  14037   Wed Jul 4 20:48:32 2018 poojaUpdateCamerasMedm screen for GigE

(Gautam, Pooja)

Aim: To develop medm screen for GigE.

Gautam helped me set up the medm screen through which we can interact with the GigE camera. The steps adopted are as follows:

(i) Copied CUST_CAMERA.adl file from the location /opt/rtcds/userapps/release/cds/common/medm/ to /opt/rtcds/caltech/c1/medm/MISC/.

(ii) Made the following changes by opening CUST_CAMERA.adl in text editor.  

  • Changed the name of file to "/cvs/cds/rtcds/caltech/c1/medm/MISC/CUST_CAMERA.adl"
  • Replaced all occurences of "/ligo/apps/linux-x86_64/camera/bin/" to "/opt/rtcds/caltech/c1/scripts/GigE/SnapPy_pypylon/" & "/ligo/cds/$(site)/$(ifo)/camera/" to "/opt/rtcds/caltech/c1/scripts/GigE/SnapPy_pypylon/"

(iii) Added this .adl file as drop-out menu 'GigE' to VIDEO/LIGHTS section of sitemap (circled in Attachment 1) i.e opened Resource Palette of VIDEO/LIGHTS, clicked on Label/Name/Args & defined macros as CAMERA=C1:CAM-ETMX,CONFIG=C1-CAM-ETMX in Arguments box of Related Display Data dialog box (circled in Attachment 2) that appears. In Related Display Data dialog box, Display label is given as GigE and Display File as ./MISC/CUST_CAMERA.adl

(iv) All the channel names can be found in Jigyasa's elog https://nodus.ligo.caltech.edu:8081/40m/13023

(v) Since the slider (circled in Attachment 3) for pixel sum was not moving, changed the high limit value to 10000000 in PV Limits dialog box. This value is set such that the slider reaches the other end on setting the exposure time to maximum.

(vii) Set the Snapshot channel C1:CAM-ETMX_SNAP to off (very important!). Otherwise we cannot interact with the camera.

(vii) GigE camera gstreamer client is run in tmux session.

Now we can change the exposure time and record a video by specifying the filename and its location using medm screen. However, while recording the video, gstream video laucher of GigE stops or is stuck.

Attachment 1: sitemap.png
sitemap.png
Attachment 2: GigE_macros.png
GigE_macros.png
Attachment 3: CUST_CAMERA.png
CUST_CAMERA.png
  14038   Thu Jul 5 10:15:30 2018 gautamUpdateSUSPRM watchdog tripped

PRM watchdog was tripped around 7:15am PT today morning. I restored it.

Attachment 1: PRM_watchdogTrip.png
PRM_watchdogTrip.png
  14039   Thu Jul 5 17:33:36 2018 keerthana, sandrineUpdateelogLights not working
  • N/S ARM FL.
  • N/S ARM INC.

These two lights inside the 40m-lab are not working.

  14040   Thu Jul 5 17:58:04 2018 keerthana, sandrineUpdateelog 

(Analisa, Sandrine, Keerthana)

Today Annalisa helped us to understand the new set up used to make the frequency scans of the AUX laser. While tracking the cables it seemed that there were quite a lot of cables near the mixer. So we have reconnected one of the splitter which was splitting the RF out put signal from the Agilent and have placed it just near the Agilent itself. A picture of the changed setup is provided below. The splitter divides the signal into two components. One goes to the LO port of the mixer and the other goes to the R port of the Agilent. We have tried locking the PLL after the change and it works fine. We are trying to make a diagram of the setup now, which we will upload shortly.

 

Attachment 1: setup1.jpg
setup1.jpg
Attachment 2: setup2.jpg
setup2.jpg
  14045   Sun Jul 8 22:27:25 2018 keerthanaUpdate AUX diagram

(Analisa, Keerthana, Sandrine)

So far we tried four different techniques to scan the AUX laser. They are,

1. Scanning the marconi frequency to sweep the central frequency of the AUX laser.

2. Sweeping the side band frequency of the AUX laser by providing RF frequency from the spectrum analyser.

3. Double demodulation technique.

4. Single demodulation technique.

Now we are taking all the scan data with the help of Single demodulation technique.

Attachment 1: PLL-single_demodulation.pdf
PLL-single_demodulation.pdf
Attachment 2: PLL-double_demodulation.pdf
PLL-double_demodulation.pdf
  14046   Mon Jul 9 12:36:32 2018 poojaUpdateGeneralProjector light bulb blown out

Projector light bulb blown out today.

  14048   Tue Jul 10 14:20:09 2018 steveUpdateGeneralprojector light bulb replaced

Bulb replaced at day 110  We have now spare now.

 

  14051   Wed Jul 11 15:57:00 2018 aaronUpdateOMCReviving OMC electronics
Gautam showed me the electronics racks for the OMC PZTs and DAQ. I'm in the process of chasing down what channels we need, and confirming that we'll be able to plug the old antialiasing/imaging boards into the current DAC/ADC boards. I found what I think was Rob Ward's simlink model for the omc, located at
 
/cvs/cds/caltech/cds/rward-advLigo/src/epics/simLink/omc.mdl
 
Channels in this model:
  • 27 or 29 total ADC channels are used (depending whether we keep 2 spare adc chans)
    • 4 each go to ASC_QPD1/2 (8 chans total)
    • 5 go to TRANS_PD1, TRANS_PD2, REFL_PD, TRANS_PD1_UF, TRANS_PD2_UF. These PD are used for ASC and LSC.
    • 2 go to the LSC, one each for DVMDC, DVMAC, X3DC, and X4DC
    • 12 go to the ASC_PZT
    • 2 go to the SPARE_ADC (not sure what this is)
    • I think these channels are (or were at some point) defined in memory by /cvs/cds/caltech/chans/ipc/G1.ipc
      • I found this from elog 2860; it mentions that these should eventually be migrated over to a file C1.ipc, but I don't see any OMC channels in that file or any of the 'old' C1.ipc files, so I suppose it never happened or they were removed later
    • During this vent, we won't have ASC, so
  • 10 or 14 DAC channels are used (depending whether we keep 4 spare dac chans)
    • 2 from the LSC, one for CLK_OUT and one for "LSC"
    • 8 from ASC, including P1A, P1B, P2A, P2B, P1OSC, Y1OSC, P2OSC, Y2OSC
    • I think these channels are (or were at some point) saved to frames due to /cvs/cds/caltech/chans/daq/C1OMC.ini, which I found from elog 2073
    • At some point, the 33MHz mod depth was controlled by one of the spare OMC chans, C1:OMC-SPARE_DAC_CH_15. See elog 2126. I assume this is no longer the case, since c1omc is defunct.
    • Durnig this vent, we won't have ASC and don't need to CLK_OUT the LSC, so we may just need one DAC channel

As of at least Nov 2009, the .par file for the OMC was located at /cvs/cds/gds/param/tpchn_C2 (see elog 2316)

 
Electronics inventory:
  • Kepco HV supply, "OMC-L-PZT", labels indicate it goes to 250V, needs to be tested  ("TESTED OK 2014OCT12")
  • Tip/Tilt Piezo Driver, LIGO D060287
  • HV Piezo Driver, LIGO D060283
  • QPD Whitening Board, D060214
  • LIGO D050374/D050387
  • LIGO D050368/D050373

Need to check:

  • Can the ADC/DAC adapter boards (eg D0902006) drive whatever ~10V control signal we need across ~10m of SCSI cable?
  •  
  14052   Wed Jul 11 16:23:21 2018 aaronUpdateOMCCoordination of the Output Mode-cleaner Mirror Insertion Expedition (COMMIE)

I started this document on my own with notes as I was tracing the beam path through the output optics, as well as some notes as I started digging through the elogs. Let's just put it here instead....

  1. Beam from AS port into OMMT
  2. Reflect off OM5-PJ
    1. TO DO: check that the PZT works
    2. 40/P/F/L, 1525-45-P
  3. Pick off from OMPO
    1. TO DO: determine how much power is needed for the pick off, choose an appropriate optic (for this vent probably 50-50 is fine)
    2. The PO beam goes to OM6
  4. Reflect off MMT1???
    1. TO DO: determine if this mirror has a PZT, get it working
      1. Has a PZT?
      2. Which PZT channel on the DAQ?
      3. Is there a cable going to from the DAC to the PZT?
      4. Is the PZT functional?
      5. How many PZTs does this mirror actually have?
    2. TO DO: determine the real name of this optic, find its recent history in the elog
    3. TO DO: determine the correct telescope parameters to optimally couple into the mode cleaner given the following:
    4. TO DO: look up how the radius of curvature (RC) of the OMC has changed, and therefore what telescope parameters are necessary
  5. Focused by MMT2???
    1. TO DO: determine if this mirror has a PZT
      1. Has a PZT?
      2. Which PZT channel on the DAQ?
      3. Is there a cable going to from the DAC to the PZT?
      4. Is the PZT functional?
      5. How many PZTs does this mirror actually have?
    2. TO DO: determine the real name of this optic, find its recent history in the elog
    3. TO DO: what about this optic is tunable? It looks bulky
  6. Columnated by MMT3???
    1. TO DO: determine if this mirror has a PZT
      1. Has a PZT?
      2. Which PZT channel on the DAQ?
      3. Is there a cable going to from the DAC to the PZT?
      4. Is the PZT functional?
      5. How many PZTs does this mirror actually have?
  7. Steered by MMT4???
    1. TO DO: determine the real name of this optic
    2. TO DO: why is this optic so small? Looks different from the rest, maybe weird space constraint
  8. Steered by MMT5???
    1. TO DO: why is this optic so large compared to OMMT4?
    2. TO DO: is there a more space efficient way of steering this beam, or even some way that avoids having to steer with three distinct optics
  9. Steered by MMT6???
    1. TO DO: Can this optic be removed with some clever new beam path?
  10. Cleaned by the OMC
    1. TO DO: Where does the promptly reflected beam from OMC1 go after it exits the chamber?
    2. TO DO: check the PZTs
      1. Has a PZT?
      2. Which PZT channel on the DAQ?
      3. Is there a cable going to from the DAC to the PZT?
      4. Is the PZT functional?
      5. How many PZTs does the OMC actually have?
    3. TO DO: Determine if a new OMC configuration would be more ideal for the squeezing experiment
      1. This is a large task, not part of this immediate vent
    4. TO DO: What is done with the OMC reflection? What is done with the transmission?
    5. TO DO: Check the logs about how the OMC had been in use; should be mostly from rob ward
  11. Reflected beam goes to the next chamber
  12. Transmitted beam is split by OM7???
    1. TO DO: find the actual name of this optic
    2. TO DO: why does this have the R/T that is does?
  13. Reflected beam goes to my OMPD
    1. TO DO: figure out what this PD is used for, and whether we even need it
      1. I think this might be the camera mentioned in 40m elog 21
      2. Elog 42 says the 4 QPDs for the OMC have meds screens located under C2TPT—is this a clue for channel names?
  14. Transmitted beam is reflected to the next chamber by OM8???
    1. TO DO: determine the name of this optic
    2. TO DO: Where does this beam go? What is it used for?
  15. Beam Dumps to add
    1. Transmission through OM5? Probably don’t need…
    2. OMMT1 transmission
    3. OMMT steering mirror transmissions
    4. OMC transmissions? Probably not?
    5. OMPD transmission?
    6. OM8 transmission
    7. Green scattering off of the window where the beam goes after GR_SM5
    8. Backscatter from the OMC prompt reflection to the window
    9. Backscatter from the OMC reflection to the window
    10. Backscatter from the MC beam off the window (this beam just travels through this chamber, interacts with no optics; there is also what looks like a small blue beam on this diagram, so maybe need to dump that backscatter too)
    11. Backscatter from the PO beam from OM6 going through the chamber window
    12. Backscatter from IM1 out the window
    13. There is a small blue beam from OMMT3 that goes through this window as well, I’m not sure exactly what is is from or for, or if it is physical (there are a few of these strange blue lines, i'm probably just misreading the diagram)
  16. TESTS TO DO
    1. Characterize the PZT control
    2. Lock the OMC with a PZT dither lock
      1. Eg elog 59
    3. “Tap-tap-tappy-tap test” to find resonanes
      1. Look at combination of PDH error signal and DCPD signal???
      2. See elog 86 for results from initial OMC install—Nov 2007
    4. Check wiggling wires, etc
    5. TFs to check? Vertical TF?
    6. OMC Length check— see for eg elog 768
  17. ADDITIONAL TO DO
    1. Mode matching calculation for new radius of curvature optics—see elog 1271
      1. The current MMT is not the optimal configuration even for the old Rc (see 3077 and 3088)

 

Notes during reading elog

  • Entry 590 has a labelled picture of the optics setup with OMC
  • Mention of omcepics at elog 894
  • Some important changes happened in elog 1823
    • 1''->2'' mirror out of the vacuum--I should check whether this is still there, or if it has been moved
    • [many more changes.....]
  • There were at one time 2 cameras monitoring OMCT and R (see 4492, 4493)
  • Some OMC PZT HV supply info is at elog 4738, 4740... 
  • There are some photos of the OMC table at elog 5120, and a note about moving some optics
  • Not strictly about the OMC, but I really like Suresh's diagram 6756, I'll make something similar for the OMC electronics
    • although it is about adding the tip tilt electronics, which I think required a new flange for the OMC chamber
  • OMC stage 1 and 2 are the steering mirrors going into the OMC, and were controlled by EPICS chans (6875, 6884)
    • these PZT HV supplies lived in OMC_SOUTH (or maybe 1Y3? see elog 6893), the driver in OMC_NORTH (LIGO-D060287)
    • Photos of these supplies in 7696
  • There are pictures of the OMC and its PZTs in 7401
  • The OMC HV supply was moved to power a different set of PZTs (see 7603)
  • Talk of replacing the PZTs with picomotors or tip/tilts in 7684
  • More pictures of the OMC table before the OMC was 'removed' are here (8114) and in 12563/12571 Gautam links to a Picassa album with pictures from just before the beam was diverted
  14053   Wed Jul 11 16:50:34 2018 poojaUpdateCamerasUpdate in developing neural networks

Aim: To develop a neural network that resolves mirror motion from video.

I had created a python code to find the combination of hyperparameters that trains the neural network. The code (nn_hyperparam_opt.py) is present in the github repo. It's running in cluster since a few days. In the meanwhile I had just tried some combination of hyperparameters.

These give a low loss value of approximately 1e-5 but there is a large error bar for loss value since it fluctuates a lot even after 1500 epochs. This is unclear.

Input: 64*64 image frames of simulated video by applying beam motion sine wave of frequency 0.2Hz and at 10 frames per sec. This input data is given as an hdf5 file.

Train : 100 cycles,  Test: 300 cycles, Optimizer = Nadam (learning rate = 0.001)

Model topology:

                    256       ->      128    ->       1

Activation :        selu     selu           linear

Case 1: batch size = 48, epochs = 1000, loss function = mean squared error

Plots of output predicted by neural network (NN) & input signal has been shown in 1st graph & variation in loss value with epochs in 2nd graph.

Case 2: batch size = 32, epochs = 1500, loss function = mean squared logarithmic error

Plots of output predicted by neural network (NN) & input signal has been shown in 3rd graph & variation in loss value with epochs in 4th graph.

 

 

 

Attachment 1: graphs.pdf
graphs.pdf graphs.pdf graphs.pdf graphs.pdf
  14055   Thu Jul 12 11:13:39 2018 gautamUpdateGeneralOMC revival

Aaron and I are going to do the checkout of the OMC electronics outside vacuum today. At some point, we will also want to run a c1omc model to integrate with rtcds. Barring objections, I will set up this model on one of the spare cores on the physical machine c1ioo tomorrow.

  14056   Thu Jul 12 12:26:39 2018 aaronUpdateGeneralOMC revival

We found a diagram describing the DC Readout wiring scheme on the wiki page for DC readout (THIS DIAGRAM LIED TO US). The wiring scheme is in D060096 on the old DCC.

Following this scheme for the OMC PZT Driver, we measured the capacitance across pins 1 and 14 on the driver end of the cable nominally going to the PZT (so we measured the capacitance of the cable and PZT) at 0.5nF. Gautam thought this seemed a bit low, and indeed a back of the envelope calculation says that the cable capacitance is enough to explain this entire capacitance.

Gautam has gone in to open up the HV driver box and check that the pinout diagram was correct. We could identify the PZT from Gautam's photos from vent 79, but couldn't tell if the wires were connected, so this may be something to check during the vent.

UPDATE:

Turns out the output was pins 13 and 25, we measured the capacitance again and got 209nF, which makes a lot more sense.

  14057   Thu Jul 12 14:06:39 2018 keerthanaUpdateelogFinesse and Analytical solution - Comparison

I tried to compare the cavity scan data we get from the Finesse simulation and that we expect from the Analytical solution. The diagram of the cavity I defined in Finesse is given below along with the values of different quantities I used. For the analytical solution I have used two different equations and they are listed below.

Analytical 1 - Blue Graph

\phi = \frac {2.L.\Omega_1}{c}

t_{cav} = \frac{t_e. t_f \exp^{-i\frac{\phi}{2}}}{1- r_f. r_e \exp^{-i\phi} }

T_{cav} = \left|{t_{cav}} \right|^2

 

Analytical 2 - Red Graph

F = \frac {4. r_f.r_e}{(1-r_f.r_e )^2}

\phi = \frac {2.L.\Omega_1}{c}

T_{cav} = \left|{t_{cav}} \right|^2 = \frac {(t_e.t_f)^2}{(1 - r_f . r_e)^2} \frac{1}{1+F(\sin\frac {\phi}{2})^2}

The graph obtained from both these solutions completely matches with each other.

Finesse Solution

The cavity which I defined in Finesse is shown below. The solution from Finesse and the Analytical solution also matches with each other. Another plot is made by taking the difference between Finesse solution and Analytical solution. The difference seems to be of the order of \approx 10^{-19}.

The Difference plot is also attached below.

Attachment 1: finesse_cavity.png
finesse_cavity.png
Attachment 2: Analytical1.pdf
Analytical1.pdf
Attachment 3: Finesse_Analytical.pdf
Finesse_Analytical.pdf
Attachment 4: Difference.pdf
Difference.pdf
  14058   Thu Jul 12 15:15:47 2018 SandrineUpdate Beat Note Measurements for Cavity Scans

(Gautam, Sandrine)

We calculated the expected power of the beat note for Annalisa's Y arm cavity scans. 

Beat Note Measurement

We began by calculating the transmitted power of the PSL and AUX. We assumed that the input power of the PSL was 25 mW and the input power of the AUX was 250 uW. We also assumed a loss of 25 ppm for the ITM and ETM. We used T1 = 0.0138 and T2 = 25 x 10-6. 

P_{t} = \frac{t _{1}^{2}t_{2}^{2}}{1+r_{1}^{2}r_{2}^{2}-2r_{1}r_{2}}

t = \sqrt{T}          

r = \sqrt{1-T-L} = {\sqrt{R}}

The transmitted power of the PSL is approximately 100 uW, and the transmitted power of the AUX is approximately 0.974 uW. 

P_{t}^{PSL} = 100 uW                          P_{t}^{AUX} = 0.974 uW

The beat note was calculated with the following:

P_{beat} = 2\sqrt{P_{PSL}P_{AUX}} = 20 uW

The  expected beat note should be approximately 20 uW. 

  14059   Thu Jul 12 16:18:22 2018 SteveUpdateVACVent preparations

We are getting ready to vent.

 

Attachment 1: before_Vent.png
before_Vent.png
Attachment 2: before_Vent_cond.png
before_Vent_cond.png
  14060   Thu Jul 12 21:16:25 2018 aaronUpdateOMCChecking OMC Electronics

In preparation for tomorrow's vent, I'm checking some of the OMC-related electronics we plan to use.

First up is the HV Piezo Driver (D060283).

(well, technically the first up was the Kepco HV power supply... but I quickly tested that its output works up to 300V on a multimeter. The power supply for OMC-L-PZT is all good!)

According to the DCC, the nominal HV supply for this board is 200V; the board itself is printed with "+400V MAX", and the label on the HV supply says it was run at 250V. For now I'm applying 200V. I'm also supplying +-15V from a Tektronix supply.

I used two DB25 breakout boards to look at the pins for the DC and AC voltage monitors (OMC_Vmon_+/-, pins 1/6, and OMC_Vmon_AC+/-, pins 2 and 7) on a scope. I hooked up a DS345 function generator to the piezo drive inputn (pins 1,6). According to the 2013 diagram from the DCC, there is just one drive input, and an alternative "dither in" BNC that can override the DAC drive signal. I leave the alternative dither floating and am just talking to the DAC pins.

Aspects of the system seem to work. For example, I can apply a sine wave at the input, and watch on the AC monitor FFT as I shift the frequency. However, anything I do at DC seems to be filtered out. The DC output is always 150V (as long as 200V comes from the supply). I also notice that the sign of the DC mon is negative (when the Vmon_+ pin is kept high on the scope), even though when I measure the voltage directly with a multimeter the voltage has the expected (+) polarity.

A few things to try:

  • The DC_Readout electronics scheme on the wiki has separate oscillator and control inputs. This diagram has lied to us in the past and is older, and the traces on top of the breadboard seem to only go to pins 1 and 6, but I'm going to first try to apply a voltage across pins 2 and 7 in case there actually is a separate control I'm ignoring.
    • Driving on these pins seems to do nothing

On further investigation this was the key clue. I had the wrong DCC document, this is an old version of this board, the actual board we are using is version A1 of D060283-x0 (one of the "other files")

Gautam and Koji returned at this point and we started going through the testpoints of the board, before quickly realizing that the DC voltage wasn't making it to the board. Turns out the cable was a "NULL" cable, so indeed the AC wasn't passing. We swapped out the cable, and tested the circuit with 30V from the HV supply to trim the voltage reference at U14. The minimum voltage we could get is 5V, due to the voltage divider to ground made by R39. We confirmed that the board, powered with 200V, can drive a sine wave and the DC and AC mons behave as expected.

  14061   Thu Jul 12 23:59:14 2018 gautamUpdateGeneralVent objectives and prep

Vent objectives:

  1. Install radiative heater setup in EY chamber.
  2. Re-direct 50% of AS beam to OMC
    • First, we need to check if the OMC trans PDs work. Else, we have to consider using some in-air PDs for the transmon.
    • Check that OMC length PZT works.
    • Check that OMC steering PZTs work (Koji and I have used this in 2016 to check AS beam clipping so they should work).

We only anticipate opening up the IOO chamber and the EY chamber.


Vent preparation: see here.

  14063   Fri Jul 13 02:52:11 2018 gautamUpdateGeneralVent objectives and prep

[KA, GV]

  1. Arm scan setup moved from West side of PSL table to North side of AP table
    • Marconi is now providing the LO for the loop. A ~5m 50ohm BNC cable needs to be laid out from the PLL area to the NW corner of the AP table where the Agilent is for the TF measurement scheme which allows phase discrimination.
    • We took this opportunity to characterize/improve the setup a bit, and also clean up the 10s of cables around the PSL table. There were some Video cables (75ohm instead of 50ohm no) that were part of the scanning setup which we excised.
    • Mode matching onto beat PD on PSL table was improved - beat signal Vpp increased by factor of 2. PLL gain was adjusted accordingly. 
    • AUX power @AP table ~37mW (before recombination BS), ~3.7mW onto SRM, ~200uW onto ITMY.
    • We got a beatnote in transmission of ~120uV (rms?) after optimizing alignment into Y arm cavity with the AUX frequency on an arm FSR.
    • From Sandrine's calculations, I expected ~20mV of beat signal. We leave it to Annalisa and Terra to square that circle. Probably the MM into the arm isn't stellar either, and we didn't check the polarization of the aux beam (that it is matched to the IFO's p-pol).
    • The entire AUX injection chain needs careful characterization before
  2. Vent prep
    • Both arms were locked to IR, TRY maximized using ASS, TRX maximized by hand.
    • GTRY and GTRX were also maximized.
    • All test mass/PRM/SRM oplevs were centered with this "good" alignment.
    • PSL power into the IMC was cut from 1.07 W (measured after G&H mirror) to 97 mW, by rotating the waveplate immediately after the PSL (original angle 180deg, new angle 216 degrees).
    • PMC was locked. I did not need to change any of the gain settings.
    • 2" R=10% BS in the IMC REFL path was replaced with a Y2, so there is no MCREFL till we turn the power back up.
    • IMC was locked. I touched up my IMC low power autolocker, but this probably needs a bit more touching up tomorrow. MC has remained locked at low power for ~25mins, but as I typed this, I jinxed it and it lost the lock. anyway we have good alignment references.
    • PSL shutter will remain closed.

@SV, we are ready to vent tomorrow. Aaron is supposed to show up ~830am to assist.

Attachment 1: preVentStatus.png
preVentStatus.png
  14064   Fri Jul 13 10:54:55 2018 aaronUpdateVACVent 80

[aaron, steve]

Steve gave me a venting tutorial. I'll record this in probably a bit more detail than is strictly necessary, so I can keep track of some of the minor details for future reference.

Here is Steve's checklist:

  • Check that all jam nuts are tightened
  • all viewports are closed
  • op levs are off
  • take a picture of the MEDM screens
  • Check particle counts
  • Check that the cranes work & wiped
  • Check that HV is off

Gautam already did the pre-vent checks, and Steve took a screenshot of the IFO alignment, IMC alignment, master op lev screen, suspension condition, and shutter status to get a reference point. We later added the TT_CONTROL screen. Steve turned off all op levs.

We then went inside to do the mechanical checks

  • N2 cylinders in the 40m antechamber are all full enough (have ~700psi/day of nitrogen)
  • We manually record the particle count
    • this should be <10,000 on the 0.5um particles to be low enough to vent, otherwise we will contaminate the system
    • note: need to multiply the reading on the particle counter by 10 to get the true count
    • the temperature inside the PSL enclosure should be 23-24C +/- 3 degrees
    • We recorded the particle counts at ~830 and ~930, and the 0.5um count was up to ~3000
  • We put a beam stop in front of the laser at the PSL table
  • Checked that all HV supplies are either off or supplying something in air
    • we noticed four HV supplies on 1X1 that were on. Two were accounted for on the PSL table (FSS), and the other two were for C1IOO_ASC but ran along the upper cable rack. We got ahold of Gautam (sorry!) and he told us these go to the TT driver on OMC_SOUTH, where we verified the HV cables are disconnected. We took this to mean these HV supplies are not powering anything, and proceeded without turning these HV off.
    • There are HV supplies which were all either off or supplying something in-air at: 1Y4, 1Y2, OMC N rack, 1X9 (green steering HV)
  • Checked that the crane works--both move up and down
    • vertex crane switch is on the wall at the inner corner of the IFO
    • y arm crane switch is on the N wall at the Y end
    • turn off the cranes at the control strip after verifying they work
  • While walking around checking HV, we checked that the jam nuts and viewports are all closed
    • we replaced one viewport at the x arm that was open for a camera

After completing these checks, we grabbed a nitrogen cylinder and hooked it up to the VV1 filter. Steve gave me a rundown of how the vacuum system works. For my own memory, the oil pumps which provide the first level of roughing backstream below 500mtorr, so we typically turn on the turbo pumps (TP) below that level... just in case there is a calibrated leak to keep the pressure above 350mtorr at the oil pumps. TP2 has broken, so during this vent we'll install a manual valve so we can narrow the aperture that TP1 sees at V1 so we can hand off to the turbo at 500mtorr without overwhelming it. When the turbos have the pressure low enough, we open the mag lev pump. Close V1 if things screw up to protect the IFO. This 6" id manual gatevalve will allow us throttle the load on the small turbo while the maglev is taking over the pumping  The missmatch in pumping speed is 390/70 l/s [ maglev/varian D70 ]  We need to close down the conductive intake of the TP1 with manual gate valve so the 6x smaller turbo does not get overloaded...

We checked CC1, which read 7.2utorr.

Open the medm c0/ce/VacControl_BAK.adl to control the valves.

Steve tells me we are starting from vacuum normal state, but that some things are broken so it doesn't exactly match the state as described. In particular, VA6 is 'moving' because it has been disconnected and permanently closed to avoid pumping on the annulus. During this v ent, we will also keep pumping on the RGA since it is a short vent; steve logged the RGA yesterday.

We began the vent by following the vacuum normal to chamber open procedure.

  1. VM1 closed
  2. We didn't open VM3, because we want to keep the RGA on
  3. Closed V1
  4. Connect the N2 to the VV1 filter
    1. first puged the line with nitrogen
    2. We confirmed visually that V1 is closed
  5. We opened VM2 to pump on the RGA with the mag lev pump.
    1. This is a nonstandard step because we are keeping the RGA pumped down.
    2. The current on TP3 is ~0.19A, which is a normal, low load on the pump
  6. VV1 opened to begin the vent at ~10:30am
    1. use crescent wrench to open, torque wrench wheel to close
    2. Keep the pressure regulator below 10 psi for the vent. We started the vent with about 2psi, then increased to 8psi after confirming that the SUS sensors looked OK.
  7. We checked the pressure plot and ITMX/ETMX motion to make sure we weren't venting too quickly or kicking the optics
    1. Should look at eg C1:SUS-ITMX_SENSOR_LL, as well as C1:Vac-P1_pressure
  8. Once the pressure reaches 25torr, we switched over to dry air
    1. wipe off the outside dolly wheels with a wet rag, and exit through the x-arm door to get the air. Sweep off the area outside the door, and wipe off new air containers with the rag.
    2. Bring the cylinder inside, get the regulator ready/purged, and swap relatively quickly.
    3. We increased the vent speed to 10psi. 
    4. Steve says the vents typically take 4 of 300 cf cylinders from Airgas "Ultra Zero" AI  UZ300 that contains 0.1 PPM of THC

Everything looks good, so I'm monitoring the vent and swapping out cylinders.

At 12:08pm, the pressure was at 257 torr and I swapped out in a new cylinder.

Steve: Do not overpressurize the vacuum envelope! Stop around 720 Torr and let lab air do the rest. Our bellows are thin walled for seismic isolation.

Attachment 1: vent80wtiptilts.png
vent80wtiptilts.png
  14066   Fri Jul 13 16:26:52 2018 SteveUpdateVACVent 80 is completing...

Steve and Aaron,

6 hrs vent is reaching equlibrium to room air. It took 3 and a half instrument grade air cilynders [ AI UZ300 as labelled ] at 10 psi pressure. Average vent speed ~ 2 Torr/min

Valve configuration: IFO at atm and RGA is pumped through VM2 by TP1 maglev.

 

Attachment 1: @atm.png
@atm.png
Attachment 2: vent80_7h.png
vent80_7h.png
Attachment 3: ventregN2&Air_c.jpg
ventregN2&Air_c.jpg
  14067   Fri Jul 13 17:13:45 2018 KojiUpdateGeneralVent objectives and prep

Notice: I removed these 75Ohm video cables.

Attachment 1: P_20180713_020603.jpg
P_20180713_020603.jpg
  14068   Fri Jul 13 18:01:13 2018 gautamUpdateGeneralLow power MC

After getting the go ahead from Steve, I removed the physical beam block on the PSL table, sent the beam into the IFO, and re-aligned the MC to lock at low power. I've also revived my low power autolocker (running on megatron), seems to work okay though the gains may not be optimal, but it seems to do the job for now. Nominal transmission when well aligned at low power is ~1200cts. I briefly checked Y arm alignment with the green, seems okay, but didn't try locking the Y arm yet. All doors are still on, and I'm closing the PSL shutter again while Keerthana and Sandrine are working near the AS table.

  14070   Fri Jul 13 23:23:49 2018 poojaUpdateCamerasUpdate in developing neural networks

Aim: To develop a neural network that resolves mirror motion from video.

I tried to reduce the overfitting problem in previous neural network by reducing the number of nodes and layers and by varying the learning rate, beta factors (exponential decay rates of moving first and second moments) of Nadam optimizer assuming error of 5% is reasonable.

Input:

32 * 32 image frames (converted to 1d array & pixel values of 0 to 255 normalized) of simulated video by applying sine signal to move beam spot in pitch with frequency 0.2Hz and at 10 frames per second.

Total: 300 cycles ,           Train: 60 cycles,    Validation: 90 cycles,    Test: 150 cycles

Model topology:

                                          Input               -->                  Hidden layer               -->                    Output layer                                  

                                                                                          4 nodes                                              1 node

Activation function:                                  selu                                             linear

Batch size = 32, Number of epochs = 128, loss function = mean squared error

Optimizer: Nadam

Case 1:

Learning rate = 0.00001,    beta_1 = 0.8 (default value in Keras = 0.9),  beta_2 = 0.85 (default value in Keras = 0.999)

Plot of predicted output by neural network, applied input signal & residual error given in 1st attachment.

Case 2:

Changed number of nodes in hidden layer from 4 to 8. All other parameters same.

These plots show that when residual error increases basically the output of neural network has a smaller amplitude compared to the applied signal. This kind of training error is unclear to me.

When beta parameters of optimizer is changed farther from 1, error increases.

Attachment 1: nn_simulation_2_nodes4_lr0p00001_beta1_0p8_beta2_0p85.pdf
nn_simulation_2_nodes4_lr0p00001_beta1_0p8_beta2_0p85.pdf
Attachment 2: nn_simulation_2_nodes8_lr0p00001_beta1_0p8_beta2_0p85.pdf
nn_simulation_2_nodes8_lr0p00001_beta1_0p8_beta2_0p85.pdf
  14072   Sat Jul 14 16:04:34 2018 aaronUpdateOMCChecking OMC Electronics

Next check is the DCPD/OMMT Satellite Box

I traced a cable from the OMC electrical feedthrough flanges to find the DCPD/OMMT Satellite Box (D060105). I couldn't find the DCC number or mention of the box anywhere except this old elog.

Gautam and I supplied the box with power and tested what we think is the bias for the PD, but don't read any bias... we tracked down the problem to a suspicious cable, labelled.

We confirmed that the board supplies the +5V bias that Rich told us we should supply to the PDs.

We tested the TFs for the board from the PD input pins to output pins with a 100kHz low pass (attached, sorry no phase plots). The TFs look flat as expected. The unfiltered outputs of the board appear bandpassed; we couldn't identify why this was from the circuit diagram but didn't worry too much about it, as we can plan to use the low passed outputs.

Attachment 1: Screenshot_2018-07-14_17.53.40.png
Screenshot_2018-07-14_17.53.40.png
Attachment 2: Screenshot_2018-07-14_17.57.17.png
Screenshot_2018-07-14_17.57.17.png
  14074   Mon Jul 16 18:12:00 2018 KojiUpdateVACAdding a manual gate valve between TP1 and V1/VM2

[Steve Koji]

We are in the process of adding a manual gate valve between TP1 (Osaka Maglev) and the other gate valves (I suppose V1 and VM2).
The work is still on going and we will continue to work on this tomorrow. Because this section is isolated from the main volume, this work does not hold off the possible rough pumping tomorrow morning.

The motivation of this work is as follows:
- Since TP2 failed, the main vacuum volume has been pumped down by TP1 and TP3. However TP3 is not capable to handle the large pressure difference at the early stage of the turbo pumping. This cause TP3 to have excessive heating or even thermal shutdown.
- The remedy is to put a gate valve between TPs and the main vacuum to limit the amount of gas flowing into the TPs. This indeed slows down the pumping speed of turbo, but this is not the dominant part of the pumping time.

Actual work:
- Comfirmed TP1 is isolated.
- Unscrewed the flange of TP1.
- Remove TP1. This required to lift up TP1 with some shim as the nuts interferes with the TP1 body. (Attachment1, 2, 3)
- Now remove 10inch flange adapter. (Attachment4)
-
Attach 10"-8" adapter and 8" rotational sleeve. (Attachment5)

Attachment 1: P_20180716_155413.jpg
P_20180716_155413.jpg
Attachment 2: P_20180716_155645.jpg
P_20180716_155645.jpg
Attachment 3: P_20180716_155738.jpg
P_20180716_155738.jpg
Attachment 4: P_20180716_162307.jpg
P_20180716_162307.jpg
Attachment 5: P_20180716_172000.jpg
P_20180716_172000.jpg
  14075   Tue Jul 17 01:07:40 2018 gautamUpdateSUSETMY EQ stops

For the heater setup on EY table, I EQ-stopped ETMY. Only the face EQ stops (3 on HR face, 2 on AR face) were engaged. The EY Oplev HeNe was also shutdown during this procedure. 

  14076   Tue Jul 17 12:46:28 2018 ranaUpdateGeneralsome notes from yesterday

For the EY, instead of balancing the table, I just moved the weight approximately so that the ETMY OSEMS were at half light, but didn't check the level since ETMY is the only optic.

 

Some notes on OMC/AS work (Aaron/Gautam can amend/correct):

- Beam is now well centered in OMC MMT. Hits input coupling mirror and cleanly exits the vacuum to the AS table.

- Didn't see much on OMC trans, but PDs are good based on flashlight test.

- just before closing, re-aligned beam in yaw so that it gets close to the east screw on the input coupler. Aaron and I think we maybe saw a flash there with the OMC length PZT being driven at full range by a triangle wave.

- with OMC Undulators (aka tip/tilt PZT mirrors) energized, the beam was low on PZT1 mirror. We pitched ITMY by ~150 micro-rad and that centered the beam on PZT1 mirror. ITMY-OL is probably not better than 100 urad as a DC reference?

- We checked the range of Undulator 1 and we were getting ~5 mrad of yaw of the beam for the full range, and perhaps half of that in pitch. Rob Ward emailed us from Oz to say that the range is robably 2.7 mrad, so that checks out.

Even if the ITMY has to be in the wrong position to get the beam to the OMC, we can still do the heater tests in one position and then do the OMC checkout stuff in the other position.

Gautam suspects that there is a possible hysterical behaviour in the Undulators which is related to the MC3 glitching and the slow machine hangups and also possibly the illuminati.

[aaron]

-We noticed a ghost beam that from MC REFL (MMT2) that should be dumped during the next vent--it travels parallel to the OMC's long axis and nearly hits one of the steering mirrors for OMC refl.

-We measured the level of the table and found it ~3 divisions off from level, with the south end tilted up

-Gautam rotated and slightly translated OM5 to realign the optic, as expected. No additional optics were added.

-Gautam and I tested the TT piezo driver. We found that 3.6V on the driver's input gave 75V (of 150V) at the output, at least for yaw on piezo 1. However, as Gautam mentioned, during testing it seemed that the other outputs may have different (nonzero) offset voltages, or some hysterisis.

  14081   Wed Jul 18 03:14:48 2018 AnnalisaUpdateGeneralVent 80 recovery

[Gautam, Johannes, Koji, Annalisa]

Tonight we increased the power of the PSL laser and we achieved the lock of both arms with high power.

The AUX beam alignment to the Y arm was recovered and the PLL restored (using the Marconi as LO).

We made a quick measurement of the phase noise and the results will be posted tomorrow.

The beam on the PSL has been blocked, as well as the AUX beam on the AS table. The Marconi has been switched off.


gautam:

  1. Before turning up PSL power, I placed a block in front of MC refl to avoid any PD burning. Replaced HR Y1 2" optic with the usual 10% reflective BS to direct MC REFL to the locking PD.
  2. Waveplate was rotated back to 180 deg (original position before the vent). After optimizing PMC transmission, I measured 1.05 W going into the IMC (pre-vent value was 1.07 W, prolly within power meter absolute accuracy).
  3. IMC autolocker restored to usual high power version on megatron.
  4. There seems to be some kind of vacuum interlock in effect that prevents me from opening the PSL shutter via EPICS - I had to toggle the position on the shutter controller under the table. After tonight's work, I returned the controller to the NC state, to avoid any further interference with this interlock code that may prevent pumping in the AM.
  5. PLL gain was re-adjusted to achieve maximum stability (judged by eye) of the beat-note in lock triggered on the Marconi LO signal. Alignment onto the NF beatPD was also tweaked to squeeze out as much beat as possible.
  6. The main objective tonight was to send AUX beam in, recover transmission beat, scan the AUX frequency, and resolve some peaks (MAX HOLD scanning technique, magnitude only for now, no phase info). Thanks to JE's expert fiber alignment and beatnote maximization, we achieved this yes. Annalisa will post a plot tmr. 
  7. For unknown reasons, the Y arm ASS does not maximize TRY. So we are in the unfortunate situation of neither arm having a working ASS servo. To be worked on later.
  14084   Wed Jul 18 23:43:50 2018 KojiUpdateGeneralVent 80 recovery

Is the reflector too close to the beam and causing clipping?

Quote:

For unknown reasons, the Y arm ASS does not maximize TRY. So we are in the unfortunate situation of neither arm having a working ASS servo. To be worked on later.

Attachment 1: IMG_5868.JPG
IMG_5868.JPG
Attachment 2: IMG_5382.JPG
IMG_5382.JPG
  14089   Thu Jul 19 18:09:17 2018 poojaUpdateCamerasUpdate in developing neural networks

Aim: To develop a neural network that resolves mirror motion from video.

Case 1:

Input : Simulated video of beam spot motion in pitch by applying 4 sine  waves of frquencies 0.2, 0.4, 0.1, 0.3 Hz  and amplitude ratios to frame size to be 0.1, 0.04, 0.05, 0.08

The data has been split into train, validation and test datasets and I tried training on neural network with the same model topology & parameters as in my previous elog (https://nodus.ligo.caltech.edu:8081/40m/14070)

The output of NN and residual error have been shown in Attachment 1. This NN model gives a large error for this. So I think we have to increase the number of nodes and learning rate so that we get a lower error value with a single sine wave simulated video ( but not overfitting) and then try training on linear combination of sine waves.

Case 2 :

Normalized the target sine signal of NN so that it ranges from -1 to 1 and then trained on the same neural network as in my previous elog with simulated video created using single sine wave. This gave comparatively lower error (shown in Attachment 2). But if we train using this network, we can get only the frequency of test mass motion but we can't resolve the amount by which test mass moves. So I'm unclear about whether we can use this.

Attachment 1: nn_simulation_mlt_sine_nodes4_lr0p00001_beta1_0p8_beta2_0p85_marked.pdf
nn_simulation_mlt_sine_nodes4_lr0p00001_beta1_0p8_beta2_0p85_marked.pdf
Attachment 2: nn_simulation_2_nodes4_target-1to1_marked.pdf
nn_simulation_2_nodes4_target-1to1_marked.pdf
  14092   Fri Jul 20 22:51:28 2018 KojiUpdateIOOIMC WFS path alignment

IMC WFS tuning

- IMC was aligned manually to have maximum output and also spot at the center of the end QPD.
- The IMC WFS spots were aligned to be the center of the WFS QPDs.
- With the good alignment, WFS RF offset and MC2 QPD offsets were tuned via the scripts.

  14093   Fri Jul 20 22:53:15 2018 KojiUpdateASSAttempt to resurrect Yarm ASS

[Koji Gautam]

We managed to realize stable ASS configuration for Yarm. The transmission of 1.06~1.07 was recovered by introducing intentional beam spot offset in the horizontal direction towards the opposite side of the elliptic reflector. The end table optics were adjusted to have the spots about the center of the mirrors, lenses, and PDs/QPDs.


Preparation

- The Y arm was manually aligned with a given input axis. The transmission was ~0.8.
- Then, TT2 was moved in yaw such that it introduced the horizontal beam shift at the end. By moving the spot to the opposite side of the reflector. The transmission ~0.95 was obtained after patient alignment work.

- Went to the end table and checked the spots. The beam was not at the center of the last 1" lens for the Trans PDs. The beam steering was adjusted to have the spot nicely going through the lens and the mirrors. This made the transmission level to be ~1.05.

- The beam centering on the Trans PD was checked and adjusted.
- The beam centering on the RF BBPD for the arm scan was checked. The spot was too big for that PD. The lens was slightly moved away from the PD to make the spot on the BBPD small. Now the PD saw the plateu when the steering was scanned (i.e. the spot is small enough).

- With the Y arm locked with MC2, the servo gain needs to be 0.012 instead of nominal 0.015 with ETMY to prevent from servo oscilating.

ASS tuning

- First of all, only the bottom 4 loops out of total 8 loops were tuned. They are the servos for the beam alignment with regard to the caivty. The linearity and the zero crossings were checked with regard to the reference alignment. All of these 4 showed offsets that causes the servo running away. Don't know the reason of this offset, but it is freq dependent. Therefore the dither freqs were tuned to make the offset zeroed, and tuned the demod phases there. This kept the transmission as high as the reference (~1.05)

- This allowed us to play with the spot position a bit by tuning the caivty alignment. In the end, the transmission of ~1.08 was obtained. Using this alignment, A2L offset for ETMY Yaw was determined to be +17 (to make the error signal -17). This offset produces almost a beam radius (5mm) shifted on the end mirror towards the opposite direction of the reflector.

- The nominal servo setting made the spot servo running away. Gautam pointed out that this could be a gain hierarchy problem (i.e. the spot servos are too fast). We ended up reducing the gain of the servo from 1.0 to 0.3 to make the spot servo stable.

- All the ASS setting was stored in a new snap file "script/ASS/ASS-DITEHR_ON.snap". The previous snap was saved to "script/ASS/ASS_DITHER_ON_preVent201807.snap". This did not save the exc gains of the oscillators. Therefore "DITHER_ASS_ON.py" was modified to have the new exc gains (CLKGAIN). The old values are stored in the comments in this script.


Overall this is not an ideal situation as we don't know what is the actually cause of the offsets in the dither error signals. We expect to correct the beam clipping and the suspension sooner or later. Therefore, we will come back to the ASS again once the other issues are corrected.

Attachment 1: 02.png
02.png
  14095   Sat Jul 21 01:14:02 2018 gautamUpdateOMCPZT Jena driver board check

[Aaron, gautam]

We did a quick check of this board today. Main takeaways:

  • There are two voltages (HV pos and HV neg) that are output from this unit.
  • Presumably, these goto different piezoelectric elements, referenced to ground. Are there any spec sheets for these describing the geometry/threshold voltages?
  • The outputs are:
    • \mathrm{HV_{+}} = 10(V_{\mathrm{DAC}}+V_{\mathrm{offset}}), \mathrm{HV_{-}} = 10(-V_{\mathrm{DAC}}+V_{\mathrm{offset}})
    • So with V_{\mathrm{offset}} = 7.5 \mathrm{V}, we expect to be able to use +/- 7.5 V of DAC range.
  • The trim pot had to be adjusted to realize V_{\mathrm{offset}} = 7.5 \mathrm{V}​.
  • I assume 150V is some kind of damage threshold of the PZT, so there is no benefit to using 10V offset voltage (as this would result in 200 V at full range DAC voltages).

With the correct V_{\mathrm{offset}} = 7.5 \mathrm{V}, we expect 0V from the DAC to result in 0 actuation on the mirror, assuming that an equal 75V goes to 2 PZTs mounted diametrically opposite on the optic. Hopefully, this means we have sufficient range to scan the input pointing into the OMC and get some sort of signal in the REFL signal (while length PZT is being scanned) which indicates a resonance. 

We plan to carve out some IFO time for this work next week.

  14097   Sun Jul 22 14:01:07 2018 poojaUpdateCamerasDeveloping neural networks on simulated video

Aim: To develop a neural network that resolves mirror motion from video.

Since error was high for the same input as in my previous elog http://nodus.ligo.caltech.edu:8080/40m/14089

I modified the network topology by tuning the number of nodes, layers and learning rate so that the model fitted the sum of 4 sine waves efficiently, saved weights of the final epoch and then in a different program, loaded saved weights & tested on simulated video that's produced by moving beam spot from the centre of image by sum of 4 sine waves whose frequencies and amplitudes change with time.

Input : Simulated video of beam spot motion in pitch by applying 4 sine  waves of frquencies 0.2, 0.4, 0.1, 0.3 Hz  and amplitude ratios to frame size to be 0.1, 0.04, 0.05, 0.08. This is divided into train (0.4), validation (0.1) and test (0.5).

Model topology:

                                          Input               -->                  Hidden layer               -->                    Output layer                                  

                                                                                          8 nodes                                              1 node

Activation function:                                  selu                                             linear

Batch size = 32, Number of epochs = 128, loss function = mean squared error

Optimizer: Nadam ( learning rate = 0.00001, beta_1 = 0.8, beta_2 = 0.85)

Normalized the target sine signal of NN by dividing by its maximum value.

Plot of predicted output by neural network, applied input signal & residual error given in 1st attachment. These weights of the model in the final epoch have been saved to h5 file and then loaded & tested with simulated data of 4 sine waves with amplitudes and frequencies changing with time from their initial values by random uniform noise ranging from 0 to 0.05. Plot of predicted output by neural network, target signal of sine waves & residual error given in 2nd attachment. The actual signal can be got from predicted output of NN by multiplication with normalization constant used before. However, even though network fits training  & validation sets efficiently, it gives a comparatively large error on test data of varying amplitude & frequency.

Gautam suggested to try training on this noisy data of varying amplitudes and frequencies. The results using the same model of NN is given in Attachment 3. It was found that tuning the number of nodes, layers or learning rate didn't improve fitting much in this case.

 

 

Attachment 1: nn_simulation_2_normalized_mult_sin_nodes8_128epochs_lr0p00001_beta1_0p8_beta2_0p85_0p4train_0p1valid_marked.pdf
nn_simulation_2_normalized_mult_sin_nodes8_128epochs_lr0p00001_beta1_0p8_beta2_0p85_0p4train_0p1valid_marked.pdf
Attachment 2: nn_simulation_normalizedtarget_128epochs_mult_sin_load_wt_varyingtest_nodes8_lr0p00001_beta1_0p8_beta2_0p85_0p4train_0p1valid_marked.pdf
nn_simulation_normalizedtarget_128epochs_mult_sin_load_wt_varyingtest_nodes8_lr0p00001_beta1_0p8_beta2_0p85_0p4train_0p1valid_marked.pdf
Attachment 3: nn_simulation_2_normalized_varying_mult_sin_nodes8_128epochs_lr0p00001_beta1_0p8_beta2_0p85_0p4train_0p1valid_marked.pdf
nn_simulation_2_normalized_varying_mult_sin_nodes8_128epochs_lr0p00001_beta1_0p8_beta2_0p85_0p4train_0p1valid_marked.pdf
  14100   Tue Jul 24 06:11:50 2018 ranaUpdateCamerasDeveloping neural networks on simulated video

This looks like good progress. Instead of fixed sines or random noise, you should generate now a time series for the motion which is random noise but with a power spectrum similar to what we see for the ETM pitch motion in lock. You can use inverse FFT to get the time series from the open loop OL spectra (being careful about edge effects).

Quote:

Aim: To develop a neural network that resolves mirror motion from video.

  14101   Tue Jul 24 09:47:51 2018 gautamUpdateCamerasDeveloping neural networks on simulated video

I was thinking a little more about the way we are training the network for the current topology - because the network has no recurrent layers, I guess it has no memory of past samples, and so it doesn't have any sense of the temporal axis. In fact, Keras by default shuffles the training data you give it randomly so the time ordering is lost. So the training amounts to requiring the network to identify the center of the Gaussian beam and output that. So in the training dataset, all we need is good (spatial) coverage of the area in which the spot is most likely to move? Or is the idea to develop some tools to generate video with spot motion close to that on the ETM in lock, so that we can use it with a network topology that has memory? 

Quote:

This looks like good progress. Instead of fixed sines or random noise, you should generate now a time series for the motion which is random noise but with a power spectrum similar to what we see for the ETM pitch motion in lock. You can use inverse FFT to get the time series from the open loop OL spectra (being careful about edge effects)

  14105   Thu Jul 26 01:52:01 2018 terraUpdateThermal Compensationheater work update

Just a quick update: over the past few days we've taken (at least) 5 scans around each peak [carrier - HOM3] at 9.4V/0.8A, 4 scans around [carrier - HOM5] at 12V/0.9A hot state with the reflector setup. We also have (at least) 5 scans of carrier - HOM5 in cold state. I attach a rough overview of the peak magnitude shifts in the first attachment. Analysis ongoing. All data stored in annalisa/postVent/{date}

Initial shifts just based on rought peak placement in the meantime:

            [9.4V/0.8A]   [12V/0.9A]

HOM1    10 kHz         20 kHz

HOM2    18 kHz         28 kHz

HOM3     30 kHz        40 kHz

HOM4     N/A             26 kHz

HOM5     N/A             35 kHz

I also attach the heating thermal transient from today (12V/0.9A) as seen by the opLevs. We see a shorter time constant for pitch, longer for yaw, preceeded by a dip in yaw. Similar behavior yesterday for slightly less heating, though less pronounced pre-dip. The heater is offcentered on the optic horizontally; likely this is part of the induced yaw. The spikey stuff i removed is from people walking around inside during the transient.

I've left the heater and LSC off for the night. Heater off at 2:07 am local time.

Please don't touch the oplevs; we're taking a cool down measurement.

Attachment 1: OpLev_thermal_drift.pdf
OpLev_thermal_drift.pdf
Attachment 2: hotColdAll.pdf
hotColdAll.pdf
  14106   Thu Jul 26 15:11:18 2018 SteveUpdateGeneral Viewports & coating of 2001

New optical quality BK-7 windows in 2001 [4 substrates ] AR coated R<0.75 % for 630-1064nm " Azury BLue" broadband : TRX, TRY, ITMY-Oplev &  ITMX-Oplev viewports.

The BS-Oplev and PRM-Oplev 10" CF with 5.38" diameter view was coated the same way. The window here is Corning 7056 Borosilicate

5 more BK-7 substrates were coated R <0.1% of 1064 nm "Golden Orange" Their location: IMC-IN, IFO-REF and OMC   The next vent we have to confirm optical quality window locations.

All other conflat flange viewports are 7056 Kovar sealed .

Technical notes of 2001 40m upgrade can be seen at LIGO-T010115- 00- R  ....page 14

Attachment 1: BK7window_Coatings.PDF
BK7window_Coatings.PDF BK7window_Coatings.PDF
  14107   Fri Jul 27 02:30:51 2018 gautamUpdateGeneralGlitchy MC

Kevin and I saw some weird IMC / PEM BLRMS behaviour today - see Attached screenshot. Not sure what was happening with the IMC, but MCtrans was oscillating at ~3Hz for a good 20 minutes or so. I just killed the lock, and restarted MCautolocker on megatron. There was a strange feature in the 3-10Hz BLRMS around that time as well. All seems back to normal now...

Attachment 1: 38.png
38.png
  14108   Fri Jul 27 10:48:57 2018 SteveUpdateSUSBS oplev window

Yesterday I inspected this BS oplev viewport. The heavy connector tube was shorting to table so It was moved back towards the chamber. The connection is air tight with kapton tape temporarly.

 The beam paths are well centered. The viewport is dusty on the inside.

The motivation was to improve the oplev noise.

Attachment 1: BSOw_.jpg
BSOw_.jpg
Attachment 2: dustInsideBSO.jpg
dustInsideBSO.jpg
  14109   Fri Jul 27 17:16:14 2018 SandrineUpdateThermal CompensationCopied working scripts for mode spectroscopy into new directory (modeSpec)

The scripts: AGfast.py, make HDF5.py, plotSpec_marconi.py, and SandrineFitv3.py were copied into the new directory modeSpec.

The path is: /opt/rtcds/caltech/c1/scripts/modeSpec

These scripts can still be found under Annalisa's directory under postVent.

  14111   Sat Jul 28 22:16:49 2018 John MartynUpdate Characterization of Transimpedance Amplifier

Kevin and I meaured the transfer function of the photodiode circuit using the Jenne laser and agilent in the 40m lab. The attached figures depict our measured transfer function over the modulation frequency ranges of 30kHz-30MHz and 1kHz-30MHz when the power of the laser was set to 69 and 95 μW. These plots indicate a clear roll off frequency around 300 kHz. In addition, the plots beginning at 1kHz display unstable behavior at frequencies below 30kHz. I am not sure why there is such a sharp change in the transfer function around 30kHz, but I suspect this to be due to an issue with the agilent or photodiode. 

Attachment 1: PD_TF1.pdf
PD_TF1.pdf
Attachment 2: PD_TF2.pdf
PD_TF2.pdf
Attachment 3: PD_and_TIA_Transfer_Function_Measurements.zip
  14112   Sun Jul 29 00:59:54 2018 KojiUpdateElectronicsCharacterization of Transimpedance Amplifier

You have this measurement problem when the IF bandwidth is larger than the measurement frequency. I suspect the IF bandwidth is 30kHz.

  14113   Sun Jul 29 20:03:02 2018 ranaUpdatePEMSeismometer temp control

While Shruti is re-building Kira's heater circuit, I looked up how to do one of these (i.e. what does a real EE say about how to build a current source?):

It turns out that there is an Analog Devices application note (AN-968) about this (as there usually is once we get tired of playing around and try to look up the right answer).

I've linked to the note and attached the recommended schematic for high current applications. We'll go ahead as is, but we'll make a PCB according to this App Note for the v3 circuit.

 

Attachment 1: Screen_Shot_2018-07-29_at_8.00.27_PM.png
Screen_Shot_2018-07-29_at_8.00.27_PM.png
  14114   Sun Jul 29 23:15:34 2018 poojaUpdateCamerasDeveloping CNN

Aim: To develop a convolutional neural network that resolves mirror motion from video.

Input : Previous simulated video of beam spot motion in pitch by applying 4 sine  waves of frquencies 0.2, 0.4, 0.1, 0.3 Hz  and amplitude ratios to frame size to be 0.1, 0.04, 0.05, 0.08 where random uniform noise ranging 0.05 has been added to amplitudes and frequencies. This is divided into train (0.4), validation (0.1) and test (0.5).

Model topology:

  • Number of filters = 2
  • Kernel size = 2
  • Size of pooling windows = 2
  •                                        ----->         Dense layer of 4 nodes  ---->    Output layer of 1 node 

         Activation:                      selu                                                  linear

Batch size = 32, Number of epochs = 128, loss function = mean squared error

Optimizer: Nadam ( learning rate = 0.00001, beta_1 = 0.8, beta_2 = 0.85)

Plots of CNN output & applied signal given in Attachment 1. The variation in loss value with epochs given in Attachment 2.

This needs to be further analysed with increasing random uniform noise over the pixels and by training CNN on simulated data of varying ampltides and frequencies for sine waves.

Attachment 1: conv_nn_varying_freq_amp_1.pdf
conv_nn_varying_freq_amp_1.pdf
Attachment 2: conv_nn_varying_freq_amp_2.pdf
conv_nn_varying_freq_amp_2.pdf
  14115   Mon Jul 30 11:05:44 2018 gautamUpdateSUSIFO SUS wonky

When I came in this morning:

  • PMC was unlocked.
  • Seis BLRMS were off scale.
  • ITMX OSEM LEDs were dark on the CRT monitor even though Sat Box was plugged in.

Checking status of slow machines, it looked like c1sus, c1aux, and c1iscaux needed reboots, which I did. Still PMC would not lock. So I did a burtrestore, and then PMC was locked. But there seemed to be waaaaay to much motion of MCREFL, so I checked the suspension. The shadow sensor EPICS channels are reporting ~10,000 cts, while they used to be ~1000cts. No unusual red flags on the CDS side. Everything looked nominal when I briefly came in at 6:30pm PT yesterday, not sure if anything was done with the IFO last night.

Pending further investigation, I'm leaving all watchdogs shutdown and the PSL shutter closed.

A quick look at the Sorensens in 1X6 revealed that the +/- 20V DC power supplies were current overloaded (see Attachment #1). So I set those two units to zero until we figure out what's going on. Possibly something is shorted inside the ITMX satellite box and a fuse is blown somewhere. I'll look into it more once Steve is back.

Attachment 1: IMG_7102.JPG
IMG_7102.JPG
  14117   Mon Jul 30 16:11:54 2018 gautamUpdateSUSTrillium interface box is broken

[koji, steve, gautam]

We debugged this in the following way:

  1. Disconnect all fuses in the terminal blocks coming from the +/- 20 VDC Sorensens.
  2. Check that they are indeed isolated using DMM.
  3. Test blocks of fuses in order to identify where the problem is happening (i.e. plug fuses in, turn up Sorensen voltage knobs, look for current overload). We did things in the following order:
    • MC suspensions
    • BS, PRM and SRM
    • ITMY
    • ITMX
    • Trillium interface box.
  4. Turns out that the Trillium box is the culprit.
  5. Confirmed that the problem is in the trillium interface box and not in the seismometer itself by unplugging all cables leading out of the interface box, and checking that the problem persists when the box is powered on.

So for now, the power cable to the box is disconnected on the back end. We have to pull it out and debug it at some point.

Apart from this, megatron was un-sshable so I had to hard reboot it, and restart the MCautolocker, FSSslowPy and nds2 processes on it. I also restarted the modbusIOC processes for the PSL channels on c1auxex (for which the physical Acromag units sit in 1X5 and hence were affected by our work), mainly so that the FSS_RMTEMP channel worked again. Now, IMC autolocker is working fine, arms are locked (we can recover TRX and TRY~1.0), and everything seems to be back to a nominal state. Phew.

  14118   Mon Jul 30 18:19:03 2018 KojiUpdateSUSTrillium interface box was fixed and reinstalled

The trillium interface box was removed from the rack.

The problem was the incorrect use of an under-spec TVS (Transient Voltage Suppression) diodes (~ semiconductor fuse) for the protection circuit.
The TVS diodes we had had the breakdown voltages lower than the supplied voltages of +/-20V. This over-voltage eventually caused the catastrophic breakdown of one of the diodes.

I don't find any particular reason to have these diodes during the laboratory use of the interface. Therefore, I've removed the TVS diodes and left them unreplaced. The circuit was tested on the bench and returned to the rack. All the cables are hooked up, and now the BRLMs look as usual.


Details

- The board version was found to be D1000749-v2

- There was an obvious sign of burning or thermal history around the components D17 and D14. The solder of the D17 was so brittle that just a finger touch was enough to remove the component.

- These D components are TVS diodes (Transient Voltage Suppression Diodes) manufactured by Littelfuse Inc. It is sort of a surge/overvoltage protector to protect rest of the circuit to be exposed to excess voltage. The specified component for D17/D14 was 5.0SMMDJ20A with reverse standoff voltage (~operating voltage) of 20V and the breakdown voltage of 22.20V(min)~24.50V(max). However, the spec sheet told that the marking of the proper component must be "5BEW" rather than "DEM," which is visible on the component. Some search revealed that the used component was SMDJ15A, which has the breakdown voltage of 16.70V~18.50V. This spec is way too low compared to the supplied voltage of +/-20V.

Attachment 1: P_20180730_173134.jpg
P_20180730_173134.jpg
Attachment 2: P_20180730_180151.jpg
P_20180730_180151.jpg
  14119   Tue Jul 31 08:17:55 2018 SteveUpdateSUSTrillium interface box was fixed,reinstalled & working

 

 

Attachment 1: all_OK.png
all_OK.png
  14120   Tue Jul 31 22:50:18 2018 aaronUpdateOMCOMC Expected Refl Signal

I learned a lot about lasers this week from Siegman. Here are some plots that show the expected reflectivity off of the OMC for various mode matching cases.

The main equation to know is 11.29 in Siegman, the total reflection coefficient going into the cavity:

R=r-\frac{t^2}{r}\frac{g(\omega)}{1-g(\omega)}

Where r is the mirror reflectivity (assumed all mirrors have the same reflectivity), t is the transmissivity, and g is the complex round-trip gain, eq 11.18

g(\omega)=r_1r_2(r_3...)e^{-i\phi}e^{-\alpha_0p}

The second exponential is the loss; in Siegman the \alpha_0 is some absorption coecfficient and p is the total round trip length, so the product is just the total loss in a round trip, which I take to be 4*the loss on a single optic (50ppm each). \phi is the total round trip phase accumulation, which is 2\pi*detuning(Hz)/FSR. The parameters for the cavity can be found on the wiki.

I've added the ipynb to my personal git, but I can put it elsewhere if there is somewhere more appropriate. I think this is all OK, but let me know if something is not quite right.

Attachment 1: omcRefl.pdf
omcRefl.pdf
ELOG V3.1.3-