40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 9018     Entry time: Fri Aug 16 13:25:50 2013
Author: Koji 
Type: Update 
Category: ASS 
Subject: ASX model/screen cleaning up 

[Koji Manasa]

Yesterday we cleaned up the ASX model and screens to have more straight forward structure of the screen
and the channel names, and to correct mistakes in the model/screens.

The true motivation is that I suspect the excess LF noise of the X arm ALS can be caused by misalignment
and beam jitter coupling to the intensity noise of the beat. I wanted to see how the noise is affected by the alignment.
Currently X-end green is highly misaligned in pitch.

- Any string "XEND" was replaced by "XARM", as many components in the system is not localized at the end table.

- The name like "XARM-ITMX" was changed to "XARM-ITM". This makes easier to create the corresponding model for the other arm.

- There was some inconsistency between the MEDM screens and the ASX model. This was fixed.

- A template StripTool screen was created. It is currently saved in users/koji/template as ASX.stp.
  It will be moved to the script directory once it's usefulness is confirmed.


The next step is to go to the end table and manually adjust M2 mirror while M1 is controlled by the ASX.
The test mass dithering provides the error signal for this adjustment but the range of the PZT is not enough
to make the input spot position to be controlled. In the end, we need different kind of matching optics
in order to control the spot position. (But is that what we want? That makes any PZT drift significantly moves the beam.)

ELOG V3.1.3-