40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m elog, Page 1 of 357 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Wed Nov 6 17:45:34 2019, gautam, Update, LSC, ~
|
Wed Jun 6 22:25:05 2012, Jamie, Update, Computers, zita now running ubuntu 10.04
|
Thu Jun 7 12:49:50 2012, Jamie, Update, Computers, zita network configured
|
Tue Nov 12 21:50:01 2013, rana, Update, , zita network configured
|
Tue May 5 09:22:46 2009, caryn, Update, PEM, zeros 
|
Thu Mar 5 02:24:19 2009, rana, Configuration, Computers, yum.repos.d
|
Mon Apr 19 13:23:03 2010, josephb, Configuration, Computers, yum update fixed on control room machines
|
Mon Jul 7 08:13:41 2014, steve, Update, General, yes,there was firework
|
Sat May 17 14:48:06 2014, den, Update, PEM, yend sei isolation kit is set 
|
Wed Dec 18 03:29:48 2013, Den, Update, LSC, yarm locked on mc
|
Thu Nov 15 21:52:48 2012, Den, Ayaka, Update, Green Locking, yarm locked 
|
Mon May 19 22:44:21 2014, den, Update, PEM, xend sei isolation kit is set
|
Mon Aug 7 14:02:52 2023, Radhika, Update, AUX, xend AUX fully locking with Moku:Go  
|
Fri Nov 16 03:12:39 2012, Ayaka, Den, Update, Green Locking, xarm locked
|
Fri Nov 16 09:57:57 2012, Jenne, Update, Green Locking, xarm locked
|
Mon Jul 18 17:07:12 2022, yuta, Update, LSC, x4.12 added to ETMX coil outputs to balance with ETMY
|
Fri Jan 23 16:33:27 2009, pete, Update, oplevs, x-arm oplev calibrations
|
Tue May 17 19:38:32 2011, kiwamu, Update, SUS, wrong connection on 1X5 
|
Thu Sep 29 03:43:20 2011, kiwamu, Update, ASC, wrong channel assignment on IPPOS
|
Mon Nov 21 15:16:12 2022, Tega, Update, CDS, workstation upgrade
|
Sat May 4 00:21:00 2013, rana, Configuration, Computers, workstation updates
|
Fri Aug 12 14:37:34 2016, Steve, Update, SEI, working seismometers as they are  
|
Tue Nov 24 14:33:22 2009, Alberto, Update, ABSL, working on the AP table
|
Tue Nov 24 19:16:02 2009, Alberto, Update, ABSL, working on the AP table
|
Mon Sep 21 15:22:19 2015, jamie, Update, DAQ, working on new fb replacement
|
Fri Oct 30 04:41:37 2009, rob, Update, Locking, working again
|
Wed Aug 10 10:32:44 2016, Steve, Update, SEI, working Guralps as they are 6x
|
Tue May 26 11:05:10 2015, Steve, Update, PEM, worked around ETMY seism. 
|
Thu Jun 23 02:12:12 2011, Sonali, Update, Green Locking, work schedule.
|
Fri Jan 27 19:40:03 2017, rana, Metaphysics, elog, word wrapping & large images
|
Mon Nov 25 10:57:14 2013, Koji, Update, CDS, woes on the X-end hosts
|
Sun May 15 14:01:56 2011, kiwamu, Update, IOO, wiring diagram for IP-POS
|
Mon May 16 11:14:36 2011, rana, Update, IOO, wiring diagram for IP-POS
|
Wed Dec 13 09:49:23 2017, johannes, Update, ASS, wiring diagram
|
Wed Jul 8 11:13:36 2009, Alberto, Omnistructure, Computers, wireless router disconnected
|
Fri Sep 25 11:08:33 2015, Steve, Update, SUS, wire standoffs
|
Wed Mar 16 15:36:03 2016, Steve, Update, SUS, wire standoff test cut
|
Wed Mar 16 16:02:40 2016, Koji, Update, SUS, wire standoff test cut
|
Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation
|
Wed Nov 17 07:32:48 2021, Chub, Update, General, wire clamp plate mod
|
Wed Nov 17 11:53:27 2021, Koji, Update, General, wire clamp plate mod
|
Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test
|
Wed Jun 23 23:55:03 2010, Katharine, Sharmila, Rana, Steve and Kiwamu, Update, VAC, wiped the BS
|
Wed Jan 18 12:36:26 2012, kiwamu, Update, LSC, wiped a steering mirror on the REFL path 
|
Wed Jun 7 15:41:51 2017, Steve, Update, Computers, window laptop scanned
|
Wed Mar 11 04:33:57 2009, rana, Configuration, Computer Scripts / Programs, wild ndsproxy tclshexe
|
Mon Apr 25 11:23:41 2011, Alastair, Bureaucracy, Computers, wiki?
|
Mon Apr 25 11:58:37 2011, Jamie, Bureaucracy, Computers, wiki?
|
Mon Apr 25 12:55:19 2011, Jenne, Bureaucracy, Computers, wiki?
|
Mon Apr 25 12:55:35 2011, Alastair, Bureaucracy, Computers, wiki?
|
|