Pumpdown completed. IR shutter opened at P1 1 mTorr The block is still in the beam path.
Remember to protect MCR pd before crack up the PSL power.
The ion pump gate valves were just closed by cc1 triggered interlock
The cry pump was "regenerated" during the vent and it's outgassing rate minimized.
CC3 cold cathode gauge was replaced.
Valve configuration for week end:
1, VA6 disconnected to avoid accidental venting the IFO through the annulos
2, VC2 disconnected to insure that the cryo stays closed
3, RGA is not running, It's pressure limit 1e-5 Torr
|