Entry  Wed Jul 31 21:12:05 2013, manasa, Update, General, Pump down called off 
    Reply  Thu Aug 1 16:03:52 2013, Steve, Update, General, reopen BS & IOO IOOnorth.jpg
    Reply  Thu Aug 1 22:49:31 2013, manasa, Update, General, Green status after PR3 flipping investigated 
       Reply  Fri Aug 2 17:50:10 2013, Jenne, Update, General, PR3 wedge angle adjusted 
          Reply  Fri Aug 2 22:51:10 2013, Jenne, Update, General, All vent tasks complete, just need oplev check 
             Reply  Mon Aug 5 18:02:34 2013, manasa, Update, General, Close up list checked 
             Reply  Tue Aug 6 07:52:58 2013, manasa, Update, General, Ready to pump down MCspot_0806.pngOSEM_0806.pngOL_0806.pngQPD_0806.png
Message ID: 8948     Entry time: Wed Jul 31 21:12:05 2013     Reply to this: 8953   8958
Author: manasa 
Type: Update 
Category: General 
Subject: Pump down called off 

[Koji, Manasa]

We missed to check that we had the green transmitted to the PSL after flipping the SRC and PRC folding mirrors.
There is no green transmission reaching the PSL even after locking the arms to green.

We should fix this tomorrow. The BS heavy door should come off.

Steve! Do not start pump down tomorrow !