3733
|
Mon Oct 18 09:01:48 2010 |
steve | HowTo | General | How not to |
This BNC cable is crying for help. Please do not do this to me. It should be reported to the abused center.Throw this cable into the garbage now. |
Attachment 1: P1060926.JPG
|
|
3745
|
Wed Oct 20 16:41:41 2010 |
steve | Omnistructure | General | laser chiller leaving for MIT |
|
Attachment 1: P1060929.JPG
|
|
3751
|
Thu Oct 21 10:44:56 2010 |
steve | Metaphysics | Treasure | 1987 supernova tapes plus....? |
I'm cleaning out to make room for our new optical cabinet. Are we keeping these? There are ~20 pieces of 10" od 1" wide tapes and large number of cassettes.
AJW, Zucker, Stuart A and Koji were notified in this matter.
Alan suggested to save data of Bruce Allen paper of observation of binary neutron stars in the 40m on 1994 November 14-20 and save back up tapes of his period in the 40m.
Mike: reels are not readable any more, it is time to let go |
Attachment 1: P1060932.JPG
|
|
3792
|
Wed Oct 27 09:02:29 2010 |
steve | Update | Electronics | HP4195A is NOT fixed |
www.avalontest.com has fixed the 25MHz oscillation. Contact: Jim Burnham 760-536-0191
Actually, NOT FIXED. |
3808
|
Thu Oct 28 09:16:17 2010 |
steve | Update | PEM | welding in the vertex area |
Fire-smoke sensors in the vertex area #2-31, 2-30 east, 2-32 south/MC2 and 2-37 old control room area are turned off to accommodate the welding
activity of folding crane. These sensors will be reactivated at 3:30pm today.
Stay out of the 40m lab: IFO room till 6 pm today. |
3810
|
Thu Oct 28 13:01:34 2010 |
steve | Update | PEM | crane repair guys left for the day |
Quote: |
Fire-smoke sensors in the vertex area #2-31, 2-30 east, 2-32 south/MC2 and 2-37 old control room area are turned off to accommodate the welding
activity of folding crane. These sensors will be reactivated at 3:30pm today.
Stay out of the 40m lab: IFO room till 6 pm today.
|
The new cord wheel was to big. They be back tomorrow?
The lab is open. |
3832
|
Mon Nov 1 10:17:55 2010 |
steve | Update | General | breakers relabelled |
Pedro of the electrical shop helped to retrace wires from the racks to the breakers. Many wrong labels were replaced. These labels are still representing the south arm as Y and the east arm as X.
Racks: 1X1,2,3,4 and 1Y3,4,5,6,7 and 9 are connected through manual disconnect swithes to AC power breaker PC-1 on the west wall of IFO room 104.
This panel PC-1 is connected to T1 isolation transformer in room 101 Panel L - # 38, 40, 42
Racks: 1Y1 & 2 psl and mc are connected through manual disconnect switches to AC power breaker PC-2 just west of the psl enclosure.
This panel is connected to T2 isolation transformer in room 101 Panel L - # 32, 34, 36 |
Attachment 1: P1060970.JPG
|
|
Attachment 2: P1060972.JPG
|
|
Attachment 3: P1060975.JPG
|
|
3833
|
Mon Nov 1 10:28:41 2010 |
steve | Bureaucracy | SAFETY | Suresh received 40m safety training |
Our new postdoc Suresh Doravari received 40m specific safety training last week. |
3854
|
Wed Nov 3 16:49:31 2010 |
steve | Update | General | storage cabinet is in place |
The south end of IFO room 104 was reshuffled. The flow bench was moved all the way to the south end to create more room for the crane reach. The old large drawing cabinet was moved under the vacuum tube.
The new clear view through Acrylic-plexyglass cabinet is anchored. It has powder finished coating so it will not out-gas too much.The back side shelf mounting holes are sealed off with kapton tape. The doors still needs some gaskit seals. |
Attachment 1: P1070018.JPG
|
|
3862
|
Thu Nov 4 17:24:49 2010 |
steve | Update | General | conflat flanges for MIT |
8 pieces of 10" CF blanks were shipped to MIT |
Attachment 1: P1070020.JPG
|
|
3864
|
Thu Nov 4 17:57:27 2010 |
steve | Update | General | BeamScanner is working again |
Koji, Suresh and Steve,
The beam scanner is back from repair. Koji and Suresh helped to move the I/O address jumpers on the interface card from default position 300 to 320
It is working again. |
Attachment 1: P1070024.JPG
|
|
3867
|
Fri Nov 5 09:08:14 2010 |
steve | Update | SUS | epoxy |
Physical Electronics: Vac-Seal #288-6000 arriving Monday. Our last bag used last week had a p/n 1002003 with expiration date .....2009 ? and it was stored in the
refrigerator all times. We are getting 68 small bags.
We should have precision gluing notes of epoxies/procedures used on our sus upgrade. |
Attachment 1: 11081001.PDF
|
|
3894
|
Thu Nov 11 11:08:26 2010 |
steve | Bureaucracy | PEM | AP table found open |
Please remember to cover the optical tables ! |
4059
|
Wed Dec 15 16:04:49 2010 |
steve | Configuration | VAC | vacuum valves found in default condition |
This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration so one has to pay attention that the foreline valves are open.
Reset error message on vacuum screen and opened V4 & V5 at 3pm today. |
4077
|
Mon Dec 20 16:57:58 2010 |
steve | Update | IOO | checking out & closing the vacuum chambers |
- Check EQ-stops
- clamp down counter weights
- check other components are clamped
- remove all tools
- check cabling is not is not shorting out seismic stack or blocking beam
- confirm well centered spots on mirrors
|
4083
|
Tue Dec 21 16:20:09 2010 |
steve | Configuration | VAC | pumpdown has started |
Slow pumpdown of rebuilt IFO-mark4 started at 3pm today.
We are at 680Torr at this minute with 1.5 Torr/min speed. |
4089
|
Wed Dec 22 17:24:50 2010 |
steve | Configuration | VAC | slow pumpdown at 12 hours |
We have reached 200 Torr at 12 hours of slow pumping speed. Kiwamu stopped the pumping for 11 hrs last night .and I restarted it this morning.
Now RV1 is fully open with butterfly valve in place and the second roughing pump RP3 was just turned on.
How to stop pumping:
1, close RV1 manual valve with torque wheel
2, close V3
3, turn off roughing pumps RP1 & RP3
4, disconnect metal hose connection to butterfly valve |
Attachment 1: slowpd12h.jpg
|
|
4094
|
Thu Dec 23 13:30:09 2010 |
steve | Configuration | VAC | slow pumpdown complete |
The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr
The Maglev monitoring MEDM screen "Rotating" indicator is not working. It is on all times. Please look at Maglev controller monitor for real information.
Pump down is completed.
Configuration: vacuum normal after 86 days at atm CC1 = 1e-5 Torr
IFO is hungry for light (and maybe some goulash with a little paprikash too) |
Attachment 1: slow2dpd.jpg
|
|
4125
|
Fri Jan 7 15:17:37 2011 |
steve | Update | Cameras | ITMX video monitor has tower wide view |
The Watec 902, 1/2" CCD camera got new Tamron lens: 1/2" 10-40mm F/1.4 manual iris. IR corrective lens. It is designed to have the same focal point in the IR as
in the visible light range. However, as the depth of field in the IR range is very narrow, focus adjustment should be done carefully in the IR.
Now you can see the sus tower that will make alignment easier.
|
4133
|
Tue Jan 11 11:39:45 2011 |
steve | Update | VAC | RGA is turned on |
Joe updated the rga procedure in the wiki and we turned on the filament. It will take a few days to reach thermal equilibrium.
TP2 dry fore pump was replaced at 910mTorr |
Attachment 1: pd70d22.jpg
|
|
4165
|
Tue Jan 18 10:25:23 2011 |
steve | Update | PEM | vertex crane work this week |
The crane people are here. The Vertex chambers are covered with plastic. The PSL HEPAs will be running on high during the day.
It is going to be disturbingly noisy and dirty during the day. Please try start working in the evening if it can not wait till next week. |
4233
|
Mon Jan 31 16:12:11 2011 |
steve | Update | VAC | Vertex crane upgrade shorth coming |
The upgrade is almost finished. I found that the passive latch lock is not closing down all the way. It has about a 3/8" gap. See Atm. 1 & 2
The service man was here this morning and agreed to fix it. They will be back next week. The latch needs an other spring to push it into full lock.
We tested all possible sequences of operation of the new upgrade. It performed to specification.
Quote:
|
|
|
Attachment 1: P1070364.JPG
|
|
Attachment 2: P1070358.JPG
|
|
4264
|
Wed Feb 9 10:25:46 2011 |
steve | Update | SAFETY | AP table |
I blocked the AP table's south west 10" ID port since it is obsolete with the new layout.
Reminder: items on the enclosure self can fall down in an earthquake. I moved oscilloscope and heavy calorimeter head from the edge of the cliff. |
Attachment 1: P1070395.JPG
|
|
4269
|
Thu Feb 10 11:16:31 2011 |
steve | Update | PEM | south arm AC turned on |
The air condition was off for the south arm. I turned it on. |
4273
|
Fri Feb 11 09:27:03 2011 |
steve | Configuration | VAC | RGA scan |
The RGA scan is normal at day 52 of this pump down.
Light power BS 1064nm ~25mW, ETMX 532nm ~5mW |
Attachment 1: rgascan20110211.jpg
|
|
Attachment 2: pressurepd70.jpg
|
|
4274
|
Fri Feb 11 16:43:09 2011 |
steve | Update | VIDEO | MC1 & 3 video monitor |
I set up video monitoring of MC1 and MC3 |
Attachment 1: P1070415.JPG
|
|
4286
|
Mon Feb 14 11:23:24 2011 |
steve | Update | SAFETY | enclosure door upgrade |
The #3 enclosure door was removed for the carpenter shop this morning. They will make 5 full size doors with window on each.
TEMPORARY aluminum sheet is clamped into its place. This sheet should not be removed till new doors arrive.
The inside Formica color will be changed from white to black to reduce the green scattering. |
Attachment 1: P1070418.JPG
|
|
4290
|
Mon Feb 14 17:16:47 2011 |
steve | Update | General | racks, breakers labeled |
The south arm labels were changed from y to x to reflect reality.
So racks, manual disconnects and breakers now have their actual name. The east arm will be changed over tomorrow.
Please remove incorrect labels if you see any !
I can not find 1X4 breaker so it will be traced. |
4337
|
Tue Feb 22 11:53:38 2011 |
steve | Update | Electronics | RF Distribution box: assembly completed |
Quote: |
The mechanical assembly of RF distribution box is 99% complete. Some of the components may be bolted to the teflon base plate if needed.
All RF cables and DC voltage supply lines have been installed and tested. I removed the terminal block which was acting as a distribution box for the common zero voltage line. Instead I have used the threaded holes in the body of each voltage regulator. This allows us to keep the supply lines twisted right up to the regulator and keeps the wiring neater. The three regulator bodies have been wired together to provide a common zero potential point.
I did a preliminary test to see if everything is functioning. All units are functioning well. The output power levels may need to be adjusted by changing the attenuators.
The 2x frequency multiplier outputs are not neat sine waves. They seem to produce some harmonics, unlike the rest of the components.
I will post the measured power output at each point tomorrow. The RF power meter could not be found in the 40m lab. We suspect that it has found its way back to the PSL lab.
|
http://www.timesmicrowave.com/wireless/index.shtml
Frank is recommending these PhaseTrack-210 as phase stable low loss rf coax cables. |
4338
|
Tue Feb 22 14:37:24 2011 |
steve | Update | SAFETY | Larisa received 40m safety training |
Larisa Thorne received 40m lab specific, basic safety training. She will attend P. King's Basic Laser Safety Training Session tomorrow.
|
4349
|
Thu Feb 24 11:18:08 2011 |
steve | Update | SUS | SRM sus-cables |
Cheater cables for SRM sus tied up. They were dangling aimlessly on the floor. |
Attachment 1: P1070428.JPG
|
|
4350
|
Thu Feb 24 16:47:26 2011 |
steve | Configuration | PSL | shutter is back on the PSL output |
Uniblitz mechanical shutter was placed into the beam path of the PSL output with razor beam trap. The output power was 1.39W at 2.08A
It is working from the MEDM screen "old map" C1IOO_Mech_Shutter.adl |
Attachment 1: P1070441.JPG
|
|
4356
|
Fri Feb 25 10:11:56 2011 |
steve | Update | SAFETY | how not to |
The beam of IR for doubling is clipping on bnc cable to green beam transmitted pd. |
Attachment 1: Presentation1.jpg
|
|
4367
|
Wed Mar 2 16:51:53 2011 |
steve | Configuration | Green Locking | mech shutter in place at the south end |
I moved old POX shutter from ITMY optical table to the south end. MEDM POX mechanical shutter screen is now closing the green beam injection into the Y arm.
I kluged in a 40m long bnc cable that Alberto left on the floor for control. It is labelled POX-sht This is a temporary set up. |
4386
|
Tue Mar 8 15:23:16 2011 |
steve | Update | PEM | clean room gloves |
Ansell AccuTech 91-300 clean room gloves ONLY in the 40m lab.
Cleaning and preparation must be carried out in these gloves also. |
4391
|
Wed Mar 9 17:29:11 2011 |
steve | Summary | VAC | single O-ring protection |
We have one single O-ring on the 40m vacuum envelope. It is on the OOC west side, facing the AP table. This O-ring has to be protected from the force of this
door. There should be 3 shims ~120 degrees apart to carry the full load, so it is not the O-ring that is getting squashed.
This morning I found only one of these shims in place. |
Attachment 1: so1.jpg
|
|
Attachment 2: P1070458.JPG
|
|
4405
|
Fri Mar 11 16:30:42 2011 |
steve | Update | General | high speed servo unit is here |
New Focus Servo Controller has just arrived. We have 25 days to evaluate this product.
It will have to be shipped back to the vendor on April 4, 2011 the latest in order to get full refund. |
Attachment 1: P1070462.JPG
|
|
4418
|
Mon Mar 21 16:31:02 2011 |
steve | Update | SAFETY | Bryan Barr received safety training |
Bryan Barr is visiting us from Glasgow for a month. He received 40m specific safety training on Friday. |
4429
|
Wed Mar 23 09:48:20 2011 |
steve | Update | PSL | PSL enclosure: gets new window & laser |
Solid door, numbered 4 at south west corner of PSL enclosure was replaced by laser protective window.
The carpenter shop's Mark is making 4 more identical ones for the east side.
The Lightwave NPRO126 of 700mW was moved from the AP-table into the PSL-enclosure temporarily.
It's emergency shutdown switch can be seen at the center bottom picture |
Attachment 1: P1070471.JPG
|
|
4430
|
Wed Mar 23 09:54:46 2011 |
steve | Omnistructure | Photos | LSC visitors |
The 40m lab was visited by ~ 30 LSC members the end of last week. |
Attachment 1: P1070467.JPG
|
|
Attachment 2: P1000414.jpg
|
|
4447
|
Mon Mar 28 16:19:23 2011 |
steve | Frogs | Photos | visithing 5th graders |
Suresh is captivating his audience with gravity waves on last Friday, March 25 |
Attachment 1: P1070475.JPG
|
|
4475
|
Thu Mar 31 11:30:51 2011 |
steve | Configuration | General | strain relieved rf cables |
I strain relieved RF cables labeled 33 MHZ LO and 166 MHZ to EOM at 1X2 This is a temporary setup for the 11 MHZ
The coax N bulkheads connectors are mounted on the plastic front panel now. |
Attachment 1: P1070491.JPG
|
|
4487
|
Tue Apr 5 17:04:36 2011 |
steve | Summary | SAFETY | cranes inspected and load tested |
Mike Caton of Konecranes inspected and loadtested all 3 of the 40m cranes at max reach trolley positions with 1 ton. |
Attachment 1: P1070522.JPG
|
|
Attachment 2: P1070532.JPG
|
|
4488
|
Tue Apr 5 17:31:59 2011 |
steve | Summary | General | new laser pointers |
Quote: |
Just for a record. We got 4 new laser pointers (2 greens, 1 blue, and 1 green and red combination). Don't lose them.
They reside in a bucket on the SP table, where IR viewers and sensor cards also reside.

|
Low power green-red laser pointers are in. High power green, red and blue pointers are confiscated. |
Attachment 1: P1070530.JPG
|
|
4496
|
Thu Apr 7 11:38:56 2011 |
steve | Update | PSL | enclosure windows on the east side of the PSL |
The PSL enclosure now have 4 windows on each side. The bottom rail guides on the east side will be replaced by one U-channel for smoother, more gentle sliding.
Door position indicator- interlock switches are not wired yet. |
Attachment 1: P1070538.JPG
|
|
4497
|
Thu Apr 7 11:51:13 2011 |
steve | Summary | SAFETY | new crane operator inaugurated |
Quote: |
Mike Caton of Konecranes inspected and loadtested all 3 of the 40m cranes at max reach trolley positions with 1 ton.
|
Konecrane representative gave crane operator training in the 40m. Koji has become a qualified, trained crane operator of the 40m lab. |
Attachment 1: P1070535.JPG
|
|
4550
|
Thu Apr 21 08:26:42 2011 |
steve | Update | PEM | PSL enclosure work today |
The east side window guides will be replaced by one long U-channel. There will be drilling into 2x2 steel frame. It should be done by 2pm today
This should remove the jerking motion of windows hitting the individual guides. |
4551
|
Thu Apr 21 14:39:43 2011 |
steve | Update | RF System | new strain relieved N connectors at AP |
New right angle PVC, 2 x 2 x 1/4" installed at the AP table to strain relief the 1/4" spiral corrugated RF coaxes. |
Attachment 1: P1070562.JPG
|
|
Attachment 2: P1070564.JPG
|
|
4552
|
Thu Apr 21 15:03:29 2011 |
steve | Update | Computers | juction board finds home |
The anti aliasing box was opened up at the back to accommodate the junction board and the SCSI cable towards the ADC. Aluminum plate was attached to the bottom to hold the strain relief clamp.
Three more hanging junction cards will be replaced in this manner. |
Attachment 1: P1070570.JPG
|
|
Attachment 2: P1070568.JPG
|
|
4553
|
Thu Apr 21 15:20:46 2011 |
steve | Update | PEM | PSL enclosure work today |
Quote: |
The east side window guides will be replaced by one long U-channel. There will be drilling into 2x2 steel frame. It should be done by 2pm today
This should remove the jerking motion of windows hitting the individual guides.
|
The installation went smoothly. There will be no more banging the doors into guides on the east side.
Atm2 showing the west side as is today |
Attachment 1: P1070558.JPG
|
|
Attachment 2: P1070560.JPG
|
|