40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Aug 8 21:25:36 2013, Koji, Update, General, Post-vent alignment cont'd 
    Reply  Fri Aug 9 16:49:35 2013, Jenne, manasa, Update, Electronics, Post-vent alignment cont'd - RFPDs 
Message ID: 8990     Entry time: Fri Aug 9 16:49:35 2013     In reply to: 8989
Author: Jenne, manasa 
Type: Update 
Category: Electronics 
Subject: Post-vent alignment cont'd - RFPDs 

Notes to the fiber team:

I am aligning beam onto the RFPDs (I have finished all 4 REFL diodes, and AS55), in preparation for locking. 

In doing so, I have noticed that the fiber lasers for the RFPD testing are always illuminating the photodiodes!  This seems bad!  Ack!  

For now, I blocked the laser light coming from the fiber, did my alignment, then removed my blocks.  The exception is REFL55, which I have left an aluminum beam dump, so that we can use REFL55 for PRM-ITMY locking, so I can align the POP diodes.

EDIT:  I have also aligned POP QPD, and POP110/22.  The fiber launcher for POP110 was not tight in its mount, so when I went to put a beam block in front of it and touched the mount, the whole thing spun a little bit.  Now the fiber to POP110 is totally misaligned, and should be realigned.

What was done for the alignment:

1. Aligned the arms (ran ASS).

2. Aligned the beam to all the REFL and AS PDs. 

3. Misaligned the ETMs and ITMX. 

4. Locked PRM+ITMY using REFL11.
The following were modified to enable locking
(1) PRCL gain changed from +2.0 to -12.
(2) Power normalization matrix for PRCL changed from +10.0 to 0.
(3) FM3 in PRCL servo filter module was turned OFF.

5. POP PDs were aligned.

ELOG V3.1.3-