  3312   Wed Jul 28 16:42:21 2010 steveUpdateGeneralCrane gear box cheched

Quote:

Quote:

The guy from KroneCrane (sp?) came today and started the crane inspection on the X End Crane. There were issues with our crane so he's going to resume on Monday. We turned off the MOPA fur the duration of the inspection.

  1. None of our cranes have oil in the gearbox and it seems that they never did since they have never been maintained. Sloppy installation job. The crane oiling guy is going to come in on Monday.
  2. They tried to test the X-End crane with 2500 lbs. (its a 1 ton crane). This tripped the thermal overload on the crane as intended with this test. Unfortunately, the thermal overload switch disabled the 'goes down' circuit instead of the 'goes up' circuit as it should. We double checked the wiring diagram to confirm our hypothesis. Seems the X-End crane was wired up incorrectly in the first place 16 years ago. We'll have to get this fixed.

The plan is that they will bring enough weight to test it at slightly over the rating (1 Ton + 10 %) and we'll retry the certification after the oiling on Monday.

 The south end crane has one more flaw. The wall cantilever is imbalanced: meaning it wants to rotate south ward, because its axis is off.

This effects the rope winding on the drum as it is shown on Atm2

Atm1 is showing Jay Swar of KoneCrane and the two 1250 lbs load that was used for the test. Overloading the crane at 125% is general practice at load testing.

It was good to see that the load brakes were working well at 2500 lbs. Finally we found a good service company! and thanks for Rana and Alberto

for coming in on Saturday.

 Jeff Stinson, technician of KoneCrane inspected the south end crane hoist gear box. This was the one that was really low on oil. The full condition require

~ 950cc of EPX-7 (50-70W) high viscosity gear oil. The remaining 120 cc oil was drained and the gear box cover was removed. See Atm 1

He found the gear box, load brake and gearing in good condition. The slow periodic sound of the drive was explained by the split bearings at Atm 3

The Vertex and the east end crane gear boxes needed only 60 cc oil to be added to each Atm 4 and their drives were tested.

Conclusion: all 3 gear boxes and drives are in good working condition.

Tomorrow's plan: load test at 1 ton and correct-check  3 phase wiring.

Attachment 1: P1060503.JPG
P1060503.JPG
Attachment 2: P1060511.JPG
P1060511.JPG
Attachment 3: P1060515.JPG
P1060515.JPG
Attachment 4: P1060517.JPG
P1060517.JPG
  3318   Thu Jul 29 12:31:09 2010 KojiSummaryGeneralLab Schedule

July
29 Thu BS chamber work: Move cable towers / green steering mirrors / (2 TTs with TT charactrization) / Put the heavy door by 5PM.
30 Fri Pumping down
31 Sat WFS work by Nancy

Aug
1 Sun - 5 Thu WFS work by Nancy
5 Thu PSL Table prep
6 Fri PSL Table prep / Likely to shut down the PSL

9 Mon PSL Table prep / shutting down of the PSL (optional)
10 Tue PSL box Frame lifting
12 Thu PSL table tapping

16 Mon - 17 Tue concrete pouring preparation
19 Thu - 23 Fri Tripod placement
24 Tue - 26 Thu concrete pouring

Attachment 1: PSL_work_schedule.pdf
PSL_work_schedule.pdf
  3333   Fri Jul 30 14:53:09 2010 steveUpdateGeneralPSL table leg upgrade

Quote:

July
29 Thu BS chamber work: Move cable towers / green steering mirrors / (2 TTs with TT charactrization) / Put the heavy door by 5PM.
30 Fri Pumping down
31 Sat WFS work by Nancy

Aug
1 Sun - 5 Thu WFS work by Nancy
5 Thu PSL Table prep
6 Fri PSL Table prep / Likely to shut down the PSL

9 Mon PSL Table prep / shutting down of the PSL (optional)
10 Tue PSL box Frame lifting
12 Thu PSL table tapping

16 Mon - 17 Tue concrete pouring preparation
19 Thu - 23 Fri Tripod placement
24 Tue - 26 Thu concrete pouring

The PSL table height will be raised to the level of the AP table. This will be done using 6 TMC's Rigid Damped Tripod legs. Their planed positions shown below.

The legs will be grouted to the floor with concrete.

 http://www.techmfg.com/products/floorplatforms/rigiddampedtripod.htm

Attachment 1: psllegs.PDF
psllegs.PDF
  3335   Fri Jul 30 17:52:12 2010 KojiConfigurationGeneralJacket

Jenne and I need our jackets. We removed them from the Rb clock.
Thanks for making them warm.
Probably a Scotland sweater would fit.

  3337   Fri Jul 30 19:20:15 2010 AlastairConfigurationGeneralJacket

Quote:

Jenne and I need our jackets. We removed them from the Rb clock.
Thanks for making them warm.
Probably a Scotland sweater would fit.

 Thanks for the loan guys.  I do have a lot of warm weather clothing at home that is not so necessary in the California climate.  I will find some suitable attire for the Rb clocks there.

  3348   Mon Aug 2 17:12:28 2010 KojiUpdateGeneralLab schedule for the week of Aug. 2

Aug

2 Mon - 5 Thu WFS work (Nancy)

2 Mon - 4 Wed

Jenne: Seismometer fix / Seismic measurements on the PSL table
TT characterization (with Koji)
Preparations ETM suspensions (optional: may be in later weeks)

Kiwamu: CDS test for SUS (may be involving Koji)

Alberto: RF system prep.

All: For 5th and 6th: PSL cabling works Koji

5 Thu PSL Table prep
6 Fri PSL Table prep / Likely to shut down the PSL

9 Mon PSL Table prep / shutting down of the PSL (optional)
10 Tue PSL box Frame lifting
12 Thu PSL table tapping

16 Mon - 17 Tue concrete pouring preparation
19 Thu - 23 Fri Tripod placement
24 Tue - 26 Thu concrete pouring

Attachment 1: PSL_work_schedule.pdf
PSL_work_schedule.pdf
  3368   Thu Aug 5 16:18:37 2010 AlastairUpdateGeneralclocks still not locked fully - hut removed

The rubidium clocks are still not quite locked together, though it is clear that the beat frequency has dropped a lot since yesterday.

I checked on the clocks and the 1pps sync light is on.  The clocks are really hot again though despite the gap left at the bottom of the igloo.  The side of the clocks were hot enough to not be touchable.

I made the executive decision that I would remove the hut just now.  We can let the clocks lock together and then put the hut back on just before measuring.  This way the hut will isolate from temperature fluctuations during the measurement but it won't be running at the hotter equilibrium temperature.  I hope that the temperature won't change too much during the measurement if we put the hut back on.

RA: Attachment deleted because it was in Postscript format. Also not allowed here are the Stone Tablet and Cave Painting formats.

  3377   Fri Aug 6 16:20:08 2010 ranaUpdateGeneralclocks still not locked fully - phase shifted

 I tried to get the clocks to be closer to 90 deg for the relative phase by adding some cable length to one of the lines, but they are still wandering too much. We need to use the serial interface and up the gain in their 1PPS locking loops.

Attachment 1: Untitled.pdf
Untitled.pdf
  3378   Fri Aug 6 17:47:36 2010 steveSummaryGeneralcranes load tested at 1998 lbs

Quote:

Quote:

Quote:

The guy from KroneCrane (sp?) came today and started the crane inspection on the X End Crane. There were issues with our crane so he's going to resume on Monday. We turned off the MOPA fur the duration of the inspection.

  1. None of our cranes have oil in the gearbox and it seems that they never did since they have never been maintained. Sloppy installation job. The crane oiling guy is going to come in on Monday.
  2. They tried to test the X-End crane with 2500 lbs. (its a 1 ton crane). This tripped the thermal overload on the crane as intended with this test. Unfortunately, the thermal overload switch disabled the 'goes down' circuit instead of the 'goes up' circuit as it should. We double checked the wiring diagram to confirm our hypothesis. Seems the X-End crane was wired up incorrectly in the first place 16 years ago. We'll have to get this fixed.

The plan is that they will bring enough weight to test it at slightly over the rating (1 Ton + 10 %) and we'll retry the certification after the oiling on Monday.

 The south end crane has one more flaw. The wall cantilever is imbalanced: meaning it wants to rotate south ward, because its axis is off.

This effects the rope winding on the drum as it is shown on Atm2

Atm1 is showing Jay Swar of KoneCrane and the two 1250 lbs load that was used for the test. Overloading the crane at 125% is general practice at load testing.

It was good to see that the load brakes were working well at 2500 lbs. Finally we found a good service company! and thanks for Rana and Alberto

for coming in on Saturday.

 Jeff Stinson, technician of KoneCrane inspected the south end crane hoist gear box. This was the one that was really low on oil. The full condition require

~ 950cc of EPX-7 (50-70W) high viscosity gear oil. The remaining 120 cc oil was drained and the gear box cover was removed. See Atm 1

He found the gear box, load brake and gearing in good condition. The slow periodic sound of the drive was explained by the split bearings at Atm 3

The Vertex and the east end crane gear boxes needed only 60 cc oil to be added to each Atm 4 and their drives were tested.

Conclusion: all 3 gear boxes and drives are in good working condition.

Tomorrow's plan: load test at 1 ton and correct-check  3 phase wiring.

 Atm1, service report: load test were performed at max horizontal reach with 1998 lbs ( American Ton is 2000 lbs)

          Vertical drives and brakes worked well. The 5 minutes sagging test showed less than 1 mm movement .

          The wiring is correct. Earlier hypothesis regarding the wiring ignored the mechanical brake action.

Our cranes are certified now. Operator training and SOP is in the work.

Vertex Folding I -beam will get latch-lock and the south end I-beam will be leveled.

Atm2, south end

Atm3, east end

Atm4, folding crane at ITMX at 14 ft horizontal reach

Attachment 1: 0.9ton.PDF
0.9ton.PDF
Attachment 2: P1060523.JPG
P1060523.JPG
Attachment 3: P1060532.JPG
P1060532.JPG
Attachment 4: P1060541.JPG
P1060541.JPG
  3394   Tue Aug 10 17:21:48 2010 steveUpdateGeneralPSL optical table is at 30" height

Mike Gerfen, Koji and Steve,

 

Our old ( 6 x 10 x 1 ) ft Newport optical table will have the same height as the neighboring AP table when this job is finished.

Today's work was to elevate the optical table ~ 2400 lbs to 30" clearance to create a workable space below.

 

Atm1,  enclosure frame was raised by 6"

Atm2,  2 pellet jacks and 4x4 technology in the work.

Atm3,  ready for drill and tap with jig plate in place, note 4 Al legs 8" OD. 1/4" wall safely supporting the load

Atm4,  showing clamps that holding 1/2" plywood with jigs

Atm5, We removed the 4 old legs: 6" OD steel, 1/4" wall and 10" high after they were unloaded.

Attachment 1: P1060586.JPG
P1060586.JPG
Attachment 2: P1060583.JPG
P1060583.JPG
Attachment 3: P1060591.JPG
P1060591.JPG
Attachment 4: P1060593.JPG
P1060593.JPG
Attachment 5: P1060597.JPG
P1060597.JPG
  3452   Fri Aug 20 20:36:05 2010 AlastairUpdateGeneralElog

 Elog was down, I restarted it.

  3461   Tue Aug 24 06:34:01 2010 AlastairUpdateGeneralElog...

...was down.  Have restarted it.

  3475   Fri Aug 27 07:21:13 2010 AlastairUpdateGeneralelog...

 was down.  I restarted the version in the 2.7.5 folder.  It went down again almost immediately but stayed up after the second restart.

  3567   Mon Sep 13 12:09:42 2010 kiwamuSummaryGeneralelog restarted

 Elog didn't respond, so I restarted it with the script.

Before killing the process somehow two elog daemons were running at the same time. I killed those two manually. 

  3605   Fri Sep 24 16:31:35 2010 steveConfigurationGeneralopen frame- rack is moved

The squeezing open frame rack was moved from the south side of the PSL enclosure to the north side of the SP table.

AC power breaker is PC-2  #1

 

Attachment 1: P1060881.JPG
P1060881.JPG
  3616   Tue Sep 28 14:12:14 2010 steveUpdateGeneralvertex crane drive is out of order

The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.

I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.

The crane is tagged out again and the controller box is cooling down.

  3621   Wed Sep 29 15:34:46 2010 kiwamuUpdateGeneralfixing vertex crane
From Vertex crane -- fixing


Quote:

The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.

I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.

The crane is tagged out again and the controller box is cooling down.

 

  3624   Thu Sep 30 09:34:58 2010 steveUpdateGeneralvertex crane trolly drive fixed

Quote:

The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.

I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.

The crane is tagged out again and the controller box is cooling down.

 Atm1, Vertex crane controller unit on horizontal I-beam.

            Module CCES-407 1HP 2.3A 460V/3 phase on the right was replaced. Speed was increased  to 30 Hz

Atm2, See burned insulation on black wire that was shorting to the large suppressor resistor on Atm3 One can see the pit marks on the right end of it.

        This large power dissipater resistor got hot as the malfunctioning controller 407 broke down.   Touching black power wire insulation melted and made a short.

          So the heat was created and finally the fuses were blown. The unnecessary large fuses were replaced by small ones.

Fortunately we had one spare controller on hand that made this repair to be done fast.

We used the new Crane Safety Check list  from LIGO-E1000379-v1 the first time yesterday before doors were removed.

Attachment 1: P1060891.JPG
P1060891.JPG
Attachment 2: P1060887.JPG
P1060887.JPG
Attachment 3: P1060889.JPG
P1060889.JPG
Attachment 4: P1060893.JPG
P1060893.JPG
  3733   Mon Oct 18 09:01:48 2010 steveHowToGeneralHow not to

This BNC cable is crying for help. Please do not do this to me.  It should be reported  to the  abused center.Throw this cable into the garbage now.

Attachment 1: P1060926.JPG
P1060926.JPG
  3745   Wed Oct 20 16:41:41 2010 steveOmnistructureGeneral laser chiller leaving for MIT
Attachment 1: P1060929.JPG
P1060929.JPG
  3832   Mon Nov 1 10:17:55 2010 steveUpdateGeneralbreakers relabelled

Pedro of the electrical shop helped to retrace wires from the racks to the breakers. Many wrong labels were replaced. These labels are  still representing                          the south arm as Y and  the east arm as X.

Racks: 1X1,2,3,4 and 1Y3,4,5,6,7 and 9 are connected through manual disconnect swithes to  AC power breaker PC-1 on the west wall of IFO room 104.

             This panel PC-1 is connected to T1 isolation transformer in room 101 Panel L - # 38, 40, 42

Racks: 1Y1 & 2  psl and mc are connected through manual disconnect switches to AC power breaker PC-2 just west of the psl enclosure.

             This panel is connected to T2 isolation transformer in room 101 Panel L - # 32, 34, 36

Attachment 1: P1060970.JPG
P1060970.JPG
Attachment 2: P1060972.JPG
P1060972.JPG
Attachment 3: P1060975.JPG
P1060975.JPG
  3854   Wed Nov 3 16:49:31 2010 steveUpdateGeneralstorage cabinet is in place

The south end of IFO room 104 was reshuffled. The flow bench was moved all the way to the south end to create more room for the crane reach. The old  large drawing cabinet  was moved under the vacuum tube.

The new clear view through  Acrylic-plexyglass cabinet is anchored. It has powder finished coating so it will not out-gas too much.The back side shelf mounting holes are sealed off with kapton tape. The doors still needs some gaskit seals.

Attachment 1: P1070018.JPG
P1070018.JPG
  3862   Thu Nov 4 17:24:49 2010 steveUpdateGeneralconflat flanges for MIT

8 pieces of 10" CF blanks were shipped to MIT

Attachment 1: P1070020.JPG
P1070020.JPG
  3864   Thu Nov 4 17:57:27 2010 steveUpdateGeneralBeamScanner is working again

Koji, Suresh and Steve,

The beam scanner is back from repair.  Koji and Suresh helped to move the I/O address jumpers on the interface card from default position  300 to 320

It is working again.

Attachment 1: P1070024.JPG
P1070024.JPG
  3914   Sun Nov 14 02:59:31 2010 ranaConfigurationGeneralMEDM snapshots web page

Since Nodus is a Solaris machine it can barely handle doing the ImageMagick commands (such as convert and import). I removed the auto MEDM snapshot routine from it

awhile ago and I think the rate of ELOGD crashes has decreased, although its not definitive.

The snapshots have now been re-actived to run on MAFALDA, after I fixed the absolute pathnames in the scripts and installed (via yum) the packages that mafalda

needed to run this (Xvfb, openmotif, compat, etc.). The snapshots web page is now refreshing by itself and the statScreen/cronjob.sh is running on mafalda 5x per hour.

https://nodus.ligo.caltech.edu:30889/medm/screenshot.html

  4096   Thu Dec 23 22:13:50 2010 KojiUpdateGeneralPZT HV turned on

The four IOO PZTs have been turned on in order to confirm the alignment of the IFO.

Once they are turned on, the spots (ITMX/ITMY/PRM/SRM) on the REFL CCD have been easily found.

When the X-arm was aligned to the green beam, it is easily locked to TEM00. Also some LG modes were visible.
i.e. There is some room to improve the mode matching.
The transmitted green at the PSL table is a bit too high and clipped by the first mirror on the table.

No IR flashes were found in either arms.

------------------

The below are the range and the set values of the strain gauge readback for the PZTs.
When the closed loop buttons are activated the PZTs are fixed at those values, if no one touches the set point dials.

            Min   Max   SetP | Display on the module
PZT1 Yaw    2.20  9.95  6.08 | Broken
PZT1 Pitch -0.011 8.89  4.40 | 1.58

PZT2 Yaw    0.737 9.94  5.37 | 2.17
PZT2 Pitch  0.010 9.42  4.71 | 1.89

  4099   Fri Dec 31 12:41:02 2010 ranaUpdateGeneralIR flashes

I came in today to check up on the StripTool and burn the Ubuntu LTS (new CDS OS) DVD. I was pretty excited to see the PRM flashes on Mon1.

I waggled the PRM/BS alignments and got a good contrast MICH and then bright flashes in the PRM that totally overload Mon1's CCD.

Now I can see flashes of some IR junk in the X Arm; its way off on the left edge of the mirror, but there's a beam.

For the short term, we can hook up the IO PZTs to some old EPICS channels (like one of the AUX guys in the LSC area), but eventually it has to get hooked up to the new ASC or ASS. We have to bug Joe to see where this shows up in his master diagram.

**Note: if you get lost sometimes when doing the alignments, remember that you can use time_machine_conlog.

Ex:

rossa:general>./time_machine_conlog 2010/12/31,11:00:00 PDT C1:SUS-ITMX_PIT_COMM
Issuing the conlog command:
/cvs/cds/caltech/conlog/bin/conlog +epics -interp at 2010/12/31,11:00:00 PDT "C1:SUS-ITMX_PIT_COMM"


Conlog Replied:

LIGO controls: values at 2010 12/31 11:00:00 pst
 __Epics_Channel_Name______   __value_____
 C1:SUS-ITMX_PIT_COMM         0.406100



Restoring now...

Restoration Successful

Attached is the last 8 days of Vacuum Pressure trend which includes the pumpdown.

Attachment 1: Untitled.png
Untitled.png
  4142   Wed Jan 12 02:41:19 2011 kiwamuUpdateGeneraldaytime tasks for tomorrow

[Rana, Kiwamu]

Here is the list for the daytime tasks of tomorrow, Jan. 12th.

The daytime task is a work basically to be done or quitted before the sun goes down.

Along with the tasks, we roughly assigned the people who are responsible for it.

The tasks below are basically separated from each other, so we can work in parallel.

 

 

--- 1.  LSC analog interface check (Joe/Koji)

   * check whitening filter

   * demodulation board check

    * check ADC connections

 

--- 2.  MC2 coil Dewhitening (Joe)

    * fix binary outputs.

    * FM9 must be the trigger of the binary outputs instead of FM10.

 

--- 3. 11MHz modulation depth (Kiwamu)

   * investigate why the depth is so low

 

--- 4. PEM DAQ name issue (Jenne)

   * change the name of seismic channels properly so that we can deal with the calibrated stuff

 

--- 5. phase adjustment for MC-PDH locking (Suresh)

 

--- 6. medm screens for C1LSC ()

    * make screens

 

 

 

  4158   Fri Jan 14 17:58:50 2011 OsamuConfigurationGeneralStandalone RT setup

 I'll be gone to Hanford site next week and come back to Caltech on 24th's week.

I setup a standalone RT system at the desk around circuit stock in the 40m.

Please leave this setup until I come back. I'll keep working when I come back.

 

  4197   Tue Jan 25 00:09:54 2011 KojiUpdateGeneralJenne laser is at PSL Lab

I found Tara's elog entry that Jenne laser is at PSL Lab.
Since we recently use it frequently, we should be aware where it is now.

  4225   Sat Jan 29 00:31:05 2011 SureshUpdateGeneralVertex crane upgrade completed

The Vertex crane is smarter and safer now.  This upgrade ensures that the two sections of I-beam (8ft, 4ft) remain firmly latched to form a straight member till the latch is released.

In specific, it ensures that problems such as this one do not occur in the future.

 

The new safety features are:

When the I-beam sections are latched together, a pneumatic piston ensures that the latch is secure. 

If the latch is not engaged the trolley does not move outward beyond the end of the 8-foot section of the I beam.

If the trolley is out on the 4-foot section of the beam then we cannot disengage the latch.

 

How does it work?

 

 Vertex_Crane-2.png Vertex_Crane-4.png

 

The state of the Limit Switch 1 changes when the trolly goes past it.    The Limit Switch 2 gets pressed when the two sections are latched together.

The pneumatic piston raises or lowers the latch.  The Pneumatic Latch Switch operates a pneumatic valve controlling the state of the piston.

 

 

Vertex_Crane-3.png P1280545.JPG

The new controller now has Pneumatic Latch Switch in addition to the usual Start, Stop, Up, Down, In and Out buttons. 

Each of the Up, Down, In and Out buttons have two operational states:  Half pressed (low speed) and Full pressed (High Speed).  Their functions remain the same as before.

 

The new Pneumatic Switch:

When this switch is 'Engaged' and the 4 ft section is swung in-line with the 8 ft section, the two sections get latched together.

To unlatch them we have to throw the switch into the 'Disengage' state.  This makes the piston push the latch open and a spring rotates the 4 ft section about its pivot.

Limit Switch 2 is not pressed (I-beams not aligned straight) ==> Limit Switch 1 will prevent the trolley from out going beyond the 8 ft section.

While Limit Switch 2 is pressed we cannot disengage the latch.

 

Note: 

   The pneumatic piston requires 80psi of pressure to operate.  However we have only 40psi in the lab and the piston seems to operate quite well at this pressure as well.  I believe a request has been made to get an 80psi line laid just for this application.

 

Attachment 1: Vertex_Crane-2.png
Vertex_Crane-2.png
Attachment 2: Vertex_Crane-4.png
Vertex_Crane-4.png
  4235   Tue Feb 1 15:09:41 2011 KojiOmnistructureGeneralProjector - fixed

The projector in the controls room has been fixed the orange blinking of the status LED.

What we needed was to push "Volume -" and "Menu" for 5 sec.
This resets the timer of the lamp. When the timer reaches 2500 hours, it automatically start sabotaging.

We've got the spare lamp. It is in the top drawer of the computer cabinet on which the label makers are.

  4290   Mon Feb 14 17:16:47 2011 steveUpdateGeneralracks, breakers labeled

The south arm labels were changed from y to x to reflect reality.

So racks, manual disconnects and breakers now have their actual name. The east arm will be changed over tomorrow.

Please remove incorrect labels if you see any !

I can not find 1X4 breaker so it will be  traced.

  4297   Tue Feb 15 06:59:57 2011 Suresh, JenneOmnistructureGeneralX end enclosure left open

[Jenne, Suresh]

 Jenne found the X-end table enclosure had been left open.  She replaced the lid on it.

 

  4299   Tue Feb 15 11:53:02 2011 kiwamuSummaryGeneraltoday's missions

I think this week is going to be an "alignment week".

The goal is to get a good alignment on X arm for both the green and the IR beam in order to reduce a2l couplings.

 

Today's missions are :

 - fixing the oplev channel names (see here)

 - fixing the oplev gain issue (see here)

 - engage the oplev servos

 - f2p adjustment

 - make a realtime lockin model for the f2p measurement and the dithering technique

 - alignment of the MC incident beam  (because we installed a new PMC this morning)

 - manual alignment of the IR beam by steering PZT1 and PZT2 (this procedure will be replaced by an automatic way soon)

 - bounce roll filters (see here)

 

  4310   Thu Feb 17 00:43:13 2011 kiwamuSummaryGeneralto do list for tomorrow

Let's share our tasks !

 

==== daytime ===

 . mode matching for MC  (Jenne/Koji)

 . mode matching for doubling crystal on PSL table (Suresh/Koji)

 . f2p adjustment (Kiwamu)

 . fix daq and CDS issues (Joe)

 . increase oplev gain (low priority)

 . make ITMY camera nicer (Steve)

 . c1ass simlink model (Valera/Joe)

 . Bounce Roll notches (Suresh)

 

==== nighttime (after 7pm) ====

 . align everything   (at first green beam, then X arm cavity and finally IR beam)

 . update the noise spectrum of the green locking

 . estimate the noise from angle to length coupling

  4322   Fri Feb 18 00:35:21 2011 kiwamuSummaryGeneralto do list for Feb. 18th

DAYTIME

  -  more precise F2P measurement and modify lockin simlink model (Kiwamu)

  -  run  C1ASS to check it (Valera)

  -  take care of CDS (Joe)

  -  MC mode matching (Jenne/Koji)

   -  RF stuff  (Suresh)

  -  mode matching for doubling crystal at PSL table (low priority)

  -  OPLEV (low priority)

NIGHITTIME

 -  update the noise spectra of green locking

 -  make noise budgets

  4357   Fri Feb 25 13:28:14 2011 kiwamuSummaryGeneralto do list
 Because it maybe useful to share this kind of information among us, I just put a to-do-list which has been continuously noted in my laptop.
 I guess those items can be applied for the coming two months (i.e. March and April). Anything else ?

-- Alignment

     - C1ASS

           * finalize the model and make user friendly scripts and medm screens
           * adjustment of phase rotations
           * cavity auto alignment for green

     - MC WFS 

          * put sensing matrices
          * whitening ?

    - OPLEVs

        * binary output for OPLEV whitening
        * calibration of OPLEVs  [rad/count]
        * characterization of OPLEV servos
        * bigger trans impedance gains to have reasonable readouts


-- Optimization of Suspended Optics

  - diagonalizations

         * input matrices
         * f2p with higher precision

  - damping control

        * fix ETMY damping
         * Bounce Roll notches
         * Q adjustment for damping

  - upgrading of electronics

        * bigger trans impedance gain for OSEMs
        * widen the voltage range of AA filter boards
   

   - weekly check

       * a routine script for measuring free swinging spectra


-- Input Optics

   - PMC

         * mode matching
         * epics LO HI values

   - FSS and ISS

        * recover FSS
        * make ISS working

   - EOM

       * AM minimization
       * triple resonant box

   - doubling and RFPD for green

        * mode matching to doubling crystal
        * connect RFPD_DC_MON to ADC
        * string +/-150 V and +/-15power cables from 1X1 rack to RFPDs
        * visibility check and loss investigations for the beat RFPD
        * rearrange RF amplifiers (ZLN series) for the RFPD
        * realgin Jenne's DCPD

 

-- Length Sensing and Control

   - digital system and electronics

       * characterization of RFPDs ==> SUresh/UG
       * installation of RF generation box and distribution box ==> Suresh/U
       * new LSC model and start making useful scripts (csh ? perl ? python ?)
       * binary outputs for PD whitening
       * make item lists for ordering (?)
       * draw cool diagrams for RF cable distribution and map of LSC rack.


-- Green Locking

    - X end station

           * eliminate undesired multiple spots on RFPD
           *  connect REFLPD_DCMON to ADC
           *  remote local boost
           * demodulation phase adjustment
           *  look for a high voltage amp. (bipoler)
           * installation of a mechanical shutter
           *  ETMX_TRANS CCD camera
           * analog low pass filter for temperature control

    - Y arm green locking ==> Suresh/Bryan

        * item lists
        * preparation of base mounts
        * mode matching estimation
        * mode measurement of input beam from Lightwave
        * temeperature scanning for beat location finding with IR beam
        * Installation
       * modification of PDH box

    - digital control systems

           * user friendly medm screens
           * apply proper filters for AC-DC whitened signal blending
           * add MC2 feedback path

      - noise budget

          * in-loop and out-of-loop evaluation
          * shot noise  
          * RFPD noise modeling
          * how intensity noise couples through MFD
          * electrical noise
          * frequency noise contribution from end laser and PSL
          * calibration of arm PDH signal

   - cavity scan and handing off

         * optimization of open loop transfer function for ALS
         * auto scripts   

-- misc.

   - CCD camera
        * color filters to separate IR and green (?)
   - lab laptops
        * a laptop for each end station (?)
    - dichroic TT (?)
        * large wegded and AR coated for 532nm (?)
    - epics for RS232C      
        * RS232C for doubling oven temperature

 

  4359   Fri Feb 25 14:50:16 2011 KojiSummaryGeneralto do list

- Put priority on the list

- Put names on the items

- Where is the CDS TO DO ==> Joe

-

- Remote disconnection of the greeen PDH 

- What is the situation of the PD DC for the LSC PDs?

- SUS Satelite box Resister replacement ==> Jamie

- IMC mode matching ==> Jamie/Larisa 

- Mechanical shutters everywhere

- SRM OPLEV Connection

- MC OAF

- Better LSC whitening boards

- DAFI 

Quote:
 Anything else ?

  4364   Mon Feb 28 11:22:40 2011 josephbSummaryGeneralto do list
Quote:

- Where is the CDS TO DO ==> Joe

CDS To Do:

1) Get ETMY working - figure out why signals are not getting past the AI board (D000186) to the coils.

2) Get TDS and command line AWG stuff working

3) Get c1ass and new c1lsc (with Koji) fully integrated with the rest of the system.

4) Get CDS software instructions up to date and well organized.

5) Redo cabling  and generally make it a permanent installation instead of hack job:

   a) Measure cable lengths, check connectors, wire with good routes and ensure strain relief.  Ensure proper labeling

   b) Get correct length fiber for c1sus RFM and timing.

   c) Fix up final BO adapter box and DAC boxes.

   d) Make boxes for the AA filter adapters which are currently just hanging.

   e) Get two "faceplates" for the cards in the back of the ETMY IO chassis so they can screwed down properly.

   f) Remove and properly store old, unused cables, boards, and anything else.

6) Create new documentation detailing the current 40m setup, both DCC documents and interactive wiki.

7)  Setup an Ubuntu work station using Keith's wiki instructions

 

Simulated Plant To Do:

1)Create simulated plant to interface with current end mass controls (say scx).

2) Create proper filters for pendulum and noise generation, test suspension.

3) Propagate to all other suspensions.

4) Working on simulated IFO plant to connect to LSC.  Create filters for near locked (assume initial green control perhaps) state.

5) Test LSC controls on simulated IFO.

6) Fix c code so there's seamless switching between simulated and real controls.

CDS Status:

MC damp dataviewer diaggui AWG c1lsc c1ioo c1sus c1iscex c1iscey RFM The Dolphins Sim.Plant Frame builder TDS Cabling
                             
  4371   Wed Mar 2 22:57:57 2011 sureshSummaryGeneralStuff from LLO

Here is a partial list of stuff which is being packed at LLO to be shipped to CIT.  The electronics ckt boards are yet to be added to this list.  Will do that tomorrow.

 

 

Attachment 1: eLIGO_items_from_LLO_for_Caltech.xls
  4381   Mon Mar 7 17:58:14 2011 sureshSummaryGeneralStuff from LLO

Here is the updated list. These lists were used as packing lists and therefore are organised by Box #.
Attachment 1: eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf
eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf
  4405   Fri Mar 11 16:30:42 2011 steveUpdateGeneralhigh speed servo unit is here

New Focus Servo Controller has just arrived. We have 25 days to evaluate this product.

It will have to be shipped back to the vendor on April 4, 2011 the latest in order to get full refund.

Attachment 1: P1070462.JPG
P1070462.JPG
  4412   Fri Mar 18 14:18:00 2011 kiwamuSummaryGeneralnew laser pointers

Just for a record. We got 4 new laser pointers (2 greens, 1 blue, and 1 green and red combination). Don't lose them.

They reside in a bucket on the SP table, where IR viewers and sensor cards also reside.

DSC_2883_ss.jpg

  4433   Wed Mar 23 14:19:35 2011 KojiSummaryGeneralGrand Plan

This is the grand plan we talked about in the beginning of the meeting.

  • (Kiwamu) X-end Green cleaning up / Prep for DRMI
  • (Bryan) Y-end Green
  • (Suresh) Help Bryan / RF (w. Kevin)
  • (Jenne) MC WFS / Y-arm IR alignment / MC adaptive feedforward (incl. CDS)
  • (Koji) LSC
  • (Joe) CDS cleaning up
  • (Jamie) Help Joe / Noise Budget
  • (Larisa) PMC scan / PSL photo&diagram
  • (Barbarela) ASS
  4458   Tue Mar 29 22:29:16 2011 kiwamuUpdateGeneralsome tasks tomorrow

 *  Temporary strain relief for the heliax cables on 1X2 (Steve)

 *  RF diagrams and check lists (Suresh)

      => In the lunch meeting we will discuss the details about what we will do for the RF installation.

 *  Electronics design and plan for Green locking (Aidan / Kiwamu)

      => In the lunch meeting we will discuss the details.

 *  LSC model (Koji)

 *  Video cable session (team)

 * LPF for the laser temperature control (Larisa)

  4461   Wed Mar 30 16:57:13 2011 kiwamuUpdateGeneralturned off c1aux

[Steve / Kiwamu]

 As a part of the video cable session, we reconnected some power cords on 1Y1 rack.

During the work we momentarily turned off c1aux, which handles DMF, Illumintators, mechanical shutters and the old video epics.

I think it automatically reverted the things, but we may need to check them.

  4475   Thu Mar 31 11:30:51 2011 steveConfigurationGeneralstrain relieved rf cables

I strain relieved RF cables labeled 33 MHZ LO and 166 MHZ to EOM at 1X2  This is a temporary setup for the 11 MHZ

The coax N  bulkheads connectors are mounted on the plastic front panel now.

Attachment 1: P1070491.JPG
P1070491.JPG
  4488   Tue Apr 5 17:31:59 2011 steveSummaryGeneralnew laser pointers

Quote:

Just for a record. We got 4 new laser pointers (2 greens, 1 blue, and 1 green and red combination). Don't lose them.

They reside in a bucket on the SP table, where IR viewers and sensor cards also reside.

DSC_2883_ss.jpg

 Low power green-red laser pointers are in. High power green, red and blue pointers are confiscated.

Attachment 1: P1070530.JPG
P1070530.JPG
  4515   Tue Apr 12 12:01:30 2011 josephbUpdateGeneralIFO controls, now with 10% less lying (ITMX/ITMY controls swapped)

The ITMX/ITMY control swap is complete.

The steps from this elog were followed.

In addition, I did a burt restore of c1sus, c1mcs.

I then swapped all the gain settings from ITMX to ITMY, and reenabled the watchdogs.

I did some basic kick tests (1000 counts into UL coil) and confirmed channels like C1:SUS-ITMX_ULPD_VAR (watchdogs mV readback) corresponded to the correct optic.  I also checked that the POS, PIT, YAW, SIDE produced reasonable damping when engaged.