40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Dec 31 23:19:58 2013, Koji, Summary, General, linux1 RAID crash & recovery 
    Reply  Thu Jan 2 10:15:20 2014, Jamie, Summary, General, linux1 RAID crash & recovery 
    Reply  Thu Jan 2 10:50:24 2014, Steve, Update, VAC, vacuum monitor is still blank Help.pngvacation.png20131220lastRGAscan.png
       Reply  Thu Jan 2 13:35:06 2014, Koji, Update, VAC, vacuum monitor is still blank 
          Reply  Tue Jan 28 11:13:50 2014, Koji, Update, VAC, vacuum monitor is still blank 
             Reply  Tue Jan 28 16:26:40 2014, Steve, Update, VAC, vacuum computers are back without safety c1vac1_vac2areback.png
                Reply  Wed Feb 5 08:14:59 2014, Steve, Update, VAC, vacuum computers are back without safety 
       Reply  Mon Jan 13 16:50:55 2014, Steve, Update, VAC, Maglev controller needs service 
          Reply  Wed Apr 2 16:34:15 2014, Steve, Update, VAC, Maglev controller needs service 
             Reply  Thu Apr 3 17:05:52 2014, Steve, Update, VAC, Maglev controller swapped loanerControllerIn.png
                Reply  Thu Apr 10 16:09:29 2014, Steve, Update, VAC, RGA scan at 75% pumping speed 520HzpumpingSpeed.png
                   Reply  Tue May 27 11:00:43 2014, Steve, Update, VAC, RGA scan at day 111 pd77d111RGA.png
                      Reply  Thu Aug 21 15:07:48 2014, Steve, Update, VAC, RGA scan at day 197 RGAscan@d197.png
                         Reply  Mon Sep 22 15:20:32 2014, Steve, Update, VAC, RGA scan at day 229 RGA@229day.pngRGAscan229d.png
                Reply  Mon Apr 21 10:14:00 2014, Steve, Update, VAC, Maglev controller serviced ourControllerBack560Hz.png
             Reply  Wed Aug 29 09:56:00 2018, Steve, Update, VAC, Maglev controller needs service 
                Reply  Mon Oct 22 15:19:05 2018, Steve, Update, VAC, Maglev controller serviced our_controller_is_back.png
    Reply  Mon Jan 6 16:32:40 2014, Koji, Summary, General, linux1 RAID crash & recovery 
Message ID: 9834     Entry time: Mon Apr 21 10:14:00 2014     In reply to: 9782
Author: Steve 
Type: Update 
Category: VAC 
Subject: Maglev controller serviced 

Quote:

 

 The loaner controller is swapped in. It has  520 Hz rotation speed.  This speed use to be 680 Hz with our old one.

 The  Maglev controller was serviced at Osaka Vacuum. It was swapped in this morning.

Attachment 1: ourControllerBack560Hz.png  121 kB  | Hide | Hide all
ourControllerBack560Hz.png
ELOG V3.1.3-