  12010   Thu Feb 25 11:02:36 2016 SteveUpdateGeneralPower Glitch again
Quote:

Chiara reports an uptime of >195 days, so its UPS is working fine yes

FB, megatron, optimus booted via front panel button.

Jetstor RAID array (where the frames live) was beeping, since its UPS failed as well. The beep was silenced by clicking on "View Events/Mute Beeper" at 192.168.113.119 in a browser on a martian computer. I've started a data consistency check via the web interface, as well. According to the log, this was last done in July 2015, and took ~19 hrs.

Frontends powered up; models don't start automatically at boot anymore, so I ran rtcds start all on each of them. 

All frontends except c1ioo had a very wrong datetime, so I ran sudo ntpdate -b -s -u pool.ntp.org on all of them, and restarted the models (just updating the time isn't enough). There is an /etc/ntp.conf in the frontend filesystem that points to nodus, which is set up as an NTP server, but I guess this isn't working.

PMC locking was hindered by sticky sliders. I burtrestored the c1psl.snap from Friday, and the PMC locked up fine. (One may be fooled by the unchanged HV mon when moving the offset slider into thinking the HV KEPCO power supplies need to be brought down and up again, but it's just the sliders)

Mode cleaner manually locked and somewhat aligned. Based on my memory of PMC camera/transmission, the pointing changed; the WFS need a round of MC alignment and WFS offset setting, but the current state is fine for operation without all that. 

10:15 power glitch today. ETMX Lightwave and air conditions turned back on

Attachment 1: powerGlitch.png
powerGlitch.png
  12015   Wed Mar 2 10:09:28 2016 SteveUpdatesafetyprofessional crane inspection

The crane inspection is scheduled for this coming Friday from 8-12

 

  12018   Thu Mar 3 10:19:20 2016 SteveUpdatesafetysafety audit 2016

Bob cleaned the safety glasses. They were sonicated in warm 2% Liquinox  water for 10 minutes.  Steve checked them by transmission measurement of 1064 nm at 150 mW

 

Attachment 1: checkedSG.jpg
checkedSG.jpg
  12020   Fri Mar 4 11:07:10 2016 SteveUpdatesafety crane inspection completes 2016 safey audit

All 3 cranes inspected by professional and load tested with 450 lbs at max reach.

 

Attachment 1: craneInsp2016.jpg
craneInsp2016.jpg
  12031   Fri Mar 11 16:52:53 2016 SteveUpdatePEMleaky roof

Johannes found dripping water at the vac rack. It is safe. It is not catching anything. Actual precipitation was only 0.62"

Attachment 1: leakyRoof.jpg
leakyRoof.jpg
Attachment 2: leakyRoofA.jpg
leakyRoofA.jpg
  12035   Tue Mar 15 10:31:58 2016 SteveUpdateIOOLaser is turned back on

It's may be the janitor's doing.

I noticed that the HEPA filers were off. They are turned on at 20%
 

Attachment 1: 2WlaserOff-On.png
2WlaserOff-On.png
  12036   Wed Mar 16 15:36:03 2016 SteveUpdateSUSwire standoff test cut

Ruby wire standoff 1 mm od. with V-groove test cut. SOS sus wire 0.0017" od. is in the background.
 

Attachment 1: 0182_-_20160316_135935.png
0182_-_20160316_135935.png
  12038   Fri Mar 18 11:04:56 2016 SteveUpdateSUSinverted pendulum

Kate Dooley picked up this item today.

Attachment 1: invPeng.jpg
invPeng.jpg
  12039   Mon Mar 21 10:07:45 2016 SteveUpdateSUSETMX enclosure update

The enclosure top piece in the middle is still in the machine shop.

The carpenter who helps in the built just left for one week vacation.

The unit will be ready  on April 1

I'd prefer doing the installation with the enclosure on the new table.

It's the only way to minimize the resonances of the enclosure with shimming.

Attachment 1: ETMXenclosure.jpg
ETMXenclosure.jpg
  12040   Mon Mar 21 14:29:32 2016 SteveUpdateCalibration-Repair1W Innolight laser repair diagnoses

 

Quote:
Quote:

After adjusting the alignment of the two beams onto the PD, I managed to recover a stronger beatnote of ~ -10dBm. I managed to take some measurements with the PLL locked, and will put up a more detailed post later in the evening. I turned the IMC autolocker off, turned the 11MHz Marconi output off, and closed the PSL shutter for the duration of my work, but have reverted these to their nominal state now. The are a few extra cables running from the PSL table to the area near the IOO rack where I was doing the measurements from, I've left these as is for now in case I need to take some more data later in the evening...I

Innolight 1W 1064nm, sn 1634 was purchased in 9-18-2006 at CIT. It came to the 40m around 2010

It's diodes should be replaced, based on it's age and performance.

RIN and noise eater bad. I will get a quote on this job.

The Innolight Manual frequency noise plot is the same as Lightwave' elog 11956

Diagnoses from Glasglow:

“So far we have analyzed the laser. The pump diode is degraded. Next we would replace it with a new diode. We would realign the diode output beam into the laser crystal. We check all the relevant laser parameters over the whole tuning range. Parameters include single direction operation of the ring resonator, single frequency operation, beam profile and others. If one of them is out of spec, then we would take actions accordingly. We would also monitor the output power stability over one night. Then we repackage and ship the laser.”

  12041   Tue Mar 22 14:12:18 2016 SteveUpdateIOOLaser is turned back on

The 2W Innolight was turned on.

 

Attachment 1: off-onAgain.png
off-onAgain.png
  12043   Wed Mar 23 11:55:47 2016 SteveUpdateGeneral Smart UPS 2200 Battery Replaced

Batteries replaced in control room UPS after 3 years from replaceUPSbattery.com

 

 

  12044   Wed Mar 23 15:23:12 2016 SteveSummaryPEMGuralps as connected

We have one calibration sheet of GUR- B, from 26 June 2008,    model CMG-T40-0008,  sn T4157       at  ETMY  east,  interface box input 1

I'm looking for calibration paper of GUR- A,                                model CMG-T40-0053,  sn T4Q17      at ETMX   south, interface box input 2

Quote:

I measured the guralp raw outputs and the TFs using the handheld unit and an FFT analyzer.

[Setup]

The handheld unit was connected to each guralp with the same cable which is confirmed t be functional with the Yend Guralp.

The signal for Z, N, and E directions are obtained from the banana connectors on the handheld unit. Each direction has mass, low gain velocity, and high gain velocity output. The PSDs of the signals were measured with an FFT analyzer. The transfer function from the mass signal to the low/high gain signals were also measured for each direction.

The adjustment screw for the E output of the Xend does not work. I had to tilt the Xend Guralp using the leg screws to bring the E signal to zero.

[Result]

Attachment 1: Raw voltage PSD for all outputs
Attachment 2: Comparison of the low gain vel outputs

- All of the mass output show similar PSDs.
- Low gain velocity outputs shows somewhat similar levels. I still need to check if the output is really the ground velocity or not.
- High gain velocity outputs are either not high gain, broken, or not implemented.

- We need to calibrate the low gain output using signal injection, huddle test, or something else.

Attachment 3: TFs between each mass output and the low or high gain outputs

- TFs between the mass signal and the low vel signals show the similar transfer functions between the channels.
- The high gain outputs show low or no transfer function with regard to the mass signals.
 

 

Attachment 1: GUR_A.jpg
GUR_A.jpg
Attachment 2: GUR_B.jpg
GUR_B.jpg
Attachment 3: GUR_Interface_Box.jpg
GUR_Interface_Box.jpg
  12045   Thu Mar 24 07:56:09 2016 SteveUpdateCalibration-RepairNO Noise Eater for 1W Innolight

1W Innolight is NOT getting Noise Eater as it was decided yesterday at the 40m meeting. Corrected 3-25-2016

Repair quote with adding noise eater is in 40m wiki

Quote:

 

Quote:
Quote:

After adjusting the alignment of the two beams onto the PD, I managed to recover a stronger beatnote of ~ -10dBm. I managed to take some measurements with the PLL locked, and will put up a more detailed post later in the evening. I turned the IMC autolocker off, turned the 11MHz Marconi output off, and closed the PSL shutter for the duration of my work, but have reverted these to their nominal state now. The are a few extra cables running from the PSL table to the area near the IOO rack where I was doing the measurements from, I've left these as is for now in case I need to take some more data later in the evening...I

Innolight 1W 1064nm, sn 1634 was purchased in 9-18-2006 at CIT. It came to the 40m around 2010

It's diodes should be replaced, based on it's age and performance.

RIN and noise eater bad. I will get a quote on this job.

The Innolight Manual frequency noise plot is the same as Lightwave' elog 11956

Diagnoses from Glasglow:

“So far we have analyzed the laser. The pump diode is degraded. Next we would replace it with a new diode. We would realign the diode output beam into the laser crystal. We check all the relevant laser parameters over the whole tuning range. Parameters include single direction operation of the ring resonator, single frequency operation, beam profile and others. If one of them is out of spec, then we would take actions accordingly. We would also monitor the output power stability over one night. Then we repackage and ship the laser.”

 

  12046   Thu Mar 24 08:20:52 2016 SteveUpdatePEMGuralp-A calibration sheet

Calibration Data

All Guralp instruments and digitisers are provided with calibration documentation. Should you require a copy of calibration information for any product, email caldoc@guralp.com with the serial number of the product in the subject field and calibration information will be sent to you through email.

See data in the 40m wiki

 

  12050   Mon Mar 28 08:30:09 2016 SteveUpdateSUSPRM damping restored

Recent  EQ 4.8 mag San Felipe, Mexico trips PRM sus damping.

PRM damping restored. PMC locked.

Attachment 1: shaking.png
shaking.png
  12051   Mon Mar 28 10:43:18 2016 SteveUpdateendtable upgradeETMX 4'x2' optical table pictures

 

 

Attachment 1: ETMX4x2Layout.jpg
ETMX4x2Layout.jpg
Attachment 2: ETMX_4x2.JPG
ETMX_4x2.JPG
Attachment 3: ETMXopt_4x2.JPG
ETMXopt_4x2.JPG
  12057   Thu Mar 31 09:38:41 2016 SteveUpdateendtable upgradeY end 4x3 existing layout

Beam colors: 1064 nm red, 514 nm green and 633 nm yellow.

There should be room for lens in front of the pd at red3 and a mirror for alignment in the new layout.

This picture may help you how to improve the new ETMX 4' x 3' optical layout.

 

Attachment 1: ETMY4x3layout.jpg
ETMY4x3layout.jpg
  12062   Tue Apr 5 08:55:51 2016 SteveUpdateSUSlocal EQ 3.1m

Local earth quake 3.1 magnitude in Valencia, Ca did not trip our suspensions.

 

Attachment 1: eq3.1Valencia.png
eq3.1Valencia.png
  12067   Thu Apr 7 14:30:58 2016 SteveUpdateendtable upgradeETMX table height

 

Quote:

Steve has finished installing the enclosure on the new endtable. So Eric and I decided to try and lock the X arm and measure the beam height of the transmitted IR beam relative to the endtable. We initially thought of using POX DC as a the LSC trigger but this did not work as there was no significant change in it when the arm was flashing. Eric then tried misaligning the ITM and using AS110 as a trigger - this worked. We then recompiled the ASS model to take AS110 as an input, and ran the dither alignment. After doing so, I measured the beam height at two points on the new endtable.

Bottom line:

  • The beam is roughly level across the table (along the North-South direction, within the precision to which I could place the irides and measure the height). The table has also been levelled pretty well...
  • The beam height is ~4.7" across the endtable

So the beam is about 0.7" higher relative to the endtable than we'd like it to be. What do we do about this?

  • Is it even possible to raise the table by 0.7" so we can have a level beam everywhere? Are there some constraints related to how the enclosure is attached to the window?
  • Are we okay with tolerating a solution where we keep the beam level at 4", and use Y10 and Y11 (see layout in elog 12060) to raise the beam by 0.7", and then have slightly higher posts for the optics downstream of this point?

I've also placed two irides extending the cavity axis on the endtable. These should be helpful in aligning the green to the arm eventually.

The new TMC 4' x 3' x4" optical table and enclosure is installed - aligned- leveled.

Atm2,  Picture is taken ~42" from the window at 3.75 camera height. The leveled table height is wthin 1/4 at the center of the window.

I think this is close enough to move on with the installation of the optics.

We can raise the loaded table in the future if it is needed.

Atm4, Optical table height to floor 33" at the south west corner

Atm3, Enclosure top cover transmission at 1064 nm, 1mm beam size, power level 157 mW, 0 degree incident angle,   T 1.3% Metal shield is required above 100 mW hitting the wall of the enclosure!

Atm5, window to enclosure Kapton seal

Attachment 1: ETMXbrs.png
ETMXbrs.png
Attachment 2: ETMX.jpg
ETMX.jpg
Attachment 3: IMG_0618.JPG
IMG_0618.JPG
Attachment 4: ETMX.jpg
ETMX.jpg
Attachment 5: ETMXwc.jpg
ETMXwc.jpg
  12068   Fri Apr 8 09:13:20 2016 SteveUpdateendtable upgradeETMX-T beam height

X arm resonating after alignment, beam height on ETMX optical table ~4.75"

 

Attachment 1: ETMXalignedT.png
ETMXalignedT.png
Attachment 2: ETMXF.jpg
ETMXF.jpg
  12070   Mon Apr 11 17:03:41 2016 SteveUpdateCalibration-Repair1W Innolight repair completed

The laser is back. Test report is in the 40m wiki as New Pump Diode Mephisto 1000

It will go on the PSL table.

  12071   Tue Apr 12 09:14:57 2016 SteveUpdateSUSRuby wire - v - groove cut pictures

The ruby wire standoff V groove cuts are looking good.

I will request free sample of  sapphire prizm where one side would have SOS's R cylindrical surface.

The present plan to have the v-groove on this prism.

 

Attachment 1: Sapphire_prism_wire_standoff.JPG
Sapphire_prism_wire_standoff.JPG
  12074   Wed Apr 13 11:00:28 2016 SteveUpdateendtable upgradeX endtable repopulation

ETMX optical table is grounded to ETMX chamber through 1 Mohms

The doubling oven temp controller is installed to reach its cable.

 

  12082   Tue Apr 19 10:58:53 2016 SteveUpdatesafetysafety scans at PSL & tables

The PSL had one 1064 nm beam to be blocked around the north east side. The end enclosures are fine.

 

 

  12084   Wed Apr 20 14:36:45 2016 SteveUpdatePEMdusty lab

It is worth wiping table top covers. Use isopropanol soaked lint free wipes.

 

Attachment 1: AP_accm.jpg
AP_accm.jpg
Attachment 2: wiped_AP.jpg
wiped_AP.jpg
Attachment 3: temp-partic_6months.png
temp-partic_6months.png
Attachment 4: 3_years_PEM.png
3_years_PEM.png
  12086   Thu Apr 21 15:12:38 2016 SteveUpdateVACRGA is not working

 

Quote:

Steve pointed out that in the aftermath of the Nitrogen running out a couple of times last week, the RGA had shut itself off thinking that there was a leak and so it was not performing the scheduled scans once a day. So the data files from the scheduled scans were empty in the /opt/rtcds/caltech/c1/scripts/RGA/logs directory. The wiki page for getting it up and running again is up-to-date, but the script RGAset.py did not exist on the c0rga machine, which the RGA is communicating with via serial port. I copied over the script RGAset.py from rossa to c0rga and ran the script on that machine - but the error flags it returned were not all 0 (indicating some error according to the manual) - so I edited the script to send just the initialize command ('IN0') and commented out the other commands, after which I got error flags which were all 0. After this, I ran a manual scan using 'RGAlogger.py', and it appears that the RGA is now able to take scans again - I'm attaching a plot of the scan results. We've saved this scan as a reference to compare against after a few days. 

Our last RGA scan is from February 14, 2016  We had a power outage on the 15th

Gautom has not succeded  reseting it. The old c0rga computer looks dead. Q may resurrect it, if he can?

  12087   Fri Apr 22 13:58:13 2016 SteveUpdatePEMleaky roof is fixed

Dan sealed the leak today.

 

Attachment 1: leakyRoof_(2).jpg
leakyRoof_(2).jpg
  12088   Mon Apr 25 11:07:06 2016 SteveUpdateSUSspare SOS tower

Earth quake stops need viton tips.

Wirestandoffs are still aluminum.

Attachment 1: ETMXreplacment.jpg
ETMXreplacment.jpg
  12089   Tue Apr 26 15:22:35 2016 SteveUpdateendtable upgradeCleaning ETMX vacuum dirty window

Gautom is progressing with the layout nicely. The X-arm transmission window have not seen cleaning for decades. This should be the time to do it. Here is picture of dirtiness.

It is not that simple... How much effort should we put in it? The hole table with 1W inno laser plus... set up now about ~500 lbs  We can pull it off carefully, but it is not risk free.

We should look at our other signal port windows! Gautom's long reach able him to do the first contact cleaning without moving anything. It is great!
 

Attachment 1: ETMX-Tvp.jpg
ETMX-Tvp.jpg
Attachment 2: ETMX-TvpDetail.jpg
ETMX-TvpDetail.jpg
  12091   Wed Apr 27 09:05:10 2016 SteveUpdateGeneralAP viewport

                   Sad situation

    The anti-symmetric port

spider webs fly in the wind

Attachment 1: APg.jpg
APg.jpg
Attachment 2: AP.jpg
AP.jpg
Attachment 3: APspiderWebs.jpg
APspiderWebs.jpg
  12094   Wed Apr 27 15:04:47 2016 SteveUpdateendtable upgradeCleaning ETMX vacuum dirty window

It looks very promising.

 

Attachment 1: 1cETMX-Tcmp.jpg
1cETMX-Tcmp.jpg
  12096   Thu Apr 28 08:49:47 2016 SteveUpdatePEMpossible noise sources schedule

Building:         Campus (see attached Map)        

       

Date:              Manhole 1 - May 3 through May 5

Manhole 2 – May 6 through May 10

 Manhole 2 - May 16 through May 19

Manhole 3 – May 11 through May 19           

          

Time:              Noise:  7:00 a.m. To 5:00 p.m.

                  Access: 24 Hours a day

           

Interruption:      Noise/Vehicular & Pedestrian Access

                  Storm Drain Manholes

         

*In order to repair 3 manholes associated with a large storm drain that runs north-south through the campus, work will take place at the

3 manholes shown on the map. This work will interrupt vehicular and pedestrian access on the paths adjacent to the manholes. Though the work at Manholes 1 and 2 will allow vehicular and pedestrian access around the manholes, the work at Manhole 3 will completely block the driveway running south from the southeast corner of Parking Lot 11. Noise will also be created by the repair

 

 

Attachment 1: Campus_B&W_Map-2.pdf
Campus_B&W_Map-2.pdf
  12117   Sun May 15 19:48:08 2016 SteveUpdateVACrun out of N2

3-4 hrs ago we run out of nitrogen. We are back to Vacuum Normal

 

 

Attachment 1: noN2.png
noN2.png
  12119   Tue May 17 14:46:51 2016 SteveUpdateVACRGA scan at day 595

We have good RGA scan now. There was no scan for 3 months.

Attachment 1: RGAscan595d.png
RGAscan595d.png
Attachment 2: pd78-560Hz-d600.png
pd78-560Hz-d600.png
  12122   Thu May 19 16:29:20 2016 SteveUpdateendtable upgradeOptical layout almost complete

 

 

Attachment 1: ETMX_4x3_closed.jpg
ETMX_4x3_closed.jpg
Attachment 2: sealedETMXenclosure.jpg
sealedETMXenclosure.jpg
  12133   Wed May 25 08:32:55 2016 SteveUpdateSUSlocal EQ 3.5m

Local EQ 3.5 mag  at 2:28 UTC May 24, 2016 Rancho Cucamonga, Ca.....no damage

 

Attachment 1: 3.5Cucam.png
3.5Cucam.png
Attachment 2: local3.5cucam.png
local3.5cucam.png
  12134   Wed May 25 11:51:40 2016 SteveUpdatesafetySURF 2016 safety
Quote:

Hello, I am Varun Kelkar. I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control system signals. This week I will mostly be working on implementing basic DSP C-code offline. Currently I am trying to write a code for noise whitening.

-Varun

Varun has received 40m specific basic safety training today.

  12141   Tue May 31 16:52:58 2016 SteveUpdatesafetyNONO

Please do not place anything on the top of the cabinets that is not tied down. It will end up on our head in an earth quake.

 

Attachment 1: nono.jpg
nono.jpg
  12142   Wed Jun 1 09:06:38 2016 SteveUpdateLSCNew stands for TransMon/Oplev QPDs

Machined from I-beam 6061 T6 Aluminum 5" x 0.5 x 3.25

Quote:

As we realized during the EX table switch, the transmitted beam height from the arm is not exactly 4" relative to the endtable, it is more like 4.75" at the X-end (yet to be investigated at the Y-end). As a result, the present configuration involves the steering optics immediately before the Oplev and TransMon QPDs sending the beam downwards at about 5 degrees. Although this isn't an extremely large angle, we would like to have things more level. For this purpose, Steve has ordered some Aluminium I-beams (1/2 " thick) which we can cut to size as we require. The idea is to have the QPD enclosures mounted on these beams and then clamped to the table. One concern was electrical isolation - but Steve thinks Delrin washers between the QPD enclosure and the mount will suffice. We will move ahead with getting these machined once I investigate the situation at the Y end as well.. The I beams should be here sometime next week...

Atm2, version 2 "pdstand" will allow you to clamp from any direction ( Koji was right )

Attachment 1: pdIb.PDF
pdIb.PDF pdIb.PDF
Attachment 2: pdstand.pdf
pdstand.pdf
  12144   Wed Jun 1 15:01:56 2016 SteveUpdateSUS wire standoffs update

There are some issues with 5 mm sapphire prism Atm5. It will cause  interference between one of the prisms and the Side OSEM.

Here are some drawings to see the issues with larger wire standoff.

The 2 mm prism will work.with a 1 mm longer dumbell.

Quotes requested from http://photomachining.com/laser-micromachining-photomachining-contact.html and http://www.optocity.com/ 

 

 

Attachment 1: 06011603.PDF
06011603.PDF
Attachment 2: 06011602.PDF
06011602.PDF
Attachment 3: sapphire_stand_off_v2.pdf
sapphire_stand_off_v2.pdf
Attachment 4: side_OSEM_ETMY.jpg
side_OSEM_ETMY.jpg
Attachment 5: 5p2wsf.png
5p2wsf.png
  12149   Fri Jun 3 14:24:13 2016 SteveUpdateSUSlocal EQ 3.1 m

Local EQ 3.1 mag at Jun 2, 2016 11:06:16 PM UTC, Muscoy CA........no damage

Our STS should seen this shake.

 

Attachment 1: eq3.1mMuscoyCa.png
eq3.1mMuscoyCa.png
  12157   Wed Jun 8 10:20:14 2016 SteveUpdatesafetySURF 2016 safety

Aakash Patil received 40m specific basic safety training.

Quote:
Quote:

Hello, I am Varun Kelkar. I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control system signals. This week I will mostly be working on implementing basic DSP C-code offline. Currently I am trying to write a code for noise whitening.

-Varun

Varun has received 40m specific basic safety training today.

 

  12165   Fri Jun 10 09:52:51 2016 SteveUpdateSUS EQ 5.2 mag Borego Spring

EQ  5.2 mag at Jun 10, 8:04 am UTC, Borego Spring, CA  ~150 mi away.........no obvoius damage, damping restored, MC is locking, arms are flashing

 

Attachment 1: 5.2mBoregoSpring.png
5.2mBoregoSpring.png
Attachment 2: eqBSs.png
eqBSs.png
  12170   Mon Jun 13 09:08:17 2016 SteveUpdatePSLPMC slow drift

The PMC transmission slow degration or it's input beam is not stable.

 

Attachment 1: PMCslowDrift.png
PMCslowDrift.png
  12171   Mon Jun 13 10:01:58 2016 SteveUpdateSUSETMX jumps

 

Quote:

ETMX has been jumping around again lately. Just now, I zeroed the ETMX alignment offsets in the SUS model, and centered the ETMX oplev spot via slow machine sliders. OSEM damping is on, oplev damping is off. Let's see how it moves around in the next day or so. 

GPS: 1149635923 

UTC: Jun 10 2016 23:18:26

 

Attachment 1: noDamping24hrs.png
noDamping24hrs.png
Attachment 2: ETMXjumps.png
ETMXjumps.png
  12174   Tue Jun 14 10:13:34 2016 SteveUpdateVACtemporary N2 supply line

The drill room floor will be retiled Thursday, June 16. Temporary nitrogen line set up will allow emptying the hole area.

 

Ifo room entry will be through control room.

 

Attachment 1: afterN2work.png
afterN2work.png
  12182   Wed Jun 15 10:19:10 2016 SteveConfigurationCDSGPS antennas... debugging

Visual inspection of rooftop GPS antennae:

The 2 GPS antennas are located on the north west corner of CES roof. Their condition looks well weathered. I'd be surprised if they work.

The BNC connector of the 1553 head is inside of the conduit so it is more likely to have a better connection than the other one.

I have not had a chance to look into the "GPS Time Server" unit.

Attachment 1: GPStimeServer.jpg
GPStimeServer.jpg
Attachment 2: GPSsn.jpg
GPSsn.jpg
Attachment 3: GPSantennas.jpg
GPSantennas.jpg
Attachment 4: GPSantHead.jpg
GPSantHead.jpg
Attachment 5: GPSantHead2.jpg
GPSantHead2.jpg
Attachment 6: GPSantCabels.jpg
GPSantCabels.jpg
  12186   Thu Jun 16 08:52:14 2016 SteveUpdateGeneralilluminators turned off

PSL, BS, ITMY and ETMX the illuminators were left on over night.

  12187   Thu Jun 16 11:10:17 2016 SteveUpdateSUSspare ETMX optics preparation to be hanged

D Location

Number on

Drawing

 

Component

Name

 

 Baked Clean

 Pieces Needed

 

Pieces

In Stock

(on tower )

Notes
         
31,20,19,13 viton tips   not cut yet baked material in stock
30 6-32x0.75" stops 4 (4)  
29 steel music wire 0.017" not baked on roll  needs good wipes
28  1/4 "washer 4 (4)  
27 lock washer 4 50 install
26 Ag plated 1/4-20x1.25 4 (4)  
25 Ag plated1/4-25x.75 & not plated 20 (20)  
24 SS 4-40x.5 2 (2)  
23 SS 4-40x.38 4 (4)  
22 spring plunger 4+2 (4+2)  
         
         
18 magnets, 1.9mm od, length 3.2 mm 5 ~30 not coated, rusty

buy Ni coated ones for future use from www.electroenergy.com

 

17 guide rod, 0.635 mm od, 3.3 mm 3 6 Al
16 wire standoff, 1 mm od, 4.8 mm 2 2 Al and ruby (ruby groove not centered)
15 short OSEMs 5 6  
14 spare ETMX in 40m wiki 1 1  confirmed in cabinet
         
12 dumbbell standoff 5 6  
11 Al stiffening plate 1 (1)  
10 wire clamp B in sus block 2 (2)  
9 wire clamp A 1 (1)  
8-7 lower clamp for lifting optics 2 (2)  
6 upper clamp to hold down optic 1 (1)  
5-4 left-right side of tower  1 ea (1ea)  
3 tower base 1 (1)  
2 sus block 1 (1)  
1 lower and upper OSEM holders 1ea (1ea)  
         
48 sandind fixture for magnet&dumbbell      
45 magnet-dumbbell assemblly fixture 1 1  
43 guide-wirestandoff gluing fixture 1 1

Ok for larger RUBY,

unit is not in perfect condtition but usefull

 

         
  First contact   3-15-2013 purchase

Pick up  FC from Gary with purchasing date 7-7-2015

or later

  FCPEEK peeler ring disk for TM cleaning 10 front,10 back side  have sheets only 32&19mm ID punches ordered
  GordonBrush custom for LIGO optical cleaning ~5 1 (3/8wide nylonSS) more from Calum available
  EP30-2 epoxy have  have expiration date 9-24-2016

NOT finished, last edited 7-7

Attachment 1: SOSsus_Page_1.png
SOSsus_Page_1.png
Attachment 2: SOSsus_Page_2.png
SOSsus_Page_2.png
Attachment 3: ETMXspareTowerFace.jpg
ETMXspareTowerFace.jpg
Attachment 4: ETMXspareTowerBack.jpg
ETMXspareTowerBack.jpg