40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Jan 3 15:19:39 2014, rana, Summary, PSL, PSL pointing monitoring PSL_pointing_2013.png
    Reply  Fri Jan 3 18:21:45 2014, rana, Summary, PSL, PSL pointing monitoring 
       Reply  Mon Jan 6 16:30:31 2014, Jenne, Summary, PSL, PSL pointing monitoring MCspots_6Jan2014.png
Message ID: 9518     Entry time: Fri Jan 3 18:21:45 2014     In reply to: 9517     Reply to this: 9519
Author: rana 
Type: Summary 
Category: PSL 
Subject: PSL pointing monitoring 

 

 I went to the PSL table to re-align the input pointing to the IMC. After trying to optimize the pointing into the PMC and not succeeding I also then touched the wrong mirror and messed up our IOO QPD reference pointing.

The IMC is locking again, but I'll have to fix the pointing on Monday.

ELOG V3.1.3-