  13990   Wed Jun 20 09:16:56 2018 SteveUpdatePEMdusty lab

You should wipe off the table cover before you take it off next time.

It is important to turn up the PSL encloure HEPA Variac voltage if you are working in there. It takes less than 10 minutes to reach lab condition.

Lab air count normal. It is not logged. I have a notebook of particle count on the SP table next to the Met One counter.

Quote:

Chris replaced some air condition filters and ordered some replacement filter today.

 

 

Attachment 1: AP.JPG
AP.JPG
Attachment 2: ITMY.JPG
ITMY.JPG
Attachment 3: ITMX.JPG
ITMX.JPG
Attachment 4: SP.JPG
SP.JPG
  9591   Mon Feb 3 10:17:14 2014 SteveUpdatePEMdusty surfaces

Please wet WIPE before opening chamber or optical table ! ! 

 with methanol soaked kimwipes.

The Met One particle counter is located on CES wall, just behind ITMX chamber. 

The numbers are not so bad, but have you ( ...a)  asked the IFO lately?

Attachment 1: AP-ISCT.jpg
AP-ISCT.jpg
Attachment 2: BSC-rim.jpg
BSC-rim.jpg
Attachment 3: ITMX-ISCT.jpg
ITMX-ISCT.jpg
Attachment 4: 12daysAtm.png
12daysAtm.png
  3426   Mon Aug 16 23:13:25 2010 ZachUpdateeloge to the log

 Zach

  • I get so many freebies it's ridiculous
  3540   Tue Sep 7 23:34:15 2010 Kiwamu, SanjitConfigurationComputerse-log

e-log was repeatedly hanging and several attempts to start the daemon failed.

problem was solved after clearing the (firefox) browser cache, cookie, everything!!

 

  2446   Tue Dec 22 15:49:31 2009 kiwamuUpdateGenerale-log restarted

I found the e-log has been down around 3:40pm, then I restarted the e-log. Now it's working.

Thanks.

  1076   Thu Oct 23 18:51:19 2008 AlbertoMetaphysicsComputerseLog
I checked it and the latest version of the elog software, the 2.7.5 (we have the 2.6.5) has, among new nice features, the very good ability to fit the entries into the screen width without showing kilometric lines like we see now. Should we upgrade it?
  1   Wed Oct 17 18:46:33 2007 ranaConfigurationGeneraleLog Change
This is the first entry in the new 40m eLog.

Its GWs or bust now! Big grin



[Hnull][/Hnull]
  3384   Sat Aug 7 21:09:59 2010 DmassConfigurationComputer Scripts / ProgramseLog changes

I made some changes to the elog on nodus:

  • Made a backup of /cvs/cds/caltech/elog/elog-2.7.5/elogd.cfg called elogd.cfg.bk.20100407 in the same directory
  • Added a folder: /cvs/cds/caltech/elog/elog-2.7.5/logbooks/EAGER_Lab
  • Restarted the elog daemon via the start-elog-nodus script in the elog-2.7.5 directory

I saw that the current version of the elog seems to be in the svn, so tried to svn the changes from nodus via ssh, but got this message:

"svn: This client is too old to work with working copy '/cvs/cds/caltech/elog/elog-2.7.5'; please get a newer Subversion client."

I feel I should svn this but don't want to *&#@ the svn/elog up.

For now I will leave it alone and ask a question: Is the folder /cvs/cds/caltech/elog/elog-2.7.5/ under SVN control? Is it also under CVS control?

 

TL;DR:  New tab added to elog.

 

  416   Mon Apr 7 16:42:56 2008 ranaUpdateComputerseLog intermittent
Phil Ehrens restarted Dziban again this morning. Looks like its still crashing each Monday around 8 AM.

Here is the latest suspect:

http://open.itworld.com/5040/reboot-unix-nlsunix-071225/page_1.html
  491   Thu May 22 11:21:45 2008 steveBureaucracySAFETYearly surf sudent
Caltech under grad Eric Mintun received the 40m safety training.
Now he has to read and sign SOP of laser and ifo.
He'll be working with GigE cameras with Joe
  11610   Thu Sep 17 08:36:14 2015 SteveUpdatePEMearth quake

No damage. The BS sensor UR 0.220 V has been low for some times.

Dataviewer does not work for long term trend.

Attachment 1: Chilian_eq_8.3M.png
Chilian_eq_8.3M.png
Attachment 2: BS_UR_0.220V.png
BS_UR_0.220V.png
Attachment 3: LowSensingV_BS-UR.png
LowSensingV_BS-UR.png
  14176   Wed Aug 22 08:44:09 2018 SteveUpdateGeneralearth quake

6.2M Bandon, OR did not trip any sus

 

Attachment 1: yesterday_EQs.png
yesterday_EQs.png
  14321   Tue Nov 27 10:50:20 2018 SteveUpdatePEMearth quake Mexico

Nothing tripped.

 

Attachment 1: 5.5M.Mexico.png
5.5M.Mexico.png
  33   Tue Oct 30 20:15:24 2007 tobinOtherEnvironmentearthquake
Rana, Tobin

Largish (M5.6) earthquake in San Francisco sent our optics swinging.
  1539   Fri May 1 18:51:34 2009 AlbertoSummaryEnvironmentearthquake

Earthquake 4.4 Leo Carrillo Beach.

Some of the watchdogs tripped out.

  2046   Fri Oct 2 18:26:32 2009 robAoGEnvironmentearthquake

quake coming through.  I've re-enabled optic damping (except ETMY), and left off the oplevs for now.  We can do a resonant-f  check over the weekend.

Looks like it was a magnitude 5 near Olancha, where they sell really good fresh jerky.  quake

Earthquake Details

Magnitude 5.2
Date-Time
  • Saturday, October 03, 2009 at 01:15:59 UTC
  • Friday, October 02, 2009 at 06:15:59 PM at epicenter
Location 36.393°N, 117.877°W
Depth 0 km (~0 mile) (poorly constrained)
Region CENTRAL CALIFORNIA
Distances
  • 11 km (7 miles) S (182°) from Keeler, CA
  • 16 km (10 miles) ENE (59°) from Cartago, CA
  • 18 km (11 miles) NE (37°) from Olancha, CA
  • 28 km (17 miles) SE (141°) from Lone Pine, CA
  • 239 km (148 miles) W (276°) from Las Vegas, NV
Location Uncertainty horizontal +/- 0.6 km (0.4 miles); depth +/- 2.2 km (1.4 miles)
Parameters Nph=030, Dmin=19 km, Rmss=0.28 sec, Gp= 79°,
M-type=local magnitude (ML), Version=C
Source
Event ID ci14519780
  • This event has been reviewed by a seismologist.

latest news: there's actually been about a dozen earthquakes in Keeler in the last couple hours:   http://earthquake.usgs.gov/eqcenter/recenteqsus/Maps/special/California_Nevada_eqs.php

California_Nevada.gif-Rana

  6558   Tue Apr 24 09:58:37 2012 steveUpdatePEMearthquake 3.9 magnitude

Local eq shakes the lab

Attachment 1: eq3.9.png
eq3.9.png
  797   Tue Aug 5 10:23:00 2008 steveUpdateSUSearthquake and venting effects
atm 1, EQ
atm 2, vent 7 days later: venting kicks optic into place to be free,
PRM: LR magnet gets pushed in and it is stocked, side in free
Attachment 1: eq4h.jpg
eq4h.jpg
Attachment 2: vent4hr.jpg
vent4hr.jpg
  2765   Mon Apr 5 08:43:48 2010 steveUpdatePEMearthquake mag 7.2

Large earthquake shakes Baja California, Mexico and 6 over Magnitude 5 aftershakes follow.  The frontend computers are still down since Friday.

Attachment 1: eq7.2.jpg
eq7.2.jpg
  462   Thu May 1 08:31:51 2008 steveUpdateSUSearthquake trips etmy & mc1
Earthquake at Lake Isabel magnitude 4.4 at 1am today shakes the 40m
ETMY and MC1 watchdogs tripped.
Sus damping restored.
  7281   Mon Aug 27 08:34:18 2012 SteveUpdatePEMearthquakes

Shasky day yesterday postpones venting. We had about 11 shakes larger than mag 4.0 Mag5.5 was the largest at  13:58 Sunday, Aug 26 at  the Salton Sea area.

Atm3,  ITMX and ETMX  did not come back to it's position

Attachment 1: eq5.5Msaltonsea.png
eq5.5Msaltonsea.png
Attachment 2: M5.5inaction.png
M5.5inaction.png
Attachment 3: EQeffect.png
EQeffect.png
  13309   Mon Sep 11 16:46:09 2017 SteveUpdatePEMearthquakes
Quote:

I was trying to get a lossmap measurement over the weekend but had some trouble first with the IMC and then with the PMC.

For the IMC: It was a bit too misaligned to catch and maintain lock, but I had a hard time improving the alignment by hand. Fortunately, turning on the WFS quickly once it was locked restored the transmission to nominal levels and made it maintain the lock for longer, but only for several minutes, not enough for a lossmap scan (can take up to an hour). Using the WFS information I manually realigned the IMC, which made locking easier but wouldn't help with staying locked.

For the PMC: The PZT feedback signal had railed and the PMC had been unlocked for 8+ hours. The PMC medm screen controls were generally responsive (I could see the modes on the CCDs changing) but I just couldn't get it locked. c1psl was responding to ping but refusing telnet so I keyed the crate, followed by a burt restore and finally it worked.

After the PMC came back the IMC has already maintained lock for more than an hour, so I'm now running the first lossmap measurements.

Southern Mexio is still shaking..... so as we

Attachment 1: M5.4eq.png
M5.4eq.png
  13322   Tue Sep 19 14:00:41 2017 SteveUpdatePEMearthquakes

No sus tripped. Seimometers do not see the 5.3M  ?

Quote:

Southern Mexio is still shaking..... so as we

 

Attachment 1: 7.1MX5.3J.png
7.1MX5.3J.png
  13402   Fri Oct 27 09:34:20 2017 SteveUpdatePEMearthquakes

Lompoc 4.3M and 3.7M Avalon

 

Attachment 1: recentEQs.png
recentEQs.png
  13581   Thu Jan 25 08:27:25 2018 SteveUpdatePEMearthquakes

M4 local earthquake at 10:10 UTC    There is no sign of damage.

....here is an other one.........M5.8 Ferndale, CA at 16:40 UTC

 

Attachment 1: M4_local_eq.png
M4_local_eq.png
Attachment 2: M4.png
M4.png
Attachment 3: M5.8Ferndale_CA.png
M5.8Ferndale_CA.png
  5566   Wed Sep 28 15:33:58 2011 SureshUpdateComputer Scripts / Programsediting database files for medm screens and restarting the slow c1psl machine

I changed the names on a switch(SW1) in the C1:PSL-FSS screen.  To do this I had to edit the psl.db database file in the directory /cvs/cds/caltech/target/c1psl.  After this change, when I executed this screen, all fields in the C1PSL_FSS screen went blank.  As the change to database file takes effect only after we restart the C1PSL machine (slow machine) I went ahead and reset the c1psl machine.  I then used the burttoday to locate the most recent snapshot files and then used burtgooey to restore all the values in the c1psl.snap file.

Everything back to normal now.

 

  3959   Sat Nov 20 01:58:56 2010 yutaHowToCDSeditting RT models and MEDM screens

(Suresh, Yuta)

If you come up with a good idea and want to add new things to current RT model;

 1. Go to simLink directory and open matlab;
    cd /cvs/cds/rtcds/caltech/c1/core/advLigoRTS/src/epics/simLink
    matlab


 2. In matlab command line, type;
    addpath lib

 3. Open a model you want to edit.
    open modelname

 4. Edit! CDS_PARTS has useful CDS parts.
    open CDS_PARTS
    There are some traps. For example, you cannot put cdsOsc in a subsystem

 5. Compile your new model. See my elog #3787.
 
 6. If you want to burt restore things;
    cd /cvs/cds/caltech/burt/autoburt/snapshots/YEAR/MONTH/DATE/TIME/
    burtgooey


 7. Edit MEDM screens
    cd /cvs/cds/rtcds/caltech/c1/medm
    medm


 8. Useful wiki page on making a new suspension MEDM screens;
    http://lhocds.ligo-wa.caltech.edu:8000/40m/How_to_make_new_suspension_medm_screens

  3708   Wed Oct 13 18:01:43 2010 yutaHowToCDSeditting all the similar medm screens

(Joe, Yuta)

Say, you want to edit all the similar medm screens named C1SUS_NAME_XXX.adl.

1. Go to /opt/rtcds/caltech/c1/medm/master and edit C1SUS_DEFAULTNAME_XXX.adl as you like.

2. Run generate_master_screens.py.

That's it!!

  2980   Tue May 25 09:12:46 2010 kiwamuConfigurationGreen Lockingeffect from air conditioner

We should completely turn off the air conditioner when working on green locking.

Even if green beams propagates inside of chambers, the air conditioner does affect the spatial jitter of the beam. 

The attached picture was taken when Steve and I were seeing how the green beam jittered. 

At that time the beam was injected from the end table and going through inside of the ETM, the ITM and the BS camber.

Eventually it came out from the camber and hit the wall outside of the chamber. It was obvious, we could see the jittering when the air cond. was ON.

Attachment 1: green_spot.png
green_spot.png
  1533   Wed Apr 29 15:56:43 2009 robUpdateLockingeffect of SRCL detune on ARM powers in a CARM sweep

With no DARM offset, sweeping CARM shows an asymmetry between the state where we lock to a DARM spring and the state with a DARM anti-spring.  This is why we have a link between the DARM and CARM optical springs. 

For each DARM detune direction (positive or negative, spring or anti-spring), there is only one CARM direction which can yield a DC-based error signal lock with a CARM offset but no DARM offset, which is what we want.

Attachment 1: CARMsweep_DARMspringnospring.png
CARMsweep_DARMspringnospring.png
  3023   Tue Jun 1 06:30:38 2010 KojiConfiguration40m Upgradingeffect of the arm length

I checked the effect of the arm length to the reflectance of the f2(=5*f1) sidebands.

Conclusion: If we choose L_arm = 38.4 [m], it looks sufficiently being away from the resonance
We may want to incorporate small change of the recycling cavity lengths so that we can compensate the phase deviation from -180deg.


f1 of 11.065399MHz is assumed. The carrier is assumed to be locked at the resonance.

Attachment 1: (Left) Amplitude reflectance of the arm cavity at f2 a a function of L_arm. (Right) Phase
Horizontal axis: Arm length in meter, Vertical Magnitude and Phase of the reflectance

At L=37.93 [m], f2 sidebands become resonant to the arm cavity. Otherwise, the beam will not be resonant.

Attachment 2: close-up at around 5 f1 frequency.
The phase deviation from the true anti resonance is ~0.7deg. This can be compensated by both PRC and SRC lengths.

Attachment 1: arm_cavity1.png
arm_cavity1.png
Attachment 2: arm_cavity2.png
arm_cavity2.png
Attachment 3: arm_cavity.nb.zip
  1962   Tue Sep 1 11:23:36 2009 steveUpdateGeneralelectrical ground

I was told yesterday, that on Friday the construction people accidentally ripped out one of the 40m soil ground.....AND HOW MANY MORE ARE THERE? nobody knows.

It was ~8 ft long and 0.5" diameter buried in the ground. There is no drawing found to identify this exact building ground. They promised to replace this on Wednesday with a 10 ft long and 0.75" diameter.

The  the wall will be resealed where the conduit enters  the  north west corner of the IFO room 104

 

There should be no concern about safety because the 40m building main ground is connected to the CES Mezzanine step-down transformer.

Attachment 1: ground.JPG
ground.JPG
  1965   Thu Sep 3 11:20:26 2009 steveUpdateGeneralelectrical ground in place

Quote:

I was told yesterday, that on Friday the construction people accidentally ripped out one of the 40m soil ground.....AND HOW MANY MORE ARE THERE? nobody knows.

It was ~8 ft long and 0.5" diameter buried in the ground. There is no drawing found to identify this exact building ground. They promised to replace this on Wednesday with a 10 ft long and 0.75" diameter.

The  the wall will be resealed where the conduit enters  the  north west corner of the IFO room 104

 

There should be no concern about safety because the 40m building main ground is connected to the CES Mezzanine step-down transformer.

 Atm1 is showing ground bus under N-breaker panel in 40m IFO room north-west corner.

The second ground bus is visible farther down south under M-breaker panel.

Atm2 is the new ground that will be connected to ground bus-N

Attachment 1: Gs-n.JPG
Gs-n.JPG
Attachment 2: newground.JPG
newground.JPG
  2200   Fri Nov 6 19:29:24 2009 JenneUpdateelogelog acting up

elog was acting up again (not running), so I restarted it. 

  2201   Fri Nov 6 20:10:15 2009 JenneUpdateelogelog acting up

Quote:

elog was acting up again (not running), so I restarted it. 

 

And again.  This makes 4 times since lunchtime yesterday....something bad is up.

  1562   Fri May 8 04:31:35 2009 ranaUpdateComputer Scripts / Programselog and NDS
In the middle of searching through the elog, its stopped responding. So I followed the Wiki instructions
and restarted it (BTW, don't use the start-elog-nodus script that's in that directory). Seems OK now,
but I am suspicious of how it sometimes does the PDF preview correctly and sometimes not. I found a
'gs' process on there running and taking up > 85% of the CPU.

I also got an email from Chris Wipf at MIT to try out this trick from LASTI to maybe fix the
problems I've been having with the DMF processes failing after a couple hours. I had compiled but
not tested the stuff a couple weeks ago.

Today after it failed, I tried running other stuff in matlab and got some "too many files open" error messages.
So I have now copied the 32-bit linux NDS mex files into the mDV/nds_mexs/ directory. Restarted the
seisBLRMS.m about an hour ago.
  1567   Fri May 8 16:29:53 2009 ranaUpdateComputer Scripts / Programselog and NDS
Looks like the new NDS client worked. Attached is 12 hours of BLRMS.
Attachment 1: Untitled.png
Untitled.png
  10819   Fri Dec 19 16:39:25 2014 ericqUpdateComputer Scripts / Programselog autostart

I've set up nodus to start the ELOG on boot, through /etc/init/elog.conf. Also, thanks to this, we don't need to use the start-elog.csh script any more. We can now just do:

controls@nodus:~  $ sudo initctl restart elog

I also tweaked some of the ELOG settings, so that image thumbnails are produced at higher resolution and quality. 

  5304   Thu Aug 25 17:40:07 2011 DmassUpdateComputer Scripts / Programselog broke, fixed

elog died b/c someone somewhere did something which may or may not have been innocuous. I ran the script in /cvs/cds/caltech/elog to restart the elog (thrice).

 

I have now banned Warren from clicking on the elog from home

  5340   Mon Sep 5 21:12:05 2011 DmassUpdateComputer Scripts / Programselog broke, fixed

Restarted elog 9:11PM 9/5/11

  3749   Thu Oct 21 01:11:48 2010 ranaSummaryComputerselog change and rossa tex

I deleted a bunch of categories from the elogd.cfg file. Not every kind of locking and activity gets its own activity. All of the things related to length sensing and control should be LSC. If there's a high pollen count its under PEM. etc., etc., etc.

I decided that the 'tetex' distribution which comes with CentOS is total BS and I removed it from rossa using 'yum erase tetex'. I installed TexLive using the instructions on the web; its much better, actually works, and also has RevTex 4.1 which allows Jenne and I to write our paper.

Eventually, we'll standardize our workstation setups.

Yuta has also successfully set up zita to run the projector, so we should clear our some of the boxes and bookshelves in that area so that the projection can be larger.

  3753   Thu Oct 21 13:05:19 2010 KojiSummaryComputerselog change and rossa tex

This is cool though the projector is flashing the blue screen alternately.

I gave the dual head video card (ATI RADEON something) to Yuta a month ago.
It is on the top of Zita. This would make the things more fun.

Quote:

Yuta has also successfully set up zita to run the projector, so we should clear our some of the boxes and bookshelves in that area so that the projection can be larger.

 

  3436   Wed Aug 18 19:14:59 2010 JenneUpdateelogelog dead again

The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions instead, with success.

  3439   Thu Aug 19 01:49:14 2010 JenneUpdateelogelog dead again

Quote:

The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions instead, with success.

 Just for added interest, I tried a different method when the restart script broke.  The "start-elog-nodus" script has a line "kill elogd".  This seems not to be actually killing anything anymore, which means the elog can't restart.  So this time I went for "kill <pid number>", and then ran the startup script.  This worked.  So it's the "kill elogd" which isn't working reliably.

  3440   Thu Aug 19 09:51:43 2010 josephbUpdateelogelog dead again

I found the elog dead again this morning, and the script didn't kill again. I modified the script to use the following line instead of "pkill elogd":

kill `ps -ef | grep elogd | grep -v grep | grep -v start-elog-nodus | awk '{print $2}'`

Hopefully the script will be a bit more robust in the future.

Quote:

Quote:

The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions instead, with success.

 Just for added interest, I tried a different method when the restart script broke.  The "start-elog-nodus" script has a line "kill elogd".  This seems not to be actually killing anything anymore, which means the elog can't restart.  So this time I went for "kill <pid number>", and then ran the startup script.  This worked.  So it's the "kill elogd" which isn't working reliably.

 

  5232   Sun Aug 14 19:06:50 2011 JenneUpdateelogelog dead. Brought back to life

like the subject says...

  2979   Tue May 25 07:58:23 2010 kiwamuUpdateelogelog down

I found the elog got down around 7:30 am in this morning.

So I restarted it by running the script: "start-elog-nodus" as instructed on the wiki.

http://lhocds.ligo-wa.caltech.edu:8000/40m/How_To/Restart_the_elog

  3433   Wed Aug 18 12:02:29 2010 AlastairConfigurationComputerselog had crashed again...

...I restarted it.

  2702   Tue Mar 23 15:38:26 2010 AlbertoUpdateelogelog just restarted

I found the elog down and I restarted it.

Then, after few seconds it was down again. Maybe someone else was messing with it. I restarted an other 5 times and eventually it came back up.

  1947   Tue Aug 25 23:16:09 2009 Alberto, ranaConfigurationComputerselog moved in to the cvs path

In nodus, I moved the elog from /export to /cvs/cds/caltech. So now it is in the cvs path instead of a local directory on nodus.

For a while, I'll leave a copy of the old directory containing the logbook subdirectory where it was. If everything works fine, I'll delete that.

I also updated the reboot instructions in the wiki. some of it also is now in the SVN.