Thu Dec 12 17:22:07 2013, Steve, Update, General, rack power supplies checked 8x
|
Fri Dec 13 16:34:20 2013, Steve, Update, VAC, PS will be replaced next week 
|
Fri Dec 20 20:04:01 2013, Steve, Update, VAC, power supply replaced with a short vent  
|
Fri Dec 20 23:00:41 2013, Koji, Update, VAC, power supply replaced with a short vent
|
Sat Dec 21 10:53:35 2013, Steve, Update, VAC, power supply replaced with a short vent-pumpdown completed
|
Fri Jan 3 11:18:41 2014, Steve, Summary, VAC, power supply replaced with a short vent
|
Thu Feb 22 10:49:11 2018, Steve, Update, Electronics, rack power supplies checked 8x
|
|
Message ID: 9510
Entry time: Sat Dec 21 10:53:35 2013
In reply to: 9508
|
Author: |
Steve |
Type: |
Update |
Category: |
VAC |
Subject: |
power supply replaced with a short vent-pumpdown completed |
|
|
The recovery- pumpdown reached valve configuration vacuum normal at 20 hours, cc1 7.7e-6 Torr
Lesson learned: turn all pumps off, close all valves before you reboot ! like you would prepare for AC power shut down.
|
|
|