40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 357 of 357  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  11838   Wed Dec 2 15:52:28 2015 yutaroUpdateLSCrestoration of POXDCI disconnected the   
  11839   Wed Dec 2 17:14:33 2015 yutaroUpdateLSCBeam on POX11 is possibly not centered wellI checked how POXDC level changes when
the angle of ITMX is varied. ETMX was misaligned.

Then I found that in YAW direction
 47.png41.png 
  11843   Thu Dec 3 10:05:07 2015 yutaroUpdateOptical LeversCalibration of oplevs for ITMX/ETMXI updated the figures. I think it's
easier to read now.
  
  11845   Thu Dec 3 19:10:28 2015 yutaroUpdateLSCXARM lock with ITMX actuated and related change on ASSTo avoid the strange kicking of ETMX, I
locked XARM with ITMX actuated instead of
ETMX so that I changed elements of C1LSC_OUTPUT_MTRX;
 40.png 
  11846   Fri Dec 4 10:18:33 2015 yutaroUpdateASSOffset in the dither loop of XARM vs beam spot shift on ETMXAs I did for YARM (elog
11779), I measured the relation between
offsets added just after the demodulation
 offset-angleETMXPIT.pngoffset-angleETMXYAW.png 
  11847   Fri Dec 4 12:33:52 2015 yutaroUpdateLSCBeam on POX11 is possibly not centered wellTo focus POX beam on POX11 PD, I added
an iris and a lens before POX11 PD as you
can see in Attachment 1.
 image1-3.JPG07.png47.png 
  11850   Fri Dec 4 23:02:13 2015 yutaroUpdateLSCBeam on POX11 is possibly not centered well[yutaro, Koji]

Now, the beam on POX11 PD is well
centered and well focused.
 image1.JPG56.png04.png 
  11851   Sat Dec 5 12:02:25 2015 yutaroHowToCamerasWhen image capture does not work...Today image capture did not work again,
though it had worked 3 days before. I also
found that red indicator light on the
  
  11853   Sat Dec 5 21:57:32 2015 yutaroHowToCamerasWhen image capture does not work...I don't know if just running "modprobe"
will work or not, because I didn't try
it...  When the same problem happens
  
  11855   Mon Dec 7 10:40:09 2015 yutaroUpdateComputer Scripts / ProgramsAdded 1 line to UNFREEZE_DITHER.pyI added 1 line to one of the ASS scripts,
UNFREEZE_DITHER.py like this:

L29>   ez.cawrite('C1:ASS-'+dof+'_GAIN',
  
  11857   Mon Dec 7 11:11:25 2015 yutaroSummaryLSCround trip loss of X armOn the day before yesterday and in this
morning, I measured loss map of ETMX. I reported
the method I used to change the beam spot
 image1-2.JPGsymmetry.png 
  11860   Mon Dec 7 15:56:35 2015 yutaroUpdateLSCXARM lock with ITMX actuated and related change on ASSI changed the snapshot file for ASS, /opt/rtcds/caltech/c1/scripts/ASS_DITHER_ON.snap
as follows:
  
  11861   Tue Dec 8 11:24:45 2015 yutaroSummaryComputer Scripts / ProgramsScripts for loss map measurementHere I explain usage of my scripts
for loss map measurement. There are 7 script
files in a same directory /opt/rtcds/caltech/c1/scripts/lossmap_scripts. With
  
  11864   Tue Dec 8 15:57:16 2015 yutaroSummaryLSCPower recycling gain estimation from arm loss measurementI estimated power recycling gain with the
results of arm loss measurement.

From elog
  
  11870   Thu Dec 10 12:33:04 2015 yutaroUpdateLSCstrange behavior of ASDCI did additional tests for the strange
behavior of ASCD. ETMY, ETMX and ITMY were
misaligned so that only light reflected by
 07.png28.pngASDC.png 
  11871   Thu Dec 10 19:53:22 2015 yutaroUpdateLSCstrange behavior of ASDCTo check if the strange behavior of ASDC
is caused by SR2/SR3 or not, I did the following
measurement:
 30.png11.png49.png 
  11872   Fri Dec 11 09:35:44 2015 yutaroUpdateLSCPower recycling gain estimation from arm loss measurementI took PR3 AR reflectivity and calculated
PRG (PR3 is flipped and so AR surface is
inside PRC).
 LaserOptikAR.png 
  11874   Fri Dec 11 15:37:50 2015 yutaroUpdateLSCPower recycling gain estimation from arm loss measurementAttached is the plot of relation between
the average arm round trip loss and
power recycling gain. 2 % loss due to PR3
 PRG_plot.png 
  11875   Fri Dec 11 16:16:36 2015 yutaroUpdateOptical LeversCalibration of oplevs for ITMX/ETMXBased on calibration measurement I have
done (elog
11785, 11831), I
  
ELOG V3.1.3-