8661
|
Fri May 31 10:25:17 2013 |
steve | Update | safety | first aid kits refilled |
Quote: |
Recommended correction list:
1, refill- upgrade first aid boxes
2, maintain 18" ceiling to bookshelf clearance so the ceiling fire sprinklers are not blocked: room 101
3, label chilled water supply & return valves in IFO room
4, calibrate bake room hoods annually
5, update safety sign at fenced storage
40m still to do list:
1, clean and measure all safety glasses
2, annual crane inspection is scheduled for 8am March 19, 1013
3, make PSL encloser shelf earthquake proof
Do you see something that is not safe? Add it to this list please.
|
Restocked First Aid Kits Location:
Main entrance, room 100
Drill press - above N2 cylinders, room 103
Control room, next to fire extinguisher, room 102
Vertex-north wall, IFO room 104
ETMY - right on ends light switches, IFO room 104_ east end
ETMX - on vertical I-beam of crane, IFO room 104_south end
Behind 1X3 Rack, on south wall - under instrument breakers panel PC-1, IFO room 104
Last thing remaining to be fixed from 2013 Safety Audit:
replace book shelf with 83" height
|
Attachment 1: refilledFAidK.jpg
|
|
8670
|
Tue Jun 4 10:47:57 2013 |
Steve | Update | safety | safety training |
Our early bird surf student Gautem has received 40m specific basic safety training today. |
8687
|
Thu Jun 6 16:33:19 2013 |
steve | Update | safety | updated laser inventory |
Updated laser inventory and operator list. They are posted in the 40m wiki and entry doors of the 40m IFO room.
Let me know if this list needs correction.
Lightwave M126N-1064-700 NPRO sn 337 in the PSL enclosure got connected to local emergency shut off switch. This is a LIGO operational safety requirement.
|
Attachment 1: ELSOconnected.jpg
|
|
8743
|
Tue Jun 25 10:23:20 2013 |
Steve | Update | safety | surf safety training |
Alex Cole and Craig Cahillane received 40m specific, basic safety training last week.
|
Attachment 1: surfs2014.jpg
|
|
8766
|
Thu Jun 27 17:04:49 2013 |
Jenne | Update | safety | Nitrogen bottle too hot - overpressured |
All of us in the control room / desk area heard a sudden whoosh of air a few minutes ago. It kind of sounded like a pressure washer or something. We determined that the northmost nitrogen bottle outside the front door was letting out all its gas.
It's a gazillion degrees outside (okay, only 91F, according to a google of "Caltech Weather"), and those bottles are in direct sun all day.
We are leaving the bottle as-is, since it seems like its has finished, and nothing else is happening. |
8945
|
Wed Jul 31 09:51:43 2013 |
Steve | Update | safety | Sujan receives safety training |
Sujan got 40m specific basic safety training this morning. |
Attachment 1: IMG_0031.JPG
|
|
9026
|
Mon Aug 19 09:54:13 2013 |
Steve | Update | safety | Masayuki receives safety training |
Masayuki Nakano, a student of Seiji's from ICRR / U Tokyo, is visiting us here at the 40m lab for the next couple months.
He received 40m specific basic safety training this morning. |
9090
|
Fri Aug 30 08:08:29 2013 |
steve | Update | safety | fire horns-flashers tested OK |
We had fire alarm tests and evacuation drills at 1:30pm yesterday. All flashers and horns are functioning unbearably loud and bright including clean assembly room. |
9229
|
Thu Oct 10 08:25:07 2013 |
Steve | Update | safety | Chris received safety training |
Chris Couste, our new undergrad help received 40m specific, basic safety training yesterday. |
9639
|
Fri Feb 14 12:39:02 2014 |
Jenne | Update | safety | Smoke detector cleaned |
Facilities just came by and cleaned the smoke detector that is above Steve's desk. It's next to an air vent, so I guess it collects dust more than a "typical" smoke detector. |
9653
|
Wed Feb 19 08:07:01 2014 |
steve | Update | safety | annual laser safety glasses check |
All 40m laser safety glasses are cleaned and measured this morning. Bring your own safety glasses if you have to enter the 40m IFO room.
Glasses were washed in 1% Liquinox water solution and their transmission measured at 165 mW, 2 mm OD beam of 1064 nm |
Attachment 1: AA2014checked.jpg
|
|
Attachment 2: 2014check.jpg
|
|
9672
|
Tue Feb 25 16:54:57 2014 |
steve | Update | safety | safety audit 2014 |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops. |
9681
|
Thu Feb 27 13:11:13 2014 |
steve | Update | safety | safety audit correction |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Linus-1, Nodus and others ac cords can be moved over to new blank yellow extension cord with multiple recepticals.
Remove two red extension cords going to Smart UPS |
Attachment 1: noDaisyChaining.jpg
|
|
Attachment 2: ZbThumbnail.info
|
9725
|
Thu Mar 13 16:05:48 2014 |
steve | Update | safety | safety audit 2014 |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1 |
Attachment 1: T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf
|
|
9730
|
Mon Mar 17 10:50:58 2014 |
steve | Update | safety | 2014 annual crane certification |
Quote: |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1
|
KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position. |
Attachment 1: 2014craneCert.jpg
|
|
9870
|
Mon Apr 28 17:27:29 2014 |
steve | Update | safety | safety audit 2014 |
Quote: |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1
|
Last long extension cord removed from 1Y1 to ITMX-ISCT
The AC power strip at ITMX-ISCT is coming from wall L#26 |
9873
|
Tue Apr 29 00:11:03 2014 |
steve | Update | safety | safety audit 2014 |
Be aware that this may affect POP QPD and POP RF Thorlabs PD
Quote: |
Last long extension cord removed from 1Y1 to ITMX-ISCT
The AC power strip at ITMX-ISCT is coming from wall L#26
|
|
9900
|
Fri May 2 08:15:54 2014 |
steve | Update | safety | safety audit 2014 |
Late adition: CHECK all viewport covers.
A, transparent Lexan sheet is protecting glass windows in a horizontal position
B, metal housing protection is required on each viewport except signal ports
C, signal ports should be shielded by optical table enclosure
We have to cover this window-camera with implosion proof cover or just remove it and blank it.
Question number 2: Do our vertically positioned windows with flip able covers require protective lexan ? NO 5-5-2014 |
Attachment 1: solidCoverRequired.jpg
|
|
9984
|
Wed May 21 13:51:19 2014 |
Steve | Update | safety | scope battery recall |
Tektronix RECALL on TDS3000 or TDS300B oscilloscope BATTERIES TDS3BATB
This Lithium-Ion battery can be a fire hazard ! Remove battery pack and recycle it through Safety Office ! |
10007
|
Mon Jun 9 09:41:06 2014 |
steve | Update | safety | safety training |
2014 surf students Nichin and Akhil received 40m specific basic safety training last week. |
Attachment 1: 2014surfs.jpg
|
|
10069
|
Thu Jun 19 10:39:22 2014 |
steve | Update | safety | surf safety training |
Andres Medina and Andrew "Harry" Hall received 40m specific safety training. They did general safety already and their laser safety training will be this after noon. |
Attachment 1: 2014surfsAA.jpg
|
|
10071
|
Thu Jun 19 14:12:45 2014 |
steve | Update | safety | optical table scans |
PSL, AP, ETMY and ETMX optical tables were scanned for stay beam. |
10138
|
Mon Jul 7 14:38:55 2014 |
Steve | Update | safety | safety training |
TaraV - geology major undergrad - of Jenne's summer help received 40m specific basic safety training. |
10201
|
Tue Jul 15 11:04:05 2014 |
Steve | Update | safety | safety glasses must be worn all times! |
This is the third safety glasses that I found laying around in the IFO lab lately. Safety glasses must be worn ALL times in the IFO room!
This rule is essential for your protection! Please do not enter if you can not put up with this regulation!
|
Attachment 1: safetyglasses.jpg
|
|
10476
|
Tue Sep 9 09:19:21 2014 |
Steve | Update | safety | response to fried Sorensen |
Quote: |
Quote: |
Q and Steve will follow elog 10028 entry to prepare the vacuum system for safe reboot
|
Here's the sequence of the morning so far:
- I aligned the IFO (IR arms with ASS, X green with PZTs, PRM with PRMI locked on REFL33)
- I closed the PSL shutter, and went inside to align PRM and both ITM oplevs (all others were within 10urad of zero in both directions)
- While aligning those oplevs, I noticed the smell of burnt electronics. We tracked it down to the +15V sorensen in the rack nearest the PSL table
- I claim the precipitating event was PSL shutter activity. If I recall correctly, the seismic rainbow traces went bonkers around the same time as the shutter was closed. There is a Guralp interface in the rack powered by the failed sorensen, so this would explain the erratic seismometer signals correlated with the power supply failure. We will look into potential shorts caused by the shutter. (Steve looked up the PMC trans and Guralp DQ channels, and confirmed the temporal coincidence of the events.)
- We shut off all of the sorensens so that electronics were not being driven asymmetrically.
- Steve and I secured the vacuum system for computer reboots, as referred to in Steve's elog. Some combination of Jenne, Rana and Manasa shut down the control room computers, and turned off the watchdogs.
- Manasa and I moved Chiara inside, next to Mafalda, along with its backup HDs. It has been labeled.
- Booted up control room machines, they came up happy.
- FB and front-ends didn't need reboot, for some lucky reason. Watchdogs came back happily, oplev spots didn't move noticeably.
The IFO is still down, as the PMC won't lock without the rack power, and we haven't pinned down the shorting mechanism. We don't want the replacement sorensen to immediately blow when plugged in.
|
Smoking Sorensen could have triggered the smoke alarm!
Yesterday I called CIT Fire Protection Services very first to deactivate the sensors temporarily. The smoke alarm was turned back on right after the particle count dropped.
Their phone number is posted at the entry doors 104M and 104W as shown below.
|
Attachment 1: friedSorenson.png
|
|
Attachment 2: smokeAlarm1a.jpg
|
|
Attachment 3: smokeAlarm2a.jpg
|
|
10716
|
Fri Nov 14 15:26:45 2014 |
Steve | Update | safety | Diego gets safety traning |
Diego Bersanetti received 40m specific safety training today. |
10781
|
Thu Dec 11 15:40:04 2014 |
Steve | Update | safety | safety training |
Katherine Dooley has received 40m specific basic safety training in the 40m lab |
11068
|
Wed Feb 25 14:35:32 2015 |
Steve | Update | safety | safety audit 2015 |
Safety audit went soothly. We thank all participients.
Correction list:
1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.
2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.
3, Sprinkler head to be moved eastward 2 ft in room 101
4, Annual crane inspection is scheduled for 8am Marc 3, 2015
5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning. |
Attachment 1: safety2015audit.jpg
|
|
11085
|
Fri Feb 27 14:17:51 2015 |
Steve | Update | safety | safety audit 2015 |
Safety glasses were measured and they are all good. I'd like to measure your personal glass if it is not on this picture.
Quote: |
Safety audit went soothly. We thank all participients.
Correction list:
1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.
2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.
3, Sprinkler head to be moved eastward 2 ft in room 101
4, Annual crane inspection is scheduled for 8am Marc 3, 2015
5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning.
|
|
Attachment 1: 1064Tchecked.jpg
|
|
11093
|
Tue Mar 3 11:38:11 2015 |
Steve | Update | safety | professional crane inspection |
Quote: |
Safety glasses were measured and they are all good. I'd like to measure your personal glass if it is not on this picture.
Quote: |
Safety audit went soothly. We thank all participients.
Correction list:
1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.
2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.
3, Sprinkler head to be moved eastward 2 ft in room 101
4, Annual crane inspection is scheduled for 8am Marc 3, 2015
5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning.
|
|
Konecranes' Fred inspected and load tested all tree cranes at with 450 lbs |
Attachment 1: 450lbs2015.jpg
|
|
11377
|
Thu Jun 25 15:07:50 2015 |
Steve | Update | safety | Surfs Safety 2015 |
Jessica Pena, Megan Kelly, Eve Chase and Ignacio Magana received 40m specific basic safety traning today. |
Attachment 1: surfs2015.jpg
|
|
11443
|
Fri Jul 24 13:49:09 2015 |
Steve | Update | safety | Lock doors please ! |
Thursday morning I found the control room emergency exit not locked.
Please check the doors when leaving the lab , specially when you are the last one out. |
11452
|
Tue Jul 28 15:05:09 2015 |
Steve | Update | safety | fire alarm test ? no |
We just had fire alarm trigged avacuation of the 40m lab.
It turned out that the CES building second floor sensor caused this action. |
Attachment 1: 6minGaps.png
|
|
11531
|
Tue Aug 25 16:39:06 2015 |
Steve | Update | safety | safety training |
Alessandra Marrocchesi received 40m specific basic safety training yesteday. |
11660
|
Fri Oct 2 15:33:09 2015 |
Steve | Update | safety | safety training |
Gautom has received 40m specific basic safety training today. |
11728
|
Wed Nov 4 08:04:53 2015 |
Steve | Update | safety | safety training |
Yutaro Enamoto, visiting graduate student of Seiji received 40m specific basic safety training.
|
Attachment 1: Yutaro.jpg
|
|
11911
|
Tue Jan 5 15:48:16 2016 |
Steve | Update | safety | Rat trap locations |
Please look around when working close to these five locations. Use flashlights or leave lights on.
These mechanial traps are HAZARDOUS !
No visitors or tours till Monday, Jan 11 2016 |
Attachment 1: Control_Room.jpg
|
|
Attachment 2: EarmCESdoor.jpg
|
|
Attachment 3: 1Y1.jpg
|
|
Attachment 4: MC2.jpg
|
|
Attachment 5: XarmMaglev.jpg
|
|
11913
|
Tue Jan 5 17:19:57 2016 |
rana | Update | safety | Rat trap locations |
In the modern times, people use glue traps to catch rats instead of springs. They are less hazardous to people and don't spread rat fluid on the floor. |
11976
|
Thu Feb 4 10:19:05 2016 |
Steve | Update | safety | fire marshal inspection |
Pasadena fire marshal inspected the lab today. No violation was found. |
12008
|
Wed Feb 24 10:27:23 2016 |
Steve | Update | safety | safety audit 2016 |
Safety audit went smothly.
Crane inspection is scheduled for March 4
Safety glasses will be measured before April 1
|
Attachment 1: audit2016.jpg
|
|
12015
|
Wed Mar 2 10:09:28 2016 |
Steve | Update | safety | professional crane inspection |
The crane inspection is scheduled for this coming Friday from 8-12
|
12018
|
Thu Mar 3 10:19:20 2016 |
Steve | Update | safety | safety audit 2016 |
Bob cleaned the safety glasses. They were sonicated in warm 2% Liquinox water for 10 minutes. Steve checked them by transmission measurement of 1064 nm at 150 mW
|
Attachment 1: checkedSG.jpg
|
|
12020
|
Fri Mar 4 11:07:10 2016 |
Steve | Update | safety | crane inspection completes 2016 safey audit |
All 3 cranes inspected by professional and load tested with 450 lbs at max reach.
|
Attachment 1: craneInsp2016.jpg
|
|
12054
|
Wed Mar 30 11:35:24 2016 |
steve | Update | safety | BS visitor's viewport is protected with lexan |
Quote: | The four horizontal viewports of arms are protected
by 3/8" thick, 8.5" OD Lexan disk of MR10 Polycarbonate.
ITMX, ETMX, ITMY and ETMY ccd cameras are not focused now. |
BS visitor's viewport glass is now covered with Lexan MR10
Note:
this Lexan cover is in vertical orientation so becomes lose when the black anodized cover is removed.
It needs to be held in place while it's housing is taken off. |
12082
|
Tue Apr 19 10:58:53 2016 |
Steve | Update | safety | safety scans at PSL & tables |
The PSL had one 1064 nm beam to be blocked around the north east side. The end enclosures are fine.
|
12134
|
Wed May 25 11:51:40 2016 |
Steve | Update | safety | SURF 2016 safety |
Quote: |
Hello, I am Varun Kelkar. I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control system signals. This week I will mostly be working on implementing basic DSP C-code offline. Currently I am trying to write a code for noise whitening.
-Varun
|
Varun has received 40m specific basic safety training today. |
12141
|
Tue May 31 16:52:58 2016 |
Steve | Update | safety | NONO |
Please do not place anything on the top of the cabinets that is not tied down. It will end up on our head in an earth quake.
|
Attachment 1: nono.jpg
|
|
12157
|
Wed Jun 8 10:20:14 2016 |
Steve | Update | safety | SURF 2016 safety |
Aakash Patil received 40m specific basic safety training.
Quote: |
Quote: |
Hello, I am Varun Kelkar. I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control system signals. This week I will mostly be working on implementing basic DSP C-code offline. Currently I am trying to write a code for noise whitening.
-Varun
|
Varun has received 40m specific basic safety training today.
|
|
12228
|
Wed Jun 29 15:34:00 2016 |
Steve | Update | safety | SURF 2016 safety |
Praful Vasiceddy received 40m specific basic safety training.
Quote: |
Aakash Patil received 40m specific basic safety training.
Quote: |
Quote: |
Hello, I am Varun Kelkar. I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control system signals. This week I will mostly be working on implementing basic DSP C-code offline. Currently I am trying to write a code for noise whitening.
-Varun
|
Varun has received 40m specific basic safety training today.
|
|
|
12311
|
Tue Jul 19 15:16:43 2016 |
Steve | Update | safety | safety training |
Our new graduate student Lydia received 40m specific safety training. |