40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 9588     Entry time: Thu Jan 30 19:00:25 2014
Author: Gabriele 
Type: Summary 
Category: LSC 
Subject: PRC length changed 

 [Manasa, EricQ, Gabriele]

Today we changed the PRC length translating PR2 by 27 mm in the direction of the corner. After this movement we had to realign the PRC cavity to get the beam centered on PRM, PR2, PR3, BS (with apertures) and ITMY (with aperture). To realign we had to move a bit both PR2 and PR3. We could also see some flashes back from the ETMY . //Edit by Manasa : We could see the ETMY reflection close to the center of the ITMY but the arm is not aligned or flashing as yet//. 

After the realignment we measured again the PRC length with the same method of yesterday. We only had to change one of the length to measure, because it was no more accessible today. The new map is attached as well as the new script (the script contains also the SRC length estimation, with random numbers in it).

The new PRC length is 6753 mm, which is exactly our target!

 

The consistency checks are within 5 mm, which is not bad.

We also measured some distances to estimate the SRC length, but right now I'm a bit confused looking at the notes and it seems there is one missing distance (number 1 in the notes). We'll have to check it again tomorrow.

 

 

 

Attachment 1: map_jan30.pdf  7 kB  | Hide | Hide all
map_jan30.pdf
Attachment 2: survey_v3_jan30.m  15 kB  | Hide | Hide all
clear all


global sos_lx sos_ly sos_cx sos_cy tt_lx ...
       tt_ly tt_cx tt_cy sos_sx sos_sy sos_dy

%% Survey of the PRC+SRC lengths %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%

%% measured distances
d_MB2_MY  = 2114 + 27 + 9;
... 446 more lines ...
ELOG V3.1.3-