40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Aug 9 22:51:37 2013, Koji, Update, LSC, PRMI(sb) lock recovered 
    Reply  Mon Aug 12 10:44:22 2013, rana, Update, LSC, PRMI(sb) lock recovered 
    Reply  Mon Aug 12 14:05:34 2013, Jenne, Update, ASC, PRCL ASS software in place 
       Reply  Mon Aug 12 15:39:40 2013, Jenne, Update, ASC, PRCL ASS screens in place 
       Reply  Mon Aug 12 17:30:03 2013, Koji, Update, ASC, PRCL ASS software in place 
          Reply  Mon Aug 12 23:13:14 2013, Jenne, Update, ASC, PRCL ASS software in place 
Message ID: 8997     Entry time: Mon Aug 12 14:05:34 2013     In reply to: 8992     Reply to this: 8998   8999
Author: Jenne 
Type: Update 
Category: ASC 
Subject: PRCL ASS software in place 

Quote:

- We are ready to implement ASS for PRM

 I have added an IPC sender from the LSC model, to send POPDC to ASS.  I have copied over the structure of the arms' ASS, to do the same for PRCL.  I have set it up to dither the PRM, and feed back to the PRM.  I did not include an LSC set, since I'm assuming that we'll set the input pointing with the arms, and just want to move the PRM to maximize POPDC.

Models have been compiled, installed, and restarted, and the daqd was restarted.

ELOG V3.1.3-