40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Sat May 17 14:48:06 2014, den, Update, PEM, yend sei isolation kit is set IMG_1405.JPGIMG_1406.JPG
    Reply  Mon May 19 22:44:21 2014, den, Update, PEM, xend sei isolation kit is set 
Message ID: 9971     Entry time: Mon May 19 22:44:21 2014     In reply to: 9967
Author: den 
Type: Update 
Category: PEM 
Subject: xend sei isolation kit is set 

Quote:

Yend seismometer isolation kit (elog 8461) hosts Guralp seismometer. I made a cable for inside connection, assembled the kit and relocated the instrument from its previous position at the yend inside the kit.

Seismometer is connected to the readout box and running.

    

 Xend internal cabling and external connector is ready. We are waiting for seismometer from Gyro lab. We still need to fix the pot with clamps after we put the instrument in.

We also need a long cable from Xend to the guralp readout box.

ELOG V3.1.3-