40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Sep 5 10:28:17 2013, Steve, Update, SUS, PRM side  craneguywashere.png
    Reply  Thu Sep 5 11:19:33 2013, Jenne, Update, SUS, PRM side  
Message ID: 9110     Entry time: Thu Sep 5 10:28:17 2013     Reply to this: 9112
Author: Steve 
Type: Update 
Category: SUS 
Subject: PRM side  

I think the crane repair guy accidentally  stepped on the  BSC support beam.

PRM side is not coming down.

Attachment 1: craneguywashere.png  38 kB  | Hide | Hide all
craneguywashere.png
ELOG V3.1.3-