Entry  Wed Jul 31 21:12:05 2013, manasa, Update, General, Pump down called off 
    Reply  Thu Aug 1 16:03:52 2013, Steve, Update, General, reopen BS & IOO IOOnorth.jpg
    Reply  Thu Aug 1 22:49:31 2013, manasa, Update, General, Green status after PR3 flipping investigated 
       Reply  Fri Aug 2 17:50:10 2013, Jenne, Update, General, PR3 wedge angle adjusted 
          Reply  Fri Aug 2 22:51:10 2013, Jenne, Update, General, All vent tasks complete, just need oplev check 
             Reply  Mon Aug 5 18:02:34 2013, manasa, Update, General, Close up list checked 
             Reply  Tue Aug 6 07:52:58 2013, manasa, Update, General, Ready to pump down MCspot_0806.pngOSEM_0806.pngOL_0806.pngQPD_0806.png
Message ID: 8969     Entry time: Tue Aug 6 07:52:58 2013     In reply to: 8962
Author: manasa 
Type: Update 
Category: General 
Subject: Ready to pump down 

I did an alignment check of the IFO before we start pumping down.

Arms were locked. PRM and SRM were aligned. Green was aligned to the arms for reference during the pump down.

Steve! It's a GO!

MC spot positions:

MCspot_0806.png

OSEM:

OSEM_0806.png

Oplevs were all centered yesterday and haven't drifted much. So I left them as is.

OL_0806.png

QPDs (IPPOS aligned from yesterday.

QPD_0806.png