Wed Jul 31 21:12:05 2013, manasa, Update, General, Pump down called off
|
Thu Aug 1 16:03:52 2013, Steve, Update, General, reopen BS & IOO
|
Thu Aug 1 22:49:31 2013, manasa, Update, General, Green status after PR3 flipping investigated
|
Fri Aug 2 17:50:10 2013, Jenne, Update, General, PR3 wedge angle adjusted
|
Fri Aug 2 22:51:10 2013, Jenne, Update, General, All vent tasks complete, just need oplev check
|
Mon Aug 5 18:02:34 2013, manasa, Update, General, Close up list checked
|
Tue Aug 6 07:52:58 2013, manasa, Update, General, Ready to pump down   
|
|
Message ID: 8965
Entry time: Mon Aug 5 18:02:34 2013
In reply to: 8962
|
Author: |
manasa |
Type: |
Update |
Category: |
General |
Subject: |
Close up list checked |
|
|
-
Center beam on all AS optics
-
GET CAMERA IMAGES OF EVERYTHING
- We must get images right before closing, right after closing, etc.
Make sure REFL is clear
- dither PRM, see motion on AP tables
Make sure AS is clear
- dither BS/ITM, see motion on AP tables
Using IPANG/POS pick-off mirrors, center beams on:
IPPOS
IPANG (aligned low in pitch)
Check green alignment in the arms and make sure the transmitted green reaches the PSL table.
-
Check all OpLevs centered, in and out of vacuum
[Jenne, Manasa]
IPANG needed to be re-aligned today. Heavy doors are in place and bolts tight (torque 25 & 45).
Steve! We are ready for pump down!
I will check the IFO alignment once again early tomorrow morning before Steve starts pumping down.
|