  1377   Mon Mar 9 17:11:38 2009 AlbertoConfigurationoplevsoptical levers centering

Yoichi, Alberto

this afternoon we centered the optical levers for all the optics.

To do that we first ran the alignment scripts for all the cavities.

  9156   Tue Sep 24 20:43:45 2013 masayukiSummarySUSoptical levers centering

I centered optical levers of ITMX,BS,ETMY. I also change the position of optical levers of ITMX, ETMY, ITMY, BS on Friday night(9/21), of ITMX, ETMY, BS on Monday night. Both are around 6:00 ~ 7:00.But centering on Monday was totally wrong, because I centered with not good IFO alignment.

The attachment is the 5 days trend of the opt lev of ITMX. First gap is alignment on Friday and Second gap is the alignment on Monday. Now I centered after  locking the FPMI.

The attachment 2 is the last 6 hours data.  The gap on 9/25 00:00 and 1:30(UTC)  is because the alignment of the cavity and the last gap is because of  centering of the optical lever.

Attachment 1: Screenshot-Untitled_Window.png
Screenshot-Untitled_Window.png
Attachment 2: Screenshot-Untitled_Window-1.png
Screenshot-Untitled_Window-1.png
  7106   Tue Aug 7 16:11:23 2012 steveUpdateSUSoptical table box wall proposal

 Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007" thermashield and  0.125" yellow acrylic

Visibility: 70 %,    Transmission of 1064 nm  2-3 % at 0-50 degrees incident  power density 0.7 W/mm2

Max power 100 mW

        

Attachment 1: IMG_1479.JPG
IMG_1479.JPG
Attachment 2: IMG_1478.JPG
IMG_1478.JPG
  7107   Tue Aug 7 16:21:16 2012 ranaUpdateSUSoptical table box wall proposal

Quote:

 Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007" thermashield and  0.125" yellow acrylic

Visibility: 70 %,    Transmission of 1064 nm  2-3 % at 0-50 degrees incident  power density 0.7 W/mm2

Max power 100 mW        

 Good. The power density and max power are not important (especially since you don't define a quantitative way to spec them). We ONLY care about the transmission.

  4701   Thu May 12 09:00:23 2011 steveUpdateGeneraloptical table covers must be used

I found ITMX-ISCT and BS-ISCT ( IFO sensing-control table)  not covered this morning. Please do not leave tables open.

  9941   Mon May 12 14:42:25 2014 steveUpdateendtable upgradeoptical table enclosure wall proposal and table at ETMY

Quote:

 Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of  0.007" thermashield  and  0.125" yellow acrylic

Visibility: 70 %,    Transmission of 1064 nm  2-3 % at 0-50 degrees incident,   power density  ~ 0.7 W/mm2

Max power 100 mW

        

More details about this east end  " acrylic + "   enclosure ( optical table cover ) can be found elog entry 6210, 7194 and  7106

 

Window tinted layer transmission plot is below.

 

We have a film which may meet your requirements and the values are shown below:

         

               Wavelength (nm)              Transmission                     Reflectance(front)            Reflectance (back)

 

                        1060                               .0772                               .604                                     .759

 

                        1070                               .0723                               .615                                     .772

 

These values are taken from the LBNL Optics 6 program and if you have access to that program, the NFRC ID for the film is 202.   If you do not have access to the program, I have a captured the graph which may be of some help.  I apologize for the appearance of the graph but someone at LBNL decided it would look better with a dark gray background – the yellow is the transmission curve, the blue is the reflectance (front) and the green is the reflectance (back).

 

 

The film is referred to as “Hilite 70” and has a 72% visible light transmission.  These results were obtained with the film mounted on 1/8” clear glass.

 

I

 

 

 

 

 

Saint-Gobain Performance Plastics

www.solargard.com

 

Please consider your environmental responsibility before printing this email.

 

 

 

Attachment 1: Hilite70.jpg
Hilite70.jpg
Attachment 2: ETMY-ISCT.jpg
ETMY-ISCT.jpg
Attachment 3: RoscoThermashield.pdf
RoscoThermashield.pdf
  10071   Thu Jun 19 14:12:45 2014 steveUpdatesafetyoptical table scans

 

 PSL, AP, ETMY and ETMX optical tables were scanned for stay beam.

  6139   Tue Dec 20 15:49:21 2011 steveUpdatePEMoptical table top

3/4 " thick colored acrylic material will be used in this air tight design. Surgical tubing for o-ring. We may have to put an o-ring into the bottom to have it really air tight.

Feedtrouhs: www.roxtec.com

The top drawing is not ready. It will have handle and industrial grade L-handle lock pin to hold cover down. There will be 2  one inch od post in the midle of the table to hold the cover and lock  the ball pin.

I'm waiting for your inputs, so I can send this preliminary design out for quote.

 

Attachment 1: 05150901.PDF
05150901.PDF
  6190   Thu Jan 12 10:11:59 2012 steveUpdatePEMoptical table top with 1" wall

Quote:

3/4 " thick colored acrylic material will be used in this air tight design. Surgical tubing for o-ring. We may have to put an o-ring into the bottom to have it really air tight.

Feedtrouhs: www.roxtec.com

The top drawing is not ready. It will have handle and industrial grade L-handle lock pin to hold cover down. There will be 2  one inch od post in the midle of the table to hold the cover and lock  the ball pin.

I'm waiting for your inputs, so I can send this preliminary design out for quote.

 

 The present plan to go with clear cast acrylic plexiglass 1" thick side wall  and  two  clear  1/2 thick top cover.

The inside would be lined with light braun YAG safety window sheets 0.14"  VLT ~25%  OD 4 @ 532nm & OD 5 @ 1064nm

 

Attachment 1: 101122012atc.PDF
101122012atc.PDF
  5260   Thu Aug 18 00:58:40 2011 jamieUpdateSUSoptics kicked and left free swinging

ALL optics (including MC) were kicked and left free swinging at:

997689421

The "opticshutdown" script was also run, which should turn the watchdogs back on in 5 hours (at 6am).

 

  1071   Thu Oct 23 11:26:25 2008 steveBureaucracyVACoptosigma forks for vacuum
Nine short forks from OptoSigma were cleaned, baked and measured by Bob T.
They passed the LIGO vac compatiblity test as Rana predicted.
Remember: Thorlab and Newfocus forks failed this qualification process.
  6856   Fri Jun 22 19:52:47 2012 JamieUpdateComputersottavia reconfigured as CDS workstation

ottavia has been reinstalled with Ubuntu 10.04 LTS, and has been configured as a CDS workstation.

I have been maintaining a script that takes a stock 10.04 install and configures it as a workstation.  I've attached it here, but it lives at:

/users/controls/workstation-setup.sh

The script is designed to be idempotent, i.e. it can be run on a machine that has already been configured and it will either have no affect or update.

Attachment 1: workstation-setup.sh
#!/bin/bash

# This is a CDS workstation setup script for Ubuntu 10.04 It is
# idempotent, so running it on an already configured workstation is
# fine.

########################################
### controls

if [[ $(id -u controls) != 1001 ]] ; then
... 111 more lines ...
  2633   Tue Feb 23 16:20:44 2010 steveConfigurationVACoutgassing + leak

Quote:

As preparation for the upcoming planned power outage we turned turbos, RGA off and closed valves.

IFO chamber is not pumped now. Small leaks and out gassing will push the pressure up slowly. At 3 mTorr of P1 the PSL output shutter

will be closed by the interlock.

It is OK to use light in the IFO up to this point.

 Our vacuum was not pumped for 4 days. The computers were not up when we started pumping again. The manual reading on P1 was 15 mTorr.

This means that our outgassing plus leakrate is  ~3.8 mTorr /day 

3-5 mTorr / day is normal

Attachment 1: outgleak.jpg
outgleak.jpg
  9028   Mon Aug 19 10:16:15 2013 PicassoMetaphysicsTreasureoutsider art

 ranasglory.png

  14002   Fri Jun 22 00:06:13 2018 shrutiUpdateGeneralover-head fluorescent lights down

Two out of the four over-head fluorescent lights in the X end of the interferometer were flickering today.

  8431   Tue Apr 9 14:55:13 2013 JamieUpdateCDSoverbooked test points cause of DAQ problems

Folks were complaining that they were getting zeros whenever they tried to open fast channels in DTT or Dataviewer.  It turned out that the problem was that all available test points were in use in the c1lsc model:

lsc-gds.png

There is a limit to how many test points can be open to a single model (in point of fact I think the limit is on the data rate from the model to the frame builder, not the actual number of open test points).  In any event, they was all used up.  The grid at the bottom right of the C1LSC GDS screen was all full of non-zeros, and the FE TRATE number was red, indicating that the data rate from this model had surpassed threshold.

The result of this overbooking is that any new test points just get zeros.  This is a pretty dumb failure mode (ideally one would not be able to request the TP at all with an appropriate error message), but it is what it is.  This usually means that there are too many dtt/dataviewers left with open connections.

We tried killing all the open processes that we could find that might be holding open test points, but that didn't seem to clear them up.  Stuck open test points is another known problem.  Referencing the solution in #6968 I opened the diag shell and killed all test points everywhere:

controls@pianosa:~ 0$ diag -l -z
Set new test FFT
NDS version = 12
supported capabilities: testing  testpoints  awg  
diag> tp clear * *
test point cleared
diag> quit
EXIT KERNEL
controls@pianosa:~ 0$
  14394   Thu Jan 10 10:23:46 2019 gautamUpdateVACovernight leak rate

Overnight, the pressure increased from 247 uTorr to 264 uTorr over a period of 30000 seconds. Assuming an IFO volume of 33,000 liters, this corresponds to an average leak rate of ~20 uTorr L / s. It'd be interesting to see how this compares with the spec'd leak rates of the Viton O-ring seals and valves/ outgassing rates. The two channels in the screenshot are monitoring the same pressure from the same sensor, top pane is a digital readout while the bottom is a calibrated analog readout that is subsequently digitized into the CDS system.

Quote:
 

We allowed the pumpdown to continue until reaching 9e-4 torr in the main volume. At this point we valved off the main volume, valved off TP2 and TP3, and then shut down all turbo pumps/dry pumps. We will continue pumping tomorrow under the supervision of an operator. If the system continues to perform problem-free, we will likely leave the turbos pumping on the main volume and annuli after tomorrow.

Attachment 1: OvernightLeak.png
OvernightLeak.png
  14429   Sat Feb 2 21:53:24 2019 KojiUpdateVACovernight leak rate

The pressure of the main volume increased from ~1mtorr to 50mtorr for the past 24 hours (86ksec). This rate is about x1000 of the reported number on Jan 10. Do we suspect vacuum leak?

Quote:

Overnight, the pressure increased from 247 uTorr to 264 uTorr over a period of 30000 seconds. Assuming an IFO volume of 33,000 liters, this corresponds to an average leak rate of ~20 uTorr L / s.

 

Attachment 1: Screen_Shot_2019-02-02_at_21.49.33.png
Screen_Shot_2019-02-02_at_21.49.33.png
  14430   Sun Feb 3 15:15:21 2019 gautamUpdateVACovernight leak rate

I looked into this a bit today. Did a walkthrough of the lab, didn't hear any obvious hissing (makes sense, that presumably would signal a much larger leak rate).

Attachment #1: Data from the 30 ksec we had the main vol valved off on Jan 10, but from the gauges we have running right now (the CC gauges have not had their HV enabled yet so we don't have that readback).

Attachment #2: Data from ~150 ksec from Friday night till now.

Interpretation: The number quoted from Jan 10 is from the cold-cathode gauge (~20 utorr increase). In the same period, the Pirani gauge reports a increase of ~5 mtorr (=250x the number reported by the cold-cathode gauge). So which gauge do we trust in this regime more? Additionally, the rate at which the annuli pressures are increasing seem consistent between Jan 10 and now, at ~100 mtorr every 30 ksec.

I don't think this is conclusive, but at least the leak rates between Jan 10 and now don't seem that different for the annuli pressures. Moreover, for the Jan 10 pumpdown, we had the IFO at low pressure for several days over the chirstmas break, which presumably gave time for some outgassing which was cleaned up by the TPs on Jan 10, whereas for this current pumpdown, we don't have that luxury.

Do we want to do a systematic leak check before resuming the pumpdown on Monday? The main differences in vacuum I can think of are

  1. Two pieces of Kapton tape are now in the EY chamber.
  2. Possible resiudue from cleaning solvents in IY and EY chambers are still outgassing.

This entry by Steve says that the "expected" outgassing rate is 3-5 mtorr per day, which doesn't match either the current observation or that from Jan 10.

Attachment 1: Jan10_data.png
Jan10_data.png
Attachment 2: Feb1_data.png
Feb1_data.png
  14431   Sun Feb 3 20:52:34 2019 KojiUpdateVACovernight leak rate

We can pump down (or vent) annuli. If this is the leak between the main volume and the annuli, we will be able to see the effect on the leak rate. If this is the leak of an  outer o-ring, again pumping down (or venting) of the annuli should temporarily decrease (or increase) the leak rate..., I guess. If the leak rate is not dependent on the pressure of the annuli, we can conclude that it is internal outgassing.

  14795   Mon Jul 22 07:21:13 2019 gautamUpdateCDSpainosa messed with

Somebody changed the settings on painosa without elogging anything about it. Why does this keep happening? I thought the point of the elog was to communicate. I think there are sufficient number of problems in the lab without me having to manually reset the control room workstation settings every week. Please make an elog if you change something.

  12829   Wed Feb 15 00:26:44 2017 JohannesUpdateDAQpanels and pcbs

I finished designing the PCBs for the VME crate back sides (see attached). The project files live on the DCC now at https://dcc.ligo.org/LIGO-D1700058. I ordered a prototype quantity (9) of the PCB printed and bought the corresponding connectors, all will arrive within the next two weeks. See also attached the front panels for the Acromag DAQ chassis and Lydia's RF amplifier unit (the lone +24V slot confuses me: I don't see a ground connector?). On the Acromag panel, six (3x2) of the DB37 connectors are reserved for VME hardware, two are reserve, and I filled the remaining space with general purpose BNC connectors for whatever comes up.

Attachment 1: acromag_chassis_panel.pdf
acromag_chassis_panel.pdf
Attachment 2: vme_backplane_panel.pdf
vme_backplane_panel.pdf
Attachment 3: rfAmp.pdf
rfAmp.pdf
  12830   Wed Feb 15 09:06:13 2017 ericqUpdateDAQpanels and pcbs

The amplifier unit should use the three pin dsub connectors (3w3?) that we use on many of the other units for DC power, and preferably go through the back panel. You can leave out the negative pin, since you just need +24 and ground.

  12832   Wed Feb 15 22:21:12 2017 LydiaUpdateDAQpanels and pcbs

This is already how it's hooked up. The hole on the from that says +24 V is for an indicator light.

Quote:

The amplifier unit should use the three pin dsub connectors (3w3?) that we use on many of the other units for DC power, and preferably go through the back panel. You can leave out the negative pin, since you just need +24 and ground.

 

  16702   Sat Mar 5 01:58:49 2022 KojiSummaryCDSpaola rescue

ETMY end ThinkPad "paola" could not reboot due to "Fan Error". It seems that it is the failure of the CPU fan. I really needed a functional laptop at the end for the electronics work, I decided to open the chassis. By removing the marked screws at the bottom lid, the keyboard was lifted. I found that the CPU fan was stuck because of accumulated dust. Once the fan was cleaned, the laptop starts up as before.

Attachment 1: PXL_20220305_035255834.jpg
PXL_20220305_035255834.jpg
Attachment 2: PXL_20220305_034649120.MP.jpg
PXL_20220305_034649120.MP.jpg
  12498   Fri Sep 16 14:15:28 2016 steveUpdatePEMpartical counts

South end flow bench and both clean room assembly flow benches measured zero counts for 0.3 and 0.5 micron size particales.

The counting efficiency of 0.5 micron is 100%

 

  location

 

 

        0.3 micron particles / cf min

 

 

      0.5 micron particles / cf min

 

 

 counter

 MET

 ONE

 

       effect
 ITMY table  35,000  3,000   #3  
 ETMY table  35,000  3,000   #3  
 ITMX table  24,000  2,400   #3  PSL HEPA at 50V
 ITMX wall mounted  -  2,500   #1  
 ETMX work bench    5,000     600   #3   flow bench on  

 

The PSL HEPA performance was measured at the center of the table with MET ONE #3

 Voltage Variac particles /cf min   particles /cf min
 particle size  0.3 micron  0.5 micron
 60  0  0
 50  10  0
 40  1,400  110
 20  1,400  100
Attachment 1: 80days.png
80days.png
  7754   Tue Nov 27 11:27:22 2012 SteveUpdatePEMparticle count is going up

Jeff is still working on the filter banks.
Attachment 1: 5yparticles.png
5yparticles.png
Attachment 2: particle_6m_6m.png
particle_6m_6m.png
Attachment 3: 1y_particlec.png
1y_particlec.png
Attachment 4: 10y_particle_c.png
10y_particle_c.png
  1127   Mon Nov 10 16:44:14 2008 steveUpdatePEMparticle counter at MC2
The particle counter was moved to MC2 table temporarily.
It is clamped to the table at the south west corner.
It is pumping for 20s and waiting for 2 minutes now.
  12895   Mon Mar 20 17:12:08 2017 steveUpdatePEMparticle counter inside of PSL enclousure

The logging script is multiplying by 100 instead of 10 !

Quote:

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

 

Attachment 1: enclousure_partical_count.png
enclousure_partical_count.png
  12908   Mon Mar 27 15:36:27 2017 SteveUpdatePEMparticle counter inside of PSL enclousure

 

Quote:

The logging script is multiplying by 100 instead of 10 !

Quote:

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

 

Some one turned up the PSL HEPA rotation voltage from 20 V to 33 ( 120V Variac ) and  X-arm AC set temp lowered to 68F

Effects at 12" height from optical table :

                                                            1.0, 0.5 & 0.3 micron particle count  goes to zero and temperature fluctuaion increased

Rotation speed voltage was set to 30V

                                                            

Attachment 1: HEPA_flow_effects.png
HEPA_flow_effects.png
  834   Thu Aug 14 11:39:06 2008 steveUpdatePEMparticle counter is out of order
The 40m ifo paricle counter sensor failed last night.
  12836   Fri Feb 17 10:56:12 2017 steveUpdatePEMparticle counter moved into PSL enclousure

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

Attachment 1: from_here.jpg
from_here.jpg
Attachment 2: to_here.jpg
to_here.jpg
Attachment 3: PSL_particles.png
PSL_particles.png
  3547   Wed Sep 8 16:17:58 2010 steveUpdatePEMparticle counter problem

I played with the particle counter this morning. Now it's running and reading the correct numbers on the old COCHECKLIST.adl medm screen.

However, it can not be seen with dataviewer.

Koji just rebooted the frame builder and the problem was solved.

  871   Fri Aug 22 16:06:29 2008 steveUpdatePEMparticle counter replaced, flowbenches & HEPAs checked
MetOne #2 counter was swapped in (on the top of IOC, facing SW direction, at ~75 deg upwards)
with channel one size 0.3 micron and channel two size 1.0 micron.
Sampling time was reduced from 60s to 6 sec at 0.1 cf/min at 25 min rate.

This means that displayed number needs to be multiplied by x100 to get particles/cf/min


HEPA filters and flow benches were checked:

PSL enclosure closed, HEPA speed at 60% 0-0 particles on optical table NW corner

AP covered optical table 1,000 particles of 0.3micron and 10 of 1.0 micron at NE corner

Flow bench at SE 0-0 particle (p)

on the top of SP cover at SE corner 60,000 p of 0.3 micron and 530 p of 1.0 micron

Mobile HEPAs 10cm from output screen in the center 800 p of 0.3 micron and 0 p of 1 micron
These filters will be replaced.

Clean assembly room:
both flow benches 0-0 p for 0.3-1.0 micron
east side bench 520 p of 0.3 micron and 210 p of 1.0 micron

Large hood in baking room with fan on 1.7 million p of 0.3 micron
and 16,000 p of 1.0 micron

Pasadena air just outside of main entrance:
3 million p of 0.3 micron and 30,000 p of 1.0 micron

My desk 743,000 p of 0.3micron, 63,000 p of 0.5 micron and 5,500 p of 1.0 micron cf/min

NOTE: existing COCHECKLIST.adl PEM displays needs to be corrected so it shows the 10 fold increase
and change particle size on this screen to 0.3 micron
  9180   Tue Oct 1 10:06:27 2013 SteveUpdatePEMparticle counts

How can we improve the cleanliness of the 40m IFO room 104 ? May be Mario Batali crocs if you chief chef of the lab likes it. We can do more effective things.

Atm 1 is showing the lab air quality dependence on outside air  measured at the top of the IOO chamber. This made me to measure the   differential  pressure between lab and out side.

Properly sized air conditioner is over pressurizing it's room by 0.05 [" Water] like clean assembly room.

The 40m at Vertex location is barely getting pressurized to 0.01 " W

The control room is OK with 0.04 " W but it's air quality is very bad! It is 10x worse at 0.5 micron than IFO room.

Every entry from well pressurized control room into barely pressurized  IFO  pumps dirty air to our "clean room."

This door should be closed.

The drill- room entry is ideal because it is using the same air conditioner as the  main lab, therefore it has cleaner air.

 

Things to do: seal holes of CES walls, seal paint wall at south end so it will shed less, replace gas kits on doors.

I have plugged the cable tray space entering the control room above Rosalba.

Attachment 1: 3xJuly4Cal.png
3xJuly4Cal.png
Attachment 2: whichOne.jpg
whichOne.jpg
  9181   Tue Oct 1 11:24:02 2013 ranaUpdatePEMparticle counts

 Probably more important is to establish quantitatively how particle counts affects the lock acquisition or noise in the interferometer.

We don't want to adopt a "Sky is Falling" mentality as was done previously in LIGO when people were trying to outlaw burritos and perfume.

Dust monitor counts and human noses do not correlate well with the interferometer's nose.

pepelepew.jpg

When the vacuum system is closed, we might check to see if particle counts correlate with losses in the PMC or excess scatter on the ISC tables. If not, we should move on to other concerns.

  1964   Thu Sep 3 10:19:35 2009 steve, albertoUpdatePEMparticle counts and burning hillsides

The San Gabriel mountain has been on fire for  6 days. 144,000 acres of beautiful hillsides burned down and it's still burning.  Where the fires are.

The 40m lab particle counts are more effected by next door building-gardening activity than the fire itself.

This 100 days plot shows that.

Attachment 1: fire6d.jpg
fire6d.jpg
Attachment 2: 40mgarden.JPG
40mgarden.JPG
Attachment 3: 40mgarden2.JPG
40mgarden2.JPG
Attachment 4: RBLOG-FIRE-SKY.JPG
RBLOG-FIRE-SKY.JPG
  1665   Wed Jun 10 09:06:12 2009 steveUpdatePEMparticle counts and turbulance

I moved the mobile HEPA filter from ITMX's north door to ITMX-ISCT and covered it up with a merostate tent to accommodate the aluminum foil particle measurement on June 5

It lowered the 40m baseline counts by about a factor of 3 of 0.5 micron and a factor of 2 of 1.0 micron.

The HEPA filter is sweeping the floor and blowing the particles upwards. The MET ONE counter is on the top of the IOOC looking south at ~75 degrees upward.

 

Attachment 1: parturbulnc.jpg
parturbulnc.jpg
  1411   Fri Mar 20 11:01:02 2009 steveUpdatePEMparticle counts are high

The outside particle counts for 0.5 micron are 3 million this morning at 9am. Low clouds, foggy condition with low inversion layer.

This makes the 40m lab 30-50K

I just turned on the HEPA filter at the PSL enclosure.

Please, leave it on high

 

Attachment 1: particles32d.jpg
particles32d.jpg
  83   Thu Nov 8 11:40:21 2007 steveUpdatePEMparticle counts are up
I turned up the psl HEPA filter to 100%
This 4 days plot shows why
Attachment 1: pslhepaon.jpg
pslhepaon.jpg
  13922   Wed Jun 6 15:12:29 2018 KiraUpdatePEMparts from lab

Got this 1U box from the Y arm that we could potentially use (attachment 1). It doesn't have handles on the front but I guess we could attach them if necessary. Attachment 2 is a switch that could be used instead of a light up switch, but now we need to add LEDs on the front panel that indicate that the switch is functional. Attachment 3 is a terminal block that we can use to attach the 16 gage wire to since it is thick and attaching it directly to the board would be difficult. If this is alright to use then I'll change up my designs for the front panel and PCB to accomodate these parts.

Attachment 1: IMG_20180606_141149.jpg
IMG_20180606_141149.jpg
Attachment 2: IMG_20180606_141851.jpg
IMG_20180606_141851.jpg
Attachment 3: IMG_20180606_141912.jpg
IMG_20180606_141912.jpg
  13888   Thu May 24 16:08:12 2018 KiraUpdatePEMparts list

We will need to order a few things for our final setup.

  1. 1U box to place the heater circuit and temperature circuits in. The minimum depth that will fit all the electronics is 10 inches according to my sketch.
    • I found two possibilities online for this. I don't know exactly what our budget is, but this one is $144. According to the datasheet, the front panel is less than 19 inches wide, so if we are to order this one, I've adjusted the width of the panel I designed to match the width of the panel that comes with it I've labeled it in the attached file as 1U-panel-1.
    • The other possibility is this one. It comes with handles already which is quite nice. I wasn't able to find a price for it on the website.
  2. Front panel for the 1U box and block panel. I've attached them as .fpd files below in one .zip file. Not sure if this is the correct way to attach them, though.
  3. We'll also need a 16 gauge cable that has 6 wires bunched together. This is to connect up the heater circuit and AD590s. The other cables that we will need can be found in the lab.
Attachment 1: front_panels.zip
  13894   Tue May 29 16:22:43 2018 KiraUpdatePEMparts list

I've updated the parts list to be an excel document and included every single part we will need. This is ony a first draft so it will probably be updated in the future. I also made a mistake in hole sizing for the front panel so I've updated it and attached it as well (second attachment).

Edit: re-attached the EX can panel fpd file so that everything is in one place

Attachment 1: parts_list_-_Sheet1.pdf
parts_list_-_Sheet1.pdf
Attachment 2: 1U-panel-2.fpd
Attachment 3: EX-can-panel.fpd
  8062   Mon Feb 11 18:44:34 2013 JamieUpdateComputerspasswerdz changed

Quote:

Be Prepared

http://xkcd.com/936/

Password for nodus and all control room workstations has been changed.  Look for new one in usual place.

We will try to change the password on all the RTS machines soon.  For the moment, though, they remain with the old passwerd.

  3618   Wed Sep 29 01:53:44 2010 ranaUpdatePSLpaths broken and VCO turned off

I found that several linux libraries have been moved around and disabled today. In particular, I see a bunch of new stuff in apps/linux/ and ezca tools are not working.

Who did this and why is there no ELOG ???

 

Also found that someone has pulled the power cable to the function generator I was using to set the VCO offset. This is the one on top of the Rb clocks. Why?? Why no elog? This is again a big waste of time.

  15331   Thu May 14 00:47:55 2020 gautamSummaryComputer Scripts / Programspcdev1 added to authorized keys on nodus

This is to facilitate the summary page config fines to be pulled from nodus in a scripted way, without being asked for authentication. If someone knows of a better/more secure way for this to be done, please let me know. The site summary pages seem to pull the config files from a git repo, maybe that's better?

  3152   Thu Jul 1 10:26:34 2010 steveConfigurationVACpd68 at vacuum normal state

Slow pump down _pd68 has reached the vacuum normal state.  CC4_Rga region is pumped now. The RGA is still off.

Precondition to this pump down:                                                                                                                                                                                                                                                           129 days at atm,                                                                                                                                                                                                                                                                                         ITMs replaced. MMT, oplev and other components were removed from BSC, ITMCs. New MMT mirrors are in.                                                                                                             IOO_access_connector was out. The end chambers were not opened.

 

Attachment 1: pd68slow2d.jpg
pd68slow2d.jpg
Attachment 2: pem134d.jpg
pem134d.jpg
  14087   Thu Jul 19 11:01:03 2018 SteveSummaryVACpd81 @ 2e-5 Torr

Cold cathode gauge just turned on.

Attachment 1: pd81@2days.png
pd81@2days.png
  858   Wed Aug 20 11:42:49 2008 JohnSummaryComputerspdftk
I've installed pdftk on all the control room machines.

http://www.pdfhacks.com/pdftk/
  5097   Tue Aug 2 19:05:13 2011 kiwamuUpdateIOOpeparation for low power MC : HWP+PBS installed

[Steve / Kiwamu]

  An attenuator, consisting of two HWPs and a PBS, has been installed on the PSL table for the MC low power state.

Those items allow us to reduce the amount of the incident power going into the MC.

We haven't decreased the power yet because we still have to measure the arm lengths.

After we finish the measurement we will go to the low power state.

We have adjusted the polarization after the last HWP using another PBS. Now it is S-polarizing beam.

After the installation of the attenuator the beam axis has changed although we were immediately able to lock the MC with TEM00 mode.

I touched two steering mirrors on the PSL table to get the transmitted power of MC higher. At the moment the transmitted power in MC_TRANS is at about 30000 cnts.

 

The attached picture is the setup of the attenuator on the PSL table.

Attachment 1: attenuator.png
attenuator.png
ELOG V3.1.3-