 20 11:16:21 2021 AnchalSummaryPEMParticle counter setup near BS ChamberI have placed a GT321 particle counter
on top of the MC1/MC3 chamber next to the
BS chamber. The serial cable is connected
 PXL_20211020_183728734.jpg 
  16417   Wed Oct 20 11:48:27 2021 AnchalSummaryCDSPower supple configured correctly.This was horrible! That's my bad, I
should have checked the configuration before
assuming that it is right.
  
  16418   Wed Oct 20 15:58:27 2021 KojiUpdateVACHow to vent TP1Probably the hard disk of c0rga is dead.
I'll follow up in this elog later today.

Looking at the log in /opt/rtcds/caltech/c1/scripts/RGA/logs
  
  16419   Thu Oct 21 11:38:43 2021 JordanUpdateSUSStandoffs for Side Magnet on 3" Adapter Ring SOS AssemblyI had 8 standoffs made at the Caltech chemistry
machine shop to be used as spacers for the
side magnets on the 3" Ring assembly.
 Magnet_Standoffs.jpg 
  16420   Thu Oct 21 11:41:31 2021 AnchalSummaryPEMParticle counter setup near BS ChamberThe particle count channel names were changes
yesterday to follow naming conventions used
at the sites. Following are the new names:
 ParticleCountData20211021.pdf 
  16421   Thu Oct 21 15:22:35 2021 ranaSummaryPEMParticle counter setup near BS ChamberSVG doesn't work in my browser(s).
Can we use PDF as our standard for all graphics
other than photos (PNG/JPG) ?
  
  16422   Thu Oct 21 15:24:35 2021 ranaSummaryPEMParticle counter setup near BS Chamberrethinking what I said on Wednesday - its
not a good idea
to put the particle counter on a vac chamber
  
  16423   Fri Oct 22 17:35:08 2021 Ian MacMillanSummaryPEMParticle counter setup near BS ChamberI have done some reading about where would
be the best place to put the particle counter.
The ISO standard (14644-1:2015) for
  