40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu May 15 02:32:01 2014, Jenne, Update, LSC, Started engaging the AO path, not getting all the way yet TFSR785_15-05-2014_011008.pdf
    Reply  Thu May 15 02:52:51 2014, Jenne, Update, LSC, Started engaging the AO path, not getting all the way yet 
Message ID: 9957     Entry time: Thu May 15 02:52:51 2014     In reply to: 9956
Author: Jenne 
Type: Update 
Category: LSC 
Subject: Started engaging the AO path, not getting all the way yet 

 

 In addition to a transparent legend, we need the corresponding CM crossover measurements from DTT to compare with the Q-Mist-Loop model results. The xover tells us when the AO gain is high enough so that they can be ramped up together.

Also, I wonder how much power fluctuation we get from the large ALS DIFF noise and if that demands we get the TR signals normalized by POPDC.

ELOG V3.1.3-