40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Sat Oct 26 21:46:33 2013, RANA, Update, IOO, Mode Cleaner Tune-UP MCtrend.pdfMC40days.png
    Reply  Mon Oct 28 14:12:48 2013, manasa, Update, IOO, Mode Cleaner relocked Screenshot-Untitled_Window-3.png
       Reply  Wed Oct 30 01:53:52 2013, Jenne, Update, IOO, Mode Cleaner relocked 
    Reply  Mon Oct 28 21:33:55 2013, RANA, Update, IOO, Mode Cleaner Tune-UP Untitled.png
       Reply  Thu Oct 31 15:34:28 2013, manasa, Update, IOO, MC not happy since yesterday MC_drift.png
       Reply  Thu Oct 31 20:05:48 2013, RANA, Update, IOO, Mode Cleaner Tune-UP drifty.png
          Reply  Fri Nov 1 09:45:32 2013, Steve, Update, IOO, beam dumps to be find razor_beam_dumps.jpg
          Reply  Mon Nov 4 11:37:12 2013, Steve, Update, IOO, PSL output shutter installed Shutterisback.jpg
             Reply  Mon Nov 4 12:59:43 2013, Jenne, Update, IOO, MC alignment not so good after PSL output shutter installed MCspots_4Nov2013.png
                Reply  Tue Nov 5 00:39:43 2013, manasa, Update, IOO, IFO alignment tuning MC_spot.png
                   Reply  Tue Nov 5 08:44:21 2013, Steve, Update, IOO, after last steering mirror mount swap after_Shutter_SMm_installed.pngafterlastSMmountswap.jpg
                   Reply  Tue Nov 5 17:12:34 2013, Steve, Update, LSC, centered qpds recentered.png
                      Reply  Wed Nov 6 08:33:53 2013, Steve, Update, IOO, Poiting changes of PSL 1dayTRENDofPOITING.png20dayTRENDioo.png
                         Reply  Thu Nov 7 08:57:20 2013, Steve, Update, IOO, PSL pointing monitoring PMC11072013.jpgPMCTqpdMon.png
                            Reply  Mon Nov 11 22:35:45 2013, RANA, Update, IOO, PSL pointing monitoring qpd.pdf
                               Reply  Tue Nov 12 23:48:23 2013, RANA, Update, IOO, PSL pointing monitoring 
                               Reply  Thu Nov 21 16:32:20 2013, Steve, Update, IOO, PMC needs a touch of love PMCplus.png
                               Reply  Fri Dec 6 15:57:41 2013, Steve, Update, IOO, beam dumps for PSL pointing monitoring  IOO_QPD_MONS.jpgPointingTrend23d.png
                                  Reply  Tue Dec 10 10:07:01 2013, Steve, Update, IOO, more beam traps InputWindowRefDump.jpgInpWindowRefDupm.jpg
Message ID: 9421     Entry time: Thu Nov 21 16:32:20 2013     In reply to: 9365
Author: Steve 
Type: Update 
Category: IOO 
Subject: PMC needs a touch of love 

 

 The PMC power degrading on this 3 days plot. MC2 -T = 14,200 counts. C1:IOO-MC_TRANS_SUM can not be ploted in dataviewer. The MEDM screen has a valid number.

Initial pointing is not so bad (what does "not so bad" mean ???)

C1iscey comes and goes again.

 

Attachment 1: PMCplus.png  166 kB  | Hide | Hide all
PMCplus.png
ELOG V3.1.3-