40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Apr 30 11:16:41 2014, Steve, Update, IOO, this typical morning 40days.png
    Reply  Fri May 2 08:38:07 2014, Steve, Update, IOO, this typical morning 2dTrend.png
Message ID: 9878     Entry time: Wed Apr 30 11:16:41 2014     Reply to this: 9901
Author: Steve 
Type: Update 
Category: IOO 
Subject: this typical morning 

c1sus and c1iscey were reset. The PMC needed to be locked. MC locked instantly.

The FSS ion pump power supply was turned on.

 

 

 

 

Attachment 1: 40days.png  40 kB  | Hide | Hide all
40days.png
ELOG V3.1.3-